Permit #2020070777

Permit Details

Status: COED

Parcel Id: 35-11-31-4075-00000-00W0
Total Square Footage: 34364 sqft
Block: 0
Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION
Job Phone: (386)446-6426
Location Address: 46 RIO VISTA DR
Type: BC - BUILDING COMMERCIAL
Issue Date: 08/17/2020
NOC: RECORDED
Applicant name: SCOTT DALE SOWERS
Owner: MARINA DEL PALMA MASTER ASSC, INC

Address

SUITE 300

PALM COAST, FL 32164

Lot: 00W0
Contracted Stated Job Value: ¤2,000,000.00
Job Description: DRY BOAT STORAGE BUILDING
Type: CN

Contractor

S E CLINE CONSTRUCTION, INC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 354425

PALM COAST, FL 32137

CGC061947 (Exp: 08/31/2028) (386)446-6426 (386)446-6481

Sub Contractors

STEPHEN P THIBAULT
Status Location Address State License Number Phone
ACTIVE

P. O. Box 4398

St. Augustine, FL 32085

EC0002511 (Exp: 08/31/2026) 904-829-6886
DANIEL J LUSINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
ISAAC WALTER JOHNSTON
Status Location Address State License Number Phone
ACTIVE

887 BRENTWOOD DRIVE

Daytona Beach, FL 32117

CFC023634 (Exp: 08/31/2026) (386) 252-7047
FRANK SOUCINEK
Status Location Address State License Number Phone Fax
CANCEL

180 NW AMENITY CT

LAKE CITY, FL 32056

CFC057747 (Exp: 08/31/2024) (386)752-5218 (386)752-5613

Inspection History

Type Request Date Result Inspector
U - UTILITY COMMERCIAL FINAL 10/13/2022 FINAL APPROVED JHARDING
BUILDING FINAL 10/12/2022 APPROVED - AS NOTED PBUCKLEY
Note: 10/6/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3440 THIS IS A RE-INSPECTION Inspector Notes from Inspection 3460 THIS IS A RE-INSPECTION PROVIDE VERIFICATION BUILDING IS ERECTED AS PER PLAN. THIS INSPECTION ADMINISTRATIVELY APPROVED BY THE BUILDING OFFICIAL BASED ON SUBMISSION OF ENGINEERING INSPECTION REPORTS. THIS IS A STEEL BUILDING AND SO DOES NOT HAVE ANY ROOF SHEATHING PER SE AND THE ENGINEER'S INSPECTION REPORTS COVER THE REMAINING ROOF CONSTRUCTION. 7.1.22 - STILL AWAITING ENGINEERING REPORTS AS STATED IN THE LAST INSPECTION NOTES THIS FRAMING INSPECTION PERTAINS TO CONSTRUCTION OF THE INTERIOR OFFICE / BATHROOM AREA AND IS A SEPARATE FRAMING INSPECTION FROM THE BUILDING STEEL STRUCTURAL FRAME INSPECTION THAT WAS PREVIOUSLY ADMINISTRATIVELY APPROVED ON RECEIPT AND ACCEPTANCE OF ENGINEER'S INSPECTION REPORTS. GENERAL CONTRACTOR CHANGED CONSTRUCTION OF BUILDING'S INTERIOR OFFICE / BATHROOM AREA FROM STEEL STUD FRAMING TO CMU'S WITHOUT SUBMITTING PLAN REVISION AND WITHOUT CALLING FOR REQUIRED VERTICAL AND HORIZONTAL reinforcing STEEL AND GROUT POUR INSPECTIONS. I REQUESTED AN ENGINEERING REPORT SHOWING THAT REINFORCING STEELING AND GROUT IS PRESENT IN THE WALLS AND A PLAN REVISION SHOWING THE CHANGE IN CONSTRUCTION ALONG WITH A PLAN THAT BASICALLY MATCHES THE "AS-BUILT" CONDITIONS IDENTIFIED IN THE ENGINEER'S INSPECTION REPORT. THIS FRAMING INSPECTION ADMINISTRATIVELY APPROVED BUT A PLAN REVISION IS STILL REQUIRED TO DOCUMENT THE CHANGE AND DESIGN OF THE CMU WALLS. 10-6-22 - The foam plastic (spray on) insulation at the underside of roof deck structure needs to be seperated from the space below by approved material. Fire rated "lay-in" ceiling tiles may be utilized, or an approved coating acceptable for use over foam plastic insulation. 2603.4 Thermal barrier. Except as provided for in FBC - Sections 2603.4.1 and 2603.9, foam plastic shall be separated from the interior of a building by an approved thermal barrier of 1/2-inch (12.7 mm) gypsum wallboard, heavy timber in accordance with Section 602.4 or a material that is tested in accordance with and meets the acceptance criteria of both the Temperature Transmission Fire Test and the Integrity Fire Test of NFPA 275. 10/12/22 BUILDING FINAL INSPECTION APPROVED. CONTRACTOR SUBMITTED DOCUMENTATION INDICATING SPRAY FOAM INSULATION WAS COVERED WITH AN APPROVED INTUMESCENT COATING IN COMPLAINCE WITH THE REFERENCED CODE SECTIONS. DOCUMENTATION INCLUDING ICC ES REPORT UPLOADED TO PERMIT RECORD. PATRICK BUCKLEY
BUILDING FINAL 10/06/2022 Disapproved - NO FEE DCUSHING
Note: Inspector Notes from Inspection 3440 THIS IS A RE-INSPECTION Inspector Notes from Inspection 3460 THIS IS A RE-INSPECTION PROVIDE VERIFICATION BUILDING IS ERECTED AS PER PLAN. THIS INSPECTION ADMINISTRATIVELY APPROVED BY THE BUILDING OFFICIAL BASED ON SUBMISSION OF ENGINEERING INSPECTION REPORTS. THIS IS A STEEL BUILDING AND SO DOES NOT HAVE ANY ROOF SHEATHING PER SE AND THE ENGINEER'S INSPECTION REPORTS COVER THE REMAINING ROOF CONSTRUCTION. 7.1.22 - STILL AWAITING ENGINEERING REPORTS AS STATED IN THE LAST INSPECTION NOTES THIS FRAMING INSPECTION PERTAINS TO CONSTRUCTION OF THE INTERIOR OFFICE / BATHROOM AREA AND IS A SEPARATE FRAMING INSPECTION FROM THE BUILDING STEEL STRUCTURAL FRAME INSPECTION THAT WAS PREVIOUSLY ADMINISTRATIVELY APPROVED ON RECEIPT AND ACCEPTANCE OF ENGINEER'S INSPECTION REPORTS. GENERAL CONTRACTOR CHANGED CONSTRUCTION OF BUILDING'S INTERIOR OFFICE / BATHROOM AREA FROM STEEL STUD FRAMING TO CMU'S WITHOUT SUBMITTING PLAN REVISION AND WITHOUT CALLING FOR REQUIRED VERTICAL AND HORIZONTAL reinforcing STEEL AND GROUT POUR INSPECTIONS. I REQUESTED AN ENGINEERING REPORT SHOWING THAT REINFORCING STEELING AND GROUT IS PRESENT IN THE WALLS AND A PLAN REVISION SHOWING THE CHANGE IN CONSTRUCTION ALONG WITH A PLAN THAT BASICALLY MATCHES THE "AS-BUILT" CONDITIONS IDENTIFIED IN THE ENGINEER'S INSPECTION REPORT. THIS FRAMING INSPECTION ADMINISTRATIVELY APPROVED BUT A PLAN REVISION IS STILL REQUIRED TO DOCUMENT THE CHANGE AND DESIGN OF THE CMU WALLS. 10-6-22 - The foam plastic (spray on) insulation at the underside of roof deck structure needs to be seperated from the space below by approved material. Fire rated "lay-in" ceiling tiles may be utilized, or an approved coating acceptable for use over foam plastic insulation. 2603.4 Thermal barrier. Except as provided for in FBC - Sections 2603.4.1 and 2603.9, foam plastic shall be separated from the interior of a building by an approved thermal barrier of 1/2-inch (12.7 mm) gypsum wallboard, heavy timber in accordance with Section 602.4 or a material that is tested in accordance with and meets the acceptance criteria of both the Temperature Transmission Fire Test and the Integrity Fire Test of NFPA 275.
HVAC FINAL 10/06/2022 FINAL APPROVED CPISCITELLI
Note: THIS IS A REINSPECTION not ready. Need to revise plans
FRAMING 09/01/2022 APPROVED - AS NOTED PBUCKLEY
Note: THIS IS A RE-INSPECTION Inspector Notes from Inspection 3460 THIS IS A RE-INSPECTION PROVIDE VERIFICATION BUILDING IS ERECTED AS PER PLAN. THIS INSPECTION ADMINISTRATIVELY APPROVED BY THE BUILDING OFFICIAL BASED ON SUBMISSION OF ENGINEERING INSPECTION REPORTS. THIS IS A STEEL BUILDING AND SO DOES NOT HAVE ANY ROOF SHEATHING PER SE AND THE ENGINEER'S INSPECTION REPORTS COVER THE REMAINING ROOF CONSTRUCTION. 7.1.22 - STILL AWAITING ENGINEERING REPORTS AS STATED IN THE LAST INSPECTION NOTES THIS FRAMING INSPECTION PERTAINS TO CONSTRUCTION OF THE INTERIOR OFFICE / BATHROOM AREA AND IS A SEPARATE FRAMING INSPECTION FROM THE BUILDING STEEL STRUCTURAL FRAME INSPECTION THAT WAS PREVIOUSLY ADMINISTRATIVELY APPROVED ON RECEIPT AND ACCEPTANCE OF ENGINEER'S INSPECTION REPORTS. GENERAL CONTRACTOR CHANGED CONSTRUCTION OF BUILDING'S INTERIOR OFFICE / BATHROOM AREA FROM STEEL STUD FRAMING TO CMU'S WITHOUT SUBMITTING PLAN REVISION AND WITHOUT CALLING FOR REQUIRED VERTICAL AND HORIZONTAL reinforcing STEEL AND GROUT POUR INSPECTIONS. I REQUESTED AN ENGINEERING REPORT SHOWING THAT REINFORCING STEELING AND GROUT IS PRESENT IN THE WALLS AND A PLAN REVISION SHOWING THE CHANGE IN CONSTRUCTION ALONG WITH A PLAN THAT BASICALLY MATCHES THE "AS-BUILT" CONDITIONS IDENTIFIED IN THE ENGINEER'S INSPECTION REPORT. THIS FRAMING INSPECTION ADMINISTRATIVELY APPROVED BUT A PLAN REVISION IS STILL REQUIRED TO DOCUMENT THE CHANGE AND DESIGN OF THE CMU WALLS.
FIRE FINAL 08/19/2022 APPROVED RMARTIN
Note: ensure knox box and extinguishers are in place
FRAMING 07/01/2022 Disapproved - NO FEE DCUSHING
Note: Inspector Notes from Inspection 3460 THIS IS A REINSPECTION PROVIDE VERIFICATION BUILDING IS ERECTED AS PER PLAN. THIS INSPECTION ADMINISTRATIVELY APPROVED BY THE BUILDING OFFICIAL BASED ON SUBMISSION OF ENGINEERING INSPECTION REPORTS. THIS IS A STELL BUILDING AND SO DOES NOT HAVE ANY ROOF SHEATHING PER SE AND THE ENGINEER'S INSPECTION REPORTS COVER THE REMAINING ROOF CONSTRUCTION. 7.1.22 - STILL AWAITING ENGINEERING REPORTS AS STATED IN THE LAST INSPECTION NOTES
ELECTRIC FINAL 07/01/2022 APPROVED JMUNSON
ROOF SHEATHING / BRACE / TIE DOWN 06/17/2022 APPROVED - AS NOTED PBUCKLEY
Note: THIS IS A REINSPECTION PROVIDE VERIFICATION BUILDING IS ERECTED AS PER PLAN. THIS INSPECTION ADMINISTRATIVELY APPROVED BY THE BUILDING OFFICIAL BASED ON SUBMISSION OF ENGINEERING INSPECTION REPORTS. THIS IS A STEEL BUILDING AND SO DOES NOT HAVE ANY ROOF SHEATHING PER SE AND THE ENGINEER'S INSPECTION REPORTS COVER THE REMAINING ROOF CONSTRUCTION.
PLUMBING FINAL 06/02/2022 APPROVED MGIBSON
BLD - GREASE INTERCEPTOR PLUMBING & VENTING 05/26/2022 APPROVED MGIBSON
GRAVITY SEWER 05/26/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION Not ready for inspection
PLUMBING 2ND ROUGH 05/24/2022 APPROVED - AS NOTED MGIBSON
Note: THIS IS A REINSPECTION Change in construction manager. See Mike Holland upon arrival. Looks like this inspection may have been missed. Provide direction to construction manager as to how to proceed to obtain 2nd roug-in approval. See Patrick with any questions. SPOKE WITH MIKE UNDERWOOD HE WILL BE PRESENT AT TIME OF SCHEDULED INSPECTION, AND HE WAS ADVISED AS TO WHAT NEEDS TO BE DONE SECOND ROUGH IS APPROVED, BEFORE PLUMBING FINAL CAN BE SCHEDULED NEED WATER HEATER TO HAVE VACCUME BREAKER INSTALLED FOR BOTTOM FEED WATER HEATER, NEED PAN DRAIN LINE TO BE CPVC NOT PVC, NEED 3'' TO TERMINATE TO OPEN AIR STUDDER VENT NOT ALLOWED, AND NEED TO CHANGE PLUMBING CONTRACTOR TO ''MASTER CRAFT
FOOTER 04/27/2022 APPROVED - AS NOTED PBUCKLEY
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION grade beams (highlighted on plans in field and approved plans in construction office) 4/12/22 - PROVIDE PROOF OF REBAR IN FOOTER AND PROOF OF PSI IN CONCRETE. FOOTING INSPECTIONS ADMINISTRATIVELY APPROVED BY CBO BASED ON 18 DIFFERENT ENGINEERING REPORTS SUBMITTED DOCUMENTING INSPECTIONS OF ALL FOOTINGS BY FLORIDA LICENSED P.E. ALL INSPECTION REPORTS ATTACHED TO PERMIT RECORD.
FRAMING 04/12/2022 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Construction management has changed. See Mike Underwood when on site. Building is a steel building, ask for engineer's inspection report to approve framing inspection. Advise on what is needed for fre final. See Patrick with any questions. 9-8-21... No Inspection, Need contractor on site for inspection 4/12/22 - BUILDING IS COMPLETE, INSPECTION MISSED. WILL NEED LETTERS FROM THE ENGINEER AND MANUFACTURER SHOWING ERECTED AS PER DESIGNED.
ABOVE CEILING 04/12/2022 APPROVED - AS NOTED RMARTIN
Note: NO ABOVE CEILING NEEDED
INSULATION 04/12/2022 APPROVED - AS NOTED FWILLIS
Note: DID NOT SEE WHERE INSULATION WAS NEEDED.
STOREFRONT 04/12/2022 Disapproved - NO FEE FWILLIS
Note: WILL CHECK ON NEXT INSPECTION. MIGHT NOT BE NEEDED.
FOOTER 04/12/2022 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION grade beams (highlighted on plans in field and approved plans in construction office) 4/12/22 - PROVIDE PROOF OF REBAR IN FOOTER AND PROOF OF PSI IN CONCRETE.
GRAVITY SEWER 04/12/2022 Disapproved - NO FEE PBUCKLEY
Note: Not ready for inspection
HVAC ROUGH 04/12/2022 APPROVED - AS NOTED CPISCITELLI
Note: THIS IS A REINSPECTION submit revision showing onsite conditions will look at all on final.
HVAC FINAL 04/12/2022 Disapproved - NO FEE CPISCITELLI
Note: not ready. Need to revise plans
ROOF SHEATHING / BRACE / TIE DOWN 04/12/2022 Disapproved - NO FEE FWILLIS
Note: PROVIDE VERIFICATION BUILDING IS ERECTED AS PER PLAN.
EXTERIOR ARCHITECTURAL FEATURES 04/12/2022 APPROVED - AS NOTED JHARDING
Note: Must submit revised plans to Damaris Ramiros at CITY HALL.
HVAC ROUGH 09/08/2021 CANCELLED BY APPLICANT CPISCITELLI
Note: New Construction managment. See Mike Underwood on site. Looks like they may have missed required HVAC rough inspection. According to Mike, no mechanical in stack house but a mini-split and possibly exhaust fans in small office and bathroom areas. Advise Mr. Underwood what he needs to do in order to proceed towards HVAC rough inspection approval. See Patrick with any questions.
PLUMBING 2ND ROUGH 09/08/2021 Disapproved - NO FEE JGIBSON
Note: Change in construction manager. See Mike Holland upon arrival. Looks like this inspection may have been missed. Provide direction to construction manager as to how to proceed to obtain 2nd roug-in approval. See Patrick with any questions. SPOKE WITH MIKE UNDERWOOD HE WILL BE PRESENT AT TIME OF SCHEDULED INSPECTION, AND HE WAS ADVISED AS TO WHAT NEEDS TO BE DONE
FRAMING 09/08/2021 Disapproved - NO FEE LMILLER
Note: Construction management has changed. See Mike Underwood when on site. Building is a steel building, ask for engineer's inspection report to approve framing inspection. Advise on what is needed for fre final. See Patrick with any questions. 9-8-21... No Inspection, Need contractor on site for inspection
ELECTRIC 1ST ROUGH 08/13/2021 APPROVED RMARTIN
ELECTRIC 2ND ROUGH 08/13/2021 APPROVED RMARTIN
ELECTRIC - EARLY POWER 06/25/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:50
MONOLITHIC SLAB 05/20/2021 PARTIALLY APPROVED BGREVE
Note: only boat ramp area
LINTEL 04/15/2021 APPROVED JBODEN
FOUNDATION SURVEY - OFFICE USE ONLY 04/13/2021 APPROVED DLEAP
BLD - SEWER TIE IN 02/10/2021 APPROVED - AS NOTED JGIBSON
Note: THIS WAS SUPPOSED TO BE U-SEWER TIE IN
U - SEWER TIE IN 02/10/2021 APPROVED JGIBSON
MONOLITHIC SLAB 09/09/2020 APPROVED WMILLER
Note: THIS IS A REINSPECTION ADDED ON 9/3/2020 2:59:45 PM THIS IS A REINSPECTION THIS IS A REINSPECTION (approved areas highlighted on plans in field and approved plans in construction office) Partial (section highlighted on plans in construction office) 9-3-2020.... All eccept Grade beam and track at door 9-9-2020... APPROVED
MONOLITHIC SLAB 09/03/2020 PARTIALLY APPROVED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION (approved areas highlighted on plans in field and approved plans in construction office) Partial (section highlighted on plans in construction office) 9-3-2020.... All eccept Grade beam and track at door
ELECTRIC UNDERGROUND 09/03/2020 APPROVED - AS NOTED RMARTIN
Note: LOOKED AT UFER RE-BAR, AND SERVICE CONDUITS UNDER SLAB
PLUMBING 1ST ROUGH 09/02/2020 APPROVED JGIBSON
MONOLITHIC SLAB 09/02/2020 PARTIALLY APPROVED WMILLER
Note: THIS IS A REINSPECTION (approved areas highlighted on plans in field and approved plans in construction office) Partial (section highlighted on plans in construction office)
FIRE PUMP 1ST RGH/PLACEMENT 09/02/2020 APPROVED - AS NOTED WMILLER
Note: This was called in by the GC because there was no Fire Underground permit approval yet. This is only a visual (the Fire Underground is in apply status and no documents are on site). Must match Documents for Fire Underground for approval under the Fire Undrground Permit.
MONOLITHIC SLAB 08/27/2020 PARTIALLY APPROVED WMILLER
Note: (approved areas highlighted on plans in field and approved plans in construction office)
FOOTER 08/27/2020 PARTIALLY APPROVED WMILLER
Note: grade beams (highlighted on plans in field and approved plans in construction office)

Review History

Department Status Date In Date Out
ARCHR COMPLETE 09/22/2022 09/22/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD COMPLETE 09/21/2022 09/22/2022
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
MECH HOLD 08/12/2022 08/12/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide fresh air duct on duct layout
MECH HOLD 07/07/2022 07/07/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Digital signature and seal needs to be verifiable. Unable to Verify per F.S. 471.025
PLENG COMPLETE 04/13/2021 04/13/2021
Note: Released By: DENNIS LEAP - - DLEAP@PALMCOASTGOV.COM
PLENG HOLD 04/09/2021 04/09/2021
Note: Held By: DENNIS LEAP - - DLEAP@PALMCOASTGOV.COM Foundation Survey 1. Provide building tie to east property line 2. Provide building tie to south property line.
ENGIN1 CANCEL 04/07/2021 04/09/2021
DSD CANCEL 04/07/2021 04/09/2021
MECH COMPLETE 08/14/2020 08/14/2020
Note: Released By: CPISCITELLI
ELEC COMPLETE 08/14/2020 08/17/2020
Note: Released By: JMUNSON
ARCHR COMPLETE 08/14/2020 08/14/2020
Note: Released By: BDAWSON
BADMIN COMPLETE 07/23/2020 07/23/2020
Note: Released By: LMUSGROVE
ARCHR HOLD 07/23/2020 08/03/2020
Note: Held By: BDAWSON - Architectural elevations do not match what was approved on the site development permit. Elevations should also call out all color selections.
BLD COMPLETE 07/23/2020 08/07/2020
Note: Released By: JBODEN
DSD COMPLETE 07/23/2020 07/24/2020
Note: Released By: JGONZALEZ
ELEC HOLD 07/23/2020 07/28/2020
Note: Held By: JMUNSON 1. Plans need to be signed and sealed. FAC 61G15- 23.001 2. Clarify all of the revision bubbles.
FI1 COMPLETE 07/23/2020 08/05/2020
Note: Released By: JBODEN
MECH HOLD 07/23/2020 07/28/2020
Note: Held By: CPISCITELLI 1. Mechanical Plans need engineer's seal. FAC 61G15-23.001 2. Clarify revision bubbles on plans
PLUM COMPLETE 07/23/2020 08/06/2020
Note: Released By: JBODEN
UD1 COMPLETE 07/23/2020 07/24/2020
Note: Released By: CJOHNSON
BADMIN HOLD 07/16/2020 07/16/2020
Note: Held By: BBEMBRY Plans must be submitted as individual pages . The file names must match the naming convention outlined on the 'document submittal guidelines' on the permit portal page. One set of plans is required, I am unsure if the submittal consists of two sets of plans. If there is more than one building - each building will require a separate permit.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION - COMMERCIAL ¤60.00 10/12/2022
EXTENSION ¤40.00 02/01/2022
CONTRACTOR CHANGE ¤40.00 10/13/2020
BUILDING DISCOUNT 100% (¤17,140.00) 08/17/2020
ELECTRIC FEE ¤1,260.00 08/17/2020
3% FIRE IMPACT FEE CREDIT (¤291.96) 08/17/2020
IMPACT FEE FIRE ¤9,731.88 08/17/2020
MECHANICAL FEE ¤1,260.00 08/17/2020
PERMIT FEE ¤11,000.00 08/17/2020
PLAN CHECK FEE ¤2,300.00 08/17/2020
PLUMBING FEE ¤1,260.00 08/17/2020
SITE PLAN 20 ¤20.00 08/17/2020
SURCHARGE FS 533.721 ¤2.00 08/17/2020
SURCHARGE - FS 468.631 ¤2.00 08/17/2020
ADMIN COMMERCIAL ¤60.00 08/17/2020
Fees Total Due: ¤0.00 Total Paid: ¤9,603.92