Permit #2020070852

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00340-0110
CONDITIONED SPACE: 1236 sqft
GARAGE: 472 sqft
OPENED PORCH (WITH ROOF) : 65 sqft
Total Square Footage: 1773 sqft
Block: 00340
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 386-931-2131
Location Address: 24 POST LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/19/2020
NOC: RECORDED
Applicant name: FLAGLER HABITAT
Owner: FLAGLER HABITAT FOR HUMANITY INC

Address

PO BOX 187

BUNNELL, FL 32110

Lot: 0110
Contracted Stated Job Value: ¤80,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLAGLER HABITAT
Status Location Address State License Number Phone
ACTIVE

2 WEST MOODY BLVD

BUNNELL, FL 32110

HABITAT 386-931-2131

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
MICHAEL A PENAGOS
Status Location Address State License Number Phone
ACTIVE

3321 GLENSHANE WAY

ORMOND BEACH, FL 32174

CCC1330460 (Exp: 08/31/2026) 386-569-9133
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/25/2021 FINAL APPROVED MMESSER
U-CROSS CONNECTION 03/25/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
U -UTILITY RESIDENTIAL FINAL 03/25/2021 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 03/24/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS INSPECTION WAS APPROVED ALL READY
ROW - FINAL APRON (AFTER POUR) 03/24/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION EMPTY LOT AT THE EDGE NEED TO PLACE SOD OR SEEDED OR COVER W/STAW AND/OR PINE NEEDLE CHECK FOR PAVEMENT REPAIR. REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT 03/19/2021= IT IS A TRIP HAZARD NEED A HOT PATCH 03/23/2021=THE ROAD NEED A HOT PATCH 03/24/2021=CORRECTION WERE MADE
ROW - FINAL APRON (AFTER POUR) 03/23/2021 Disapproved - NO FEE GBERTOLA
Note: THIS IS A REINSPECTION EMPTY LOT AT THE EDGE NEED TO PLACE SOD OR SEEDED OR COVER W/STAW AND/OR PINE NEEDLE CHECK FOR PAVEMENT REPAIR. REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT 03/19/2021= IT IS A TRIP HAZARD NEED A HOT PATCH 03/23/2021=THE ROAD NEED A HOT PATCH
ROW - STORMWATER FINAL 03/23/2021 Disapproved - NO FEE GBERTOLA
Note: THE ROAD NEED A HOT PATCH
ROW - STORMWATER FINAL 03/23/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A DUPLICATE THIS INSPECTION WAS APROVE
ROW - FINAL APRON (AFTER POUR) 03/19/2021 Disapproved - NO FEE GBERTOLA
Note: EMPTY LOT AT THE EDGE NEED TO PLACE SOD OR SEEDED OR COVER W/STAW AND/OR PINE NEEDLE CHECK FOR PAVEMENT REPAIR. REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT 03/19/2021= IT IS A TRIP HAZARD THE LIP LEFTED AT THE EDGE OF APRON BY THE ROAD NEED A HOT PATCH
ROW - STORMWATER FINAL 03/19/2021 APPROVED - AS NOTED GBERTOLA
Note: EMPTY LOT AT THE EDGE NEED TO PLACE SOD OR SEEDED OR COVER W/STAW AND/OR PINE NEEDLE CHECK FOR PAVEMENT REPAIR. REPAIR THE ROAD ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT 03/19/2021= IT IS A TRIP HAZARD THE LIP LEFTED AT THE EDGE OF APRON BY THE ROAD NEED A HOT PATCH
ROW FIELD SURVEY /GRADING CERTIFICATION 03/17/2021 APPROVED GBERTOLA
FINAL SURVEY (OFFICE USE ONLY) 03/17/2021 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 01/28/2021 APPROVED - AS NOTED GBERTOLA
Note: READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. I WOULD ADD A FORM TO THE BOTTOM OF THE END OF THE MITERS SO CONCRETE DOES NOT GET POURED INTO THE SWALE.
GRAVITY SEWER TEST 01/14/2021 APPROVED JGIBSON
U - SEWER TIE IN 01/14/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 01/12/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:00
PEP TANK INSTALLATION REQUEST 12/16/2020 APPROVED CSTONE
INSULATION 12/15/2020 APPROVED MMESSER
ALL ROUGH 12/11/2020 APPROVED MMESSER
ROOF VALLEY & METAL 12/07/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2020 APPROVED MMESSER
WINDOW NAILING 11/18/2020 APPROVED MMESSER
WALL SHEATHING 10/27/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 10/22/2020 APPROVED TBAKER
ELECTRIC TEMP POLE 10/09/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 8:45
MONOLITHIC SLAB 09/28/2020 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 09/23/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 09/09/2020 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/21/2020 10/22/2020
Note: Released By: TBAKER
ZON COMPLETE 10/21/2020 10/21/2020
Note: Released By: TDOAK
BLD COMPLETE 08/11/2020 08/17/2020
Note: Released By: PBUCKLEY
ELEC COMPLETE 08/11/2020 08/12/2020
Note: Released By: JMUNSON
ZON COMPLETE 08/11/2020 08/11/2020
Note: Released By: ELENS
MECH COMPLETE 08/11/2020 08/12/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 08/11/2020 08/11/2020
Note: Released By: JPI
BLD HOLD 07/30/2020 07/30/2020
Note: Held By: PBUCKLEY COMMENTS FROM JPI REVIEW REVISED BELOW. PLEASE RESPOND TO THIS REVISED LIST OF COMMENTS. 1. Product approval spec sheet missing the following items: roof shingles, underlayment and roof vent. 2. Wall sections illustrate exterior sheathing in contact with soil. Minimum distance to ground is 6 per R317.1. Illustrate dimension on plans. 3. Door schedule does not call out door to hall bath. Please provide. Must meet R320 for minimum size. 4. Attic ventilation calculation table is incomplete/blank.
SWALE COMPLETE 07/20/2020 07/29/2020
Note: Released By: TBAKER
BLD HOLD 07/17/2020 07/22/2020
Note: Held By: JPI 1. Smoke and carbon monoxide detectors to maintain clearances from supply/return ductwork, bathrooms, kitchen cooking appliances, etc… per R314/315. Combo detector located outside bedroom 2 and 3 must maintain a minimum 3 foot distance from bathroom. 2. Product approval spec sheet missing the following items: roof shingles, underlayment and roof vent. 3. Wood header detail on page A3 calls out for SP4 at king stud, clarify if same strap will be used on common studs in the load bearing wall. 4. Wall sections illustrate exterior sheathing in contact with soil. Minimum distance to ground is 6” per R317.1. Illustrate dimension on plans. 5. Door schedule does not call out door to hall bath. Please provide. Must meet R320 for minimum size. 6. Provide locations of hazardous glass. R08.4. 7. Attic ventilation calculation table is incomplete/blank. 8. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided.
CUSVC COMPLETE 07/17/2020 07/22/2020
Note: Released By: HHAND
ELEC HOLD 07/17/2020 07/20/2020
Note: Held By: JMUNSON Submit Electrical load calculations
ENGIN1 COMPLETE 07/17/2020 07/20/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/17/2020 07/20/2020
Note: Released By: CSTONE
MECH HOLD 07/17/2020 07/20/2020
Note: Held By: CPISCITELLI Orientation of Energy calcs does not match the site plan. Revise to match the site plan
PLUM HOLD 07/17/2020 07/22/2020
Note: Held By: JPI 1. Plumbing page P1 does not illustrate DWV properly. There is a connection shown to refrigerator rather than kitchen sink. 2. Isometric plumbing plan does not indicate a vent for kitchen sink. 3. Please coordinate both plumbing plans to match.
SW1 COMPLETE 07/17/2020 07/20/2020
Note: Released By: CTROHA
UTL COMPLETE 07/17/2020 07/21/2020
Note: Released By: LFITZGERALD
ZON HOLD 07/17/2020 07/20/2020
Note: Held By: ELENS Site plan is missing rear setback from the closest point of the residence to the rear property line. (It has the arrow, but not the distance.) The landscape plan requires a shrub to be placed on the site of the A/C pad to properly screen it. You can add another 7 gallon shrub on the side, or move the one from the rear of the A/C pad to the side of the A/C pad. (I just added one for you on the plan I reviewed last week, but this needs to be corrected on this and future submissions.)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 08/19/2020
WATER- TURN ON ¤25.00 08/19/2020
ADMIN FEE ¤20.00 08/19/2020
CONNECTION FEES ¤1,002.88 08/19/2020
BUILDING DISCOUNT 100% (¤867.80) 08/19/2020
ELECTRIC FEE ¤155.40 08/19/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 08/19/2020
IMPACT FEE FIRE ¤223.38 08/19/2020
IMPACT FEE PARKS ¤849.24 08/19/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 08/19/2020
MECHANICAL FEE ¤155.40 08/19/2020
WATER -IRRIGATION INSPECTION ¤25.00 08/19/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/19/2020
PLAN CHECK FEE ¤63.60 08/19/2020
PLUMBING FEE ¤155.40 08/19/2020
NEW RESIDENTIAL INSPECTIONS ¤318.00 08/19/2020
SITE PLAN 20 ¤20.00 08/19/2020
SURCHARGE FS 533.721 ¤2.00 08/19/2020
SURCHARGE - FS 468.631 ¤2.00 08/19/2020
STORM WATER PERMIT FEES ¤80.00 08/19/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 08/19/2020
SEWER CREDIT (¤650.00) 08/19/2020
SEWER INSPECTION ¤25.00 08/19/2020
SEWER CAPITAL FACILITY ¤4,596.07 08/19/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 08/19/2020
Fees Total Due: ¤0.00 Total Paid: ¤11,226.35