I want to search for...
Permit #2020070879
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00240-0020 |
| CONDITIONED SPACE: 1290 sqft |
| GARAGE: 521 sqft |
| OPENED PORCH (WITH ROOF) : 225 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| Total Square Footage: 2078 sqft |
| Block: 00240 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 386-447-4151 |
| Location Address: 58 POPLAR DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/05/2021 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: BLACK, RICHARD & MELISSA |
|
Address 137 NORTH SQUARE LANE NEWMAN, GA 30263 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/12/2022 | FINAL APPROVED | KSANDOE |
| U-CROSS CONNECTION | 05/10/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 05/10/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: builder super Gene informed to change out sewer clean out cap to a flush mount to be lowered to sod grade | |||
| ROW - STORMWATER FINAL | 03/23/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 03/23/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/10/2022 | APPROVED | GBERTOLA |
| FINAL SURVEY (OFFICE USE ONLY) | 03/10/2022 | APPROVED | GBERTOLA |
| Note: met with grader on site and decided to go with the site plan rather than lot grading plan no need for retention area | |||
| ELECTRIC - EARLY POWER | 03/08/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:22 am | |||
| ROW- PRE-APRON (PRE-POUR) | 11/04/2021 | APPROVED - AS NOTED | RGROSS |
| Note: READY TO POUR at the time of Inspetion. Heavey rain in the forecast. Builder should double check elevations before pouring. | |||
| U - SEWER TIE IN | 10/22/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 10/22/2021 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 09/20/2021 | APPROVED | CSTONE |
| INSULATION | 09/14/2021 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 09/01/2021 | APPROVED | KSANDOE |
| ALL ROUGH | 08/26/2021 | APPROVED | JPI |
| ROOF VALLEY & METAL | 08/02/2021 | Disapproved - NO FEE | JWALKER |
| Note: Drip edge has not been installed. | |||
| ROOF VALLEY & METAL | 08/02/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Drip edge has not been installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/29/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 06/14/2021 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 05/25/2021 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 05/25/2021 | APPROVED | MMESSER |
| ELECTRIC TEMP POLE | 05/04/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:58 am | |||
| MONOLITHIC SLAB | 04/28/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/15/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 03/16/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/14/2021 | 06/14/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/14/2021 | 06/14/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | CANCEL | 09/01/2020 | 09/01/2020 |
| ENGIN1 | COMPLETE | 09/01/2020 | 09/02/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 09/01/2020 | 09/02/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 09/01/2020 | 09/03/2020 |
| Note: Released By: LFITZGERALD | |||
| ELEC | COMPLETE | 08/07/2020 | 08/10/2020 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 08/07/2020 | 08/11/2020 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 07/20/2020 | 07/29/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 07/17/2020 | 07/22/2020 |
| Note: Held By: JPI 1. Product approval spec sheet missing the following items: mullions. 2. On building section on page 4, please provide full structural construction details on section cut through front covered entry. Detail all connections and method of attachments. Please include any box framing. R301. 3. Clarify construction of rear porch columns. Are they ICF or masonry? Beam detail on page 4 depicts CMU. 4. Dowel plan on page 5 does not match ICF notes on page 2 for rebar placement. Foundation plan appears to be for CMU construction not ICF. Clarify and correct. 5. Provide details for mixed construction of CMU and ICF at lintels. Beam detail on page 4 illustrates CMU construction. 6. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided. | |||
| CUSVC | COMPLETE | 07/17/2020 | 07/22/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 07/17/2020 | 07/20/2020 |
| Note: Held By: JMUNSON Need to have kitchen outlets for counter space. NEC 2014 art 210.52 (C) | |||
| ENGIN1 | COMPLETE | 07/17/2020 | 07/20/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/17/2020 | 07/20/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 07/17/2020 | 07/20/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 07/17/2020 | 07/22/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 07/17/2020 | 07/20/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 07/17/2020 | 07/21/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 07/17/2020 | 07/20/2020 |
| Note: Released By: ELENS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 05/13/2022 |
| BUILDING DISCOUNT 100% | (¤939.20) | 03/05/2021 |
| ELECTRIC FEE | ¤165.60 | 03/05/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 03/05/2021 |
| IMPACT FEE FIRE | ¤223.38 | 03/05/2021 |
| IMPACT FEE PARKS | ¤849.24 | 03/05/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/05/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 03/05/2021 |
| MECHANICAL FEE | ¤165.60 | 03/05/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/05/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/05/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/05/2021 |
| PLAN CHECK FEE | ¤70.40 | 03/05/2021 |
| PLUMBING FEE | ¤165.60 | 03/05/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤352.00 | 03/05/2021 |
| SITE PLAN 20 | ¤20.00 | 03/05/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/05/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/05/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/05/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 03/05/2021 |
| SEWER CREDIT | (¤650.00) | 03/05/2021 |
| SEWER INSPECTION | ¤25.00 | 03/05/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 03/05/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 03/05/2021 |
| METER - DEPOSIT | ¤60.00 | 03/05/2021 |
| METER - DEPOSIT | ¤60.00 | 03/05/2021 |
| WATER-METER | ¤441.07 | 03/05/2021 |
| WATER- TURN ON | ¤25.00 | 03/05/2021 |
| WATER- TURN ON | ¤25.00 | 03/05/2021 |
| ADMIN FEE | ¤20.00 | 03/05/2021 |
| CONNECTION FEES | ¤14.95 | 03/05/2021 |
| CONNECTION FEES | ¤1,017.83 | 03/05/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 03/05/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 03/05/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,646.07 |