Permit #2020070941
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00470-0110 |
| CONDITIONED SPACE: 2335 sqft |
| GARAGE: 443 sqft |
| OPENED PORCH (WITH ROOF) : 208 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| Total Square Footage: 3044 sqft |
| Block: 00470 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-447-4400 |
| Location Address: 2 ESSINGTON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/13/2020 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: FLOYD MELVA & WALTER A FLOYD W&H |
|
Address 660 NW 65TH TERRACE MARGATE, FL 33063 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤340,000.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/27/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 05/25/2021 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/24/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 05/24/2021 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION INVERT NUMBERS WON'T MATCH WITH THE CITY SWALE PLAN INVERT NUMBER IS 4.50 FINAL SURVEY NUMBERS = RIGHT SIDE 24.25 LEFT SIDE 24.24 TOLERANCE IS NO MORE THE 2/10 5/24/21 - Builder had a re-survey and corrections were made. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/19/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: INVERT NUMBERS WON'T MATCH WITH THE CITY SWALE PLAN INVERT NUMBER IS 4.50 FINAL SURVEY NUMBERS = RIGHT SIDE 24.25 LEFT SIDE 24.24 TOLERANCE IS NO MORE THE 2/10 | |||
| ROW - STORMWATER FINAL | 05/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/19/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 05/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD CULVERT PIPE ARE GOOD | |||
| U-CROSS CONNECTION | 05/03/2021 | APPROVED - AS NOTED | JHARDING |
| Note: Approved no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/08/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Approved for the Apron, pipe and paver restraints pour. 4/8/21 - Ready for pavers | |||
| ROW- PAVER RESTRAINTS | 03/29/2021 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 03/29/2021 | PARTIALLY APPROVED | RGROSS |
| Note: Approved for the Apron, pipe and paver restraints pour. | |||
| ELECTRIC - EARLY POWER | 03/22/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:23 am | |||
| U - SEWER TIE IN | 03/04/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 02/22/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: PEP TANK NEEDS TO BE LOWERED ABOUT 8 1/2 ''TO ACOMINDATE PLUMBERS | |||
| PEP TANK INSTALLATION REQUEST | 01/22/2021 | APPROVED | CSTONE |
| INSULATION | 01/20/2021 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 01/20/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 01/14/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/02/2020 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 12/02/2020 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 11/04/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION BED JOINT ON WINDOW SILLS EXCEED THE BUILDING CODE. R606.3.1 (3/8" TO 1/2") HIGHLIGHTED IN GREEN. 11/4/20 - Issues Corrected | |||
| TIE BEAM / LINTEL | 11/02/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: BED JOINT ON WINDOW SILLS EXCEED THE BUILDING CODE. R606.3.1 (3/8" TO 1/2") HIGHLIGHTED IN GREEN. | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/27/2020 | APPROVED | TBAKER |
| ELECTRIC TEMP POLE | 10/14/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:18 am | |||
| ELECTRIC TEMP POLE | 10/13/2020 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 10/12/2020 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/02/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/31/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/26/2020 | 10/27/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 10/26/2020 | 10/26/2020 |
| Note: Released By: TDOAK | |||
| BLD | COMPLETE | 08/03/2020 | 08/10/2020 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 08/03/2020 | 08/05/2020 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 08/03/2020 | 08/03/2020 |
| Note: Released By: AMOBLEY | |||
| MECH | COMPLETE | 08/03/2020 | 08/05/2020 |
| Note: Released By: CPISCITELLI | |||
| BLD | HOLD | 07/30/2020 | 07/30/2020 |
| Note: Held By: PBUCKLEY 1. Product approval missing the following items: underlayment/roofing. | |||
| SWALE | COMPLETE | 07/21/2020 | 07/30/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 07/20/2020 | 07/24/2020 |
| Note: Held By: JPI 1. Provide components and cladding pressures per Fig R301.2(7). 2. Identify hazardous glass locations. R308.4 3. Product approval missing the following items: underlayment/roofing and roof vents. | |||
| CUSVC | COMPLETE | 07/20/2020 | 07/21/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/20/2020 | 07/21/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 07/20/2020 | 07/21/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/20/2020 | 07/21/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 07/20/2020 | 07/22/2020 |
| Note: Held By: CPISCITELLI Orientation of Energy Calcs and Heatload does not match the site plan. Revise to match the site plan | |||
| PLUM | COMPLETE | 07/20/2020 | 07/24/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 07/20/2020 | 07/21/2020 |
| Note: Held By: CTROHA Doesn't have positive drainage to front swale | |||
| UTL | COMPLETE | 07/20/2020 | 07/22/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 07/20/2020 | 07/21/2020 |
| Note: Held By: AMOBLEY Please have all owners sign and have notarized a right of way agreement for the paver driveway and mail original to us at 160 Lake Ave. Palm Coast, FL 32164 Attn. Zoning LRV for exterior wall does not meet the 25 or greater for earth tones |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/27/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤680.00 | 08/13/2020 |
| SITE PLAN 20 | ¤20.00 | 08/13/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/13/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/13/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/13/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 08/13/2020 |
| SEWER CREDIT | (¤850.00) | 08/13/2020 |
| SEWER INSPECTION | ¤25.00 | 08/13/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 08/13/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 08/13/2020 |
| METER - DEPOSIT | ¤60.00 | 08/13/2020 |
| WATER- TURN ON | ¤25.00 | 08/13/2020 |
| ADMIN FEE | ¤20.00 | 08/13/2020 |
| CONNECTION FEES | ¤1,002.88 | 08/13/2020 |
| BUILDING DISCOUNT 100% | (¤1,628.00) | 08/13/2020 |
| ELECTRIC FEE | ¤264.00 | 08/13/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 08/13/2020 |
| IMPACT FEE FIRE | ¤223.38 | 08/13/2020 |
| IMPACT FEE PARKS | ¤849.24 | 08/13/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/13/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 08/13/2020 |
| MECHANICAL FEE | ¤264.00 | 08/13/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/13/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/13/2020 |
| PLAN CHECK FEE | ¤136.00 | 08/13/2020 |
| PLUMBING FEE | ¤264.00 | 08/13/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,666.35 |