Permit #2020071048

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00190-0100
CONDITIONED SPACE: 1281 sqft
GARAGE: 521 sqft
OPENED PORCH (WITH ROOF) : 42 sqft
OPENED PORCH (WITH ROOF) : 217 sqft
Total Square Footage: 2061 sqft
Block: 00190
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 386-447-4151
Location Address: 45 PINE CROFT LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/17/2020
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: FIRSOV VITALIY

Address

100 DIVISION AVE APT 2B

LEVITTOWN, NY 11756

Lot: 0100
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
GREGG A MCANALLY
Status Location Address State License Number Phone
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

PALM COAST, FL 32092

CAC1815760 (Exp: 08/31/2022) 904-829-8898
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/20/2021 FINAL APPROVED JWALKER
U-CROSS CONNECTION 07/14/2021 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with PVB installed-no cross connection
U -UTILITY RESIDENTIAL FINAL 07/14/2021 APPROVED - AS NOTED LFITZGERALD
Note: pep panel should be no higher than 5ft from final soil grade-currently panel is about 6ft-ok for this inspection BUT in future have the electric wiring come out of the house 3ft from final soil grade/landscape mulch and no further than 3ft in from corner of house-thank you
ROW FIELD SURVEY /GRADING CERTIFICATION 07/13/2021 APPROVED GBERTOLA
ROW - STORMWATER FINAL 07/13/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 07/13/2021 APPROVED GBERTOLA
FINAL SURVEY (OFFICE USE ONLY) 07/13/2021 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION IN THE FINAL SURVEY WE NEED Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) 07/13/2021= correction were made
FINAL SURVEY (OFFICE USE ONLY) 07/08/2021 Disapproved - NO FEE GBERTOLA
Note: IN THE FINAL SURVEY WE NEED Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H)
ELECTRIC - EARLY POWER 05/24/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:35
ROW- PRE-APRON (PRE-POUR) 04/09/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION NEED TO ADD A FORM BOARD TO THE BOTTOM OF THE END OF THE MITERS SO CONCRETE DOES NOT GET POURED INTO THE SWALE. AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 04/08/2021 Disapproved - NO FEE GBERTOLA
Note: NEED TO ADD A FORM BOARD TO THE BOTTOM OF THE END OF THE MITERS SO CONCRETE DOES NOT GET POURED INTO THE SWALE. COLVERT PIPE ELEVATION IS GOOD
U - SEWER TIE IN 04/01/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 04/01/2021 APPROVED JGIBSON
PEP TANK INSTALLATION REQUEST 03/17/2021 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 03/02/2021 APPROVED MMESSER
INSULATION 02/18/2021 APPROVED MMESSER
Note: THIS IS A REINSPECTION Top plate penetrations to be sealed (missing fire foam).
INSULATION 02/16/2021 Disapproved -FEE REQUIRED MMESSER
Note: Top plate penetrations to be sealed (missing fire foam).
ALL ROUGH 02/08/2021 APPROVED JBODEN
ROOF VALLEY & METAL 12/30/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/18/2020 APPROVED JBODEN
TIE BEAM / LINTEL 11/18/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 11/11/2020 APPROVED TBAKER
MONOLITHIC SLAB 10/23/2020 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 10/14/2020 APPROVED JGIBSON
ELECTRIC TEMP POLE 10/07/2020 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION METER CAN IS MISSING FRONT COVER 10/7/20 Emailed FPL at 8:50 am
ELECTRIC TEMP POLE 09/30/2020 Disapproved - NO FEE RMARTIN
Note: METER CAN IS MISSING FRONT COVER
WATER METER INSTALLATION REQUEST 09/28/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/10/2020 11/11/2020
Note: Released By: TBAKER
ZON COMPLETE 11/10/2020 11/10/2020
Note: Released By: AMOBLEY
PLENV COMPLETE 09/17/2020 09/17/2020
Note: Released By: JMYERS The Approved After Action Report has been accepted.
PLENV HOLD 09/04/2020 09/04/2020
Note: Held By: JMYERS Staff has been notified that there are Gopher Tortoise on this lot. Please provide Approved After Action Report once relocation activities have been completed.
ZON COMPLETE 08/25/2020 08/25/2020
Note: Released By: AMOBLEY
BLD COMPLETE 08/07/2020 08/11/2020
Note: Released By: JPI
ZON HOLD 08/07/2020 08/07/2020
Note: Held By: AMOBLEY REPEAT COMMENT: Please make sure landscape plan is not cut off Must have a total of at least four shrubs along each side of home. Left side needs additional shrubs Can not have an office in a single family residence. Please change the office verbiage on plans
SWALE COMPLETE 07/23/2020 07/30/2020
Note: Released By: TBAKER
BLD HOLD 07/22/2020 07/27/2020
Note: Held By: JPI 1. Product approval spec sheet missing the following items: mullions. 2. On building section on page 4, please provide full structural construction details on section cut through front covered entry. Detail all connections and method of attachments. Please include any box framing. R301. 3. Clarify construction of rear porch columns. Are they ICF or masonry? Beam detail on page 4 depicts CMU. 4. Dowel plan on page 5 does not match ICF notes on page 2 for rebar placement. Foundation plan appears to be for CMU construction not ICF. Clarify and correct. 5. Provide details for mixed construction of CMU and ICF at lintels. Beam detail on page 4 illustrates CMU construction. 6. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided.
CUSVC COMPLETE 07/22/2020 07/23/2020
Note: Released By: HHAND
ELEC COMPLETE 07/22/2020 07/23/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 07/22/2020 07/23/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/22/2020 07/24/2020
Note: Released By: CSTONE
MECH COMPLETE 07/22/2020 07/23/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 07/22/2020 07/27/2020
Note: Released By: JPI
SW1 COMPLETE 07/22/2020 07/23/2020
Note: Released By: CTROHA Read stormwater checklist and information packet make corrections for reviews in the future
UTL COMPLETE 07/22/2020 07/27/2020
Note: Released By: LFITZGERALD
ZON HOLD 07/22/2020 07/22/2020
Note: Held By: AMOBLEY Please make sure landscape plan is not cut off Must have a total of at least four shrubs along each side of home. Left side needs additional shrubs Can not have an office in a single family residence. Please change the office verbiage on plans

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/20/2021
REINSPECTION FEE ¤40.00 07/20/2021
NEW RESIDENTIAL INSPECTIONS ¤400.00 09/17/2020
SITE PLAN 20 ¤20.00 09/17/2020
SURCHARGE FS 533.721 ¤2.00 09/17/2020
SURCHARGE - FS 468.631 ¤2.00 09/17/2020
STORM WATER PERMIT FEES ¤80.00 09/17/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 09/17/2020
SEWER CREDIT (¤1,342.00) 09/17/2020
SEWER INSPECTION ¤25.00 09/17/2020
SEWER CAPITAL FACILITY ¤4,596.07 09/17/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 09/17/2020
BUILDING DISCOUNT 100% (¤1,040.00) 09/17/2020
ELECTRIC FEE ¤180.00 09/17/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/17/2020
IMPACT FEE FIRE ¤223.38 09/17/2020
IMPACT FEE PARKS ¤849.24 09/17/2020
IMPACT FEE SCHOOL ¤3,600.00 09/17/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 09/17/2020
MECHANICAL FEE ¤180.00 09/17/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/17/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/17/2020
PLAN CHECK FEE ¤80.00 09/17/2020
PLUMBING FEE ¤180.00 09/17/2020
METER - DEPOSIT ¤60.00 09/17/2020
WATER- TURN ON ¤25.00 09/17/2020
ADMIN FEE ¤20.00 09/17/2020
CONNECTION FEES ¤1,002.88 09/17/2020
CONTRACTOR CHANGE ¤40.00 09/17/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,254.35