I want to search for...

Permit #2020071078

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00370-0300
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
SCREEN PORCH (SOLID ROOF) : 200 sqft
Total Square Footage: 2675 sqft
Block: 00370
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 904-268-7730
Location Address: 25 WHITE HAVEN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/05/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES INC

Address

5220 SHAD ROAD SUITE 202

JACKSONVILLE, FL 32257

Lot: 0300
Contracted Stated Job Value: ¤120,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/21/2020 FINAL APPROVED TSTAUFFACHER
U -UTILITY RESIDENTIAL FINAL 12/21/2020 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 12/18/2020 APPROVED GBERTOLA
ROW - FINAL APRON (AFTER POUR) 12/18/2020 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 12/17/2020 APPROVED - AS NOTED KRUTH
Note: ther is alot of trash on the left side of the house that needs to be cleaned up also need to add seed and straw to areas on the left where the vacant and your lot meet pipe needs the concrete cleaned out as well
FINAL SURVEY (OFFICE USE ONLY) 12/17/2020 APPROVED KRUTH
ROW- PRE-APRON (PRE-POUR) 11/30/2020 APPROVED - AS NOTED KRUTH
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. pump out water at ends of pipe before pour
U - SEWER TIE IN 11/23/2020 APPROVED JGIBSON
U-CROSS CONNECTION 11/17/2020 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-residence being sprinkled
ELECTRIC - EARLY POWER 11/17/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 8:40
PEP TANK INSTALLATION REQUEST 10/26/2020 APPROVED CSTONE
INSULATION 10/14/2020 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION the following was requested at all-rough inspection by Inspector TS and was not resolved Secure washer riser. Will check at insulation
INSULATION 10/13/2020 Disapproved -FEE REQUIRED WMILLER
Note: the following was requested at all-rough inspection by Inspector TS and was not resolved Secure washer riser. Will check at insulation
ALL ROUGH 10/08/2020 APPROVED - AS NOTED TSTAUFFACHER
Note: Secure washer riser. Will check at insulation
ROOF VALLEY & METAL 10/07/2020 APPROVED MMESSER
LATH/BRICK/ WATER BARRIER 10/02/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/01/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 09/30/2020 APPROVED TBAKER
TIE BEAM / LINTEL 09/14/2020 APPROVED FWILLIS
Note: Can we please reinspect as early as possible 9-14 due to rain I'm still trying to pour monday thanks
TIE BEAM / LINTEL 09/11/2020 Disapproved -FEE REQUIRED JBODEN
Note: missing dowels at rear door and two rear windows
MONOLITHIC SLAB 09/03/2020 APPROVED MMESSER
Note: THIS IS A REINSPECTION CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4
MONOLITHIC SLAB 09/02/2020 Disapproved - NO FEE FWILLIS
Note: CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4
GRAVITY SEWER TEST 08/28/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 08/28/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 08/26/2020 CANCELLED BY APPLICANT JGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 08/26/2020 CANCELLED BY APPLICANT JGIBSON
WATER METER INSTALLATION REQUEST 08/11/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 12/08/2020 12/08/2020
Note: Released By: TDOAK
BLD CANCEL 12/08/2020 12/15/2020
ENGIN1 COMPLETE 09/29/2020 09/30/2020
Note: Released By: TBAKER Foundation Survey
ZON COMPLETE 09/29/2020 09/29/2020
Note: Released By: TDOAK
ZON COMPLETE 07/29/2020 07/30/2020
Note: Released By: AMOBLEY
BLD COMPLETE 07/29/2020 07/31/2020
Note: Released By: PBUCKLEY
ENGIN1 COMPLETE 07/29/2020 07/30/2020
Note: Released By: TBAKER
UTL COMPLETE 07/29/2020 07/31/2020
Note: Released By: LFITZGERALD
SW1 COMPLETE 07/29/2020 07/31/2020
Note: Released By: CTROHA
SWALE COMPLETE 07/23/2020 07/31/2020
Note: Released By: TBAKER
BLD HOLD 07/22/2020 07/27/2020
Note: Held By: JPI 1. Color and material sheet illustrates Hardie Plank siding as exterior finish. Plans illustrate stucco. Please clarify finishes. Also identify finish on wood entry walls. All exterior finishes/details should be illustrated on elevations. 2. Page 1.0 calls out for a footing detail at front entry, FM30 on page 1.0. Cannot locate detail on page. Please clarify/correct and provide detail. 3. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided.
CUSVC COMPLETE 07/22/2020 07/23/2020
Note: Released By: HHAND
ELEC COMPLETE 07/22/2020 07/23/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 07/22/2020 07/23/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/22/2020 07/24/2020
Note: Released By: CSTONE
MECH COMPLETE 07/22/2020 07/23/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 07/22/2020 07/27/2020
Note: Released By: JPI
SW1 COMPLETE 07/22/2020 07/23/2020
Note: Released By: CTROHA
UTL COMPLETE 07/22/2020 07/27/2020
Note: Released By: LFITZGERALD
ZON HOLD 07/22/2020 07/23/2020
Note: Held By: AMOBLEY Please show setback from AC pad to property line on site plan Another form of articulation required. Banding missing around garage door See code below... A. Massing requirement.Building massing shall be implemented by use of techniques that reduce the appearanceof high building density or bulk. At least one massing treatment, in addition to thearticulation requirement, shall be included for each 50 linear feet of wall that exceeds50 feet in length. B. Articulation.Facade articulation is required to add interest to a building. The following featuresshall be acceptable techniques of exterior articulation: 1. A base course or plinth course; banding, moldings, or stringcourses; quoins; oriels;cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as partof the exterior wall construction. 2. Quoins and banding shall wrap around the corners of the structure for at least twofeet. 3. Banding placed around the windows and doors visible from the right-of-way, golf course,canals, lakes, or other similar highly visible areas. Window shutters may substitutefor banding. 4. Horizontal banding continuing the length of the wall that faces a street, golf course,saltwater canal, or other similar highly visible areas.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/22/2020
REINSPECTION FEE ¤40.00 12/22/2020
NEW RESIDENTIAL INSPECTIONS ¤490.00 08/05/2020
SITE PLAN 20 ¤20.00 08/05/2020
SURCHARGE FS 533.721 ¤2.00 08/05/2020
SURCHARGE - FS 468.631 ¤2.00 08/05/2020
STORM WATER PERMIT FEES ¤80.00 08/05/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 08/05/2020
SEWER CREDIT (¤234.24) 08/05/2020
SEWER INSPECTION ¤25.00 08/05/2020
SEWER CAPITAL FACILITY ¤4,596.07 08/05/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 08/05/2020
METER - DEPOSIT ¤60.00 08/05/2020
WATER- TURN ON ¤25.00 08/05/2020
ADMIN FEE ¤20.00 08/05/2020
CONNECTION FEES ¤1,002.88 08/05/2020
BUILDING DISCOUNT 100% (¤1,229.00) 08/05/2020
ELECTRIC FEE ¤207.00 08/05/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 08/05/2020
IMPACT FEE FIRE ¤223.38 08/05/2020
IMPACT FEE PARKS ¤849.24 08/05/2020
IMPACT FEE SCHOOL ¤3,600.00 08/05/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 08/05/2020
MECHANICAL FEE ¤207.00 08/05/2020
WATER -IRRIGATION INSPECTION ¤25.00 08/05/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/05/2020
PLAN CHECK FEE ¤98.00 08/05/2020
PLUMBING FEE ¤207.00 08/05/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,322.11