I want to search for...
Permit #2020071078
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00370-0300 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| SCREEN PORCH (SOLID ROOF) : 200 sqft |
| Total Square Footage: 2675 sqft |
| Block: 00370 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 904-268-7730 |
| Location Address: 25 WHITE HAVEN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/05/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES INC |
|
Address 5220 SHAD ROAD SUITE 202 JACKSONVILLE, FL 32257 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤120,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/21/2020 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 12/21/2020 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 12/18/2020 | APPROVED | GBERTOLA |
| ROW - FINAL APRON (AFTER POUR) | 12/18/2020 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/17/2020 | APPROVED - AS NOTED | KRUTH |
| Note: ther is alot of trash on the left side of the house that needs to be cleaned up also need to add seed and straw to areas on the left where the vacant and your lot meet pipe needs the concrete cleaned out as well | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/17/2020 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 11/30/2020 | APPROVED - AS NOTED | KRUTH |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. pump out water at ends of pipe before pour | |||
| U - SEWER TIE IN | 11/23/2020 | APPROVED | JGIBSON |
| U-CROSS CONNECTION | 11/17/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-residence being sprinkled | |||
| ELECTRIC - EARLY POWER | 11/17/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 8:40 | |||
| PEP TANK INSTALLATION REQUEST | 10/26/2020 | APPROVED | CSTONE |
| INSULATION | 10/14/2020 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION the following was requested at all-rough inspection by Inspector TS and was not resolved Secure washer riser. Will check at insulation | |||
| INSULATION | 10/13/2020 | Disapproved -FEE REQUIRED | WMILLER |
| Note: the following was requested at all-rough inspection by Inspector TS and was not resolved Secure washer riser. Will check at insulation | |||
| ALL ROUGH | 10/08/2020 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Secure washer riser. Will check at insulation | |||
| ROOF VALLEY & METAL | 10/07/2020 | APPROVED | MMESSER |
| LATH/BRICK/ WATER BARRIER | 10/02/2020 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/01/2020 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 09/30/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/14/2020 | APPROVED | FWILLIS |
| Note: Can we please reinspect as early as possible 9-14 due to rain I'm still trying to pour monday thanks | |||
| TIE BEAM / LINTEL | 09/11/2020 | Disapproved -FEE REQUIRED | JBODEN |
| Note: missing dowels at rear door and two rear windows | |||
| MONOLITHIC SLAB | 09/03/2020 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4 | |||
| MONOLITHIC SLAB | 09/02/2020 | Disapproved - NO FEE | FWILLIS |
| Note: CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4 | |||
| GRAVITY SEWER TEST | 08/28/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/28/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 08/26/2020 | CANCELLED BY APPLICANT | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/26/2020 | CANCELLED BY APPLICANT | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/11/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 12/08/2020 | 12/08/2020 |
| Note: Released By: TDOAK | |||
| BLD | CANCEL | 12/08/2020 | 12/15/2020 |
| ENGIN1 | COMPLETE | 09/29/2020 | 09/30/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 09/29/2020 | 09/29/2020 |
| Note: Released By: TDOAK | |||
| ZON | COMPLETE | 07/29/2020 | 07/30/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 07/29/2020 | 07/31/2020 |
| Note: Released By: PBUCKLEY | |||
| ENGIN1 | COMPLETE | 07/29/2020 | 07/30/2020 |
| Note: Released By: TBAKER | |||
| UTL | COMPLETE | 07/29/2020 | 07/31/2020 |
| Note: Released By: LFITZGERALD | |||
| SW1 | COMPLETE | 07/29/2020 | 07/31/2020 |
| Note: Released By: CTROHA | |||
| SWALE | COMPLETE | 07/23/2020 | 07/31/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 07/22/2020 | 07/27/2020 |
| Note: Held By: JPI 1. Color and material sheet illustrates Hardie Plank siding as exterior finish. Plans illustrate stucco. Please clarify finishes. Also identify finish on wood entry walls. All exterior finishes/details should be illustrated on elevations. 2. Page 1.0 calls out for a footing detail at front entry, FM30 on page 1.0. Cannot locate detail on page. Please clarify/correct and provide detail. 3. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided. | |||
| CUSVC | COMPLETE | 07/22/2020 | 07/23/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/22/2020 | 07/23/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 07/22/2020 | 07/23/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/22/2020 | 07/24/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 07/22/2020 | 07/23/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 07/22/2020 | 07/27/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 07/22/2020 | 07/23/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 07/22/2020 | 07/27/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 07/22/2020 | 07/23/2020 |
| Note: Held By: AMOBLEY Please show setback from AC pad to property line on site plan Another form of articulation required. Banding missing around garage door See code below... A. Massing requirement.Building massing shall be implemented by use of techniques that reduce the appearanceof high building density or bulk. At least one massing treatment, in addition to thearticulation requirement, shall be included for each 50 linear feet of wall that exceeds50 feet in length. B. Articulation.Facade articulation is required to add interest to a building. The following featuresshall be acceptable techniques of exterior articulation: 1. A base course or plinth course; banding, moldings, or stringcourses; quoins; oriels;cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as partof the exterior wall construction. 2. Quoins and banding shall wrap around the corners of the structure for at least twofeet. 3. Banding placed around the windows and doors visible from the right-of-way, golf course,canals, lakes, or other similar highly visible areas. Window shutters may substitutefor banding. 4. Horizontal banding continuing the length of the wall that faces a street, golf course,saltwater canal, or other similar highly visible areas. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/22/2020 |
| REINSPECTION FEE | ¤40.00 | 12/22/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 08/05/2020 |
| SITE PLAN 20 | ¤20.00 | 08/05/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/05/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/05/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/05/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 08/05/2020 |
| SEWER CREDIT | (¤234.24) | 08/05/2020 |
| SEWER INSPECTION | ¤25.00 | 08/05/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 08/05/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 08/05/2020 |
| METER - DEPOSIT | ¤60.00 | 08/05/2020 |
| WATER- TURN ON | ¤25.00 | 08/05/2020 |
| ADMIN FEE | ¤20.00 | 08/05/2020 |
| CONNECTION FEES | ¤1,002.88 | 08/05/2020 |
| BUILDING DISCOUNT 100% | (¤1,229.00) | 08/05/2020 |
| ELECTRIC FEE | ¤207.00 | 08/05/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 08/05/2020 |
| IMPACT FEE FIRE | ¤223.38 | 08/05/2020 |
| IMPACT FEE PARKS | ¤849.24 | 08/05/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/05/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 08/05/2020 |
| MECHANICAL FEE | ¤207.00 | 08/05/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/05/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/05/2020 |
| PLAN CHECK FEE | ¤98.00 | 08/05/2020 |
| PLUMBING FEE | ¤207.00 | 08/05/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,322.11 |