Permit #2020071118
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00630-0040 |
| CONDITIONED SPACE: 2044 sqft |
| GARAGE: 635 sqft |
| OPENED PORCH (WITH ROOF) : 260 sqft |
| OPENED PORCH (WITH ROOF) : 57 sqft |
| Total Square Footage: 2996 sqft |
| Block: 00630 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 904-268-7730 |
| Location Address: 48 LINDSAY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/06/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MOEUY SOPHAI & PHORN H&W |
|
Address 61 KENYON RD CRANSTON, RI 02910 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/23/2020 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 12/23/2020 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 12/23/2020 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 12/23/2020 | APPROVED - AS NOTED | DHANEY |
| Note: Approved - will have sewer dept finish pep tank installation . | |||
| ROW - STORMWATER FINAL | 12/22/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: CONCRETE NEED TO BE REMOVE FROM THE SWALE OVERPOUR INTO THE SWALE I DID SPEAK TO THE SUPER HE IS GOING TO FIX IT | |||
| ROW - FINAL APRON (AFTER POUR) | 12/22/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION CONCRETE NEED TO BE REMOVE FROM THE SWALE OVERPOUR INTO THE SWALE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/21/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION SUPER ON SITE LEFT SIDE SWALE NEED TO CORRECT THE GRASS GRAAS WAS LAID ON TOP OF THE SURFACE NEED TO MATCHING THE EXISTEN GRASS ON THE SWALE, TO PREVENT WATER STOP RIGHT SIDE BY THE SEPTIC TANK NEED TO PUSH WATER AWAY NOW THE BURN BRING THE WATER TO THE SEPTIC TANK NEED TO SEEDED AND LAID STRAW ALL AROUND THE TWO EMPTY LOT AND BANK IN THE BACK OF THE HOUSE, TO SECURE THE GROUND 12/21/2020= CORRECTION MADE IT | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/21/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION FINAL SURVEY IS NOT RIGHT AT THE INVERTS NUMBERS PLEASE CORRECTED AND SUBMIT A NEW ONE CORECTION MADE IT | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/17/2020 | Disapproved - NO FEE | GBERTOLA |
| Note: FINAL SURVEY IS NOT RIGHT AT THE INVERTS NUMBERS PLEASE CORRECTED AND SUBMIT A NEW ONE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/17/2020 | Disapproved - NO FEE | GBERTOLA |
| Note: SUPER ON SITE LEFT SIDE SWALE NEED TO CORRECT THE GRASS GRAAS WAS LAID ON TOP OF THE SURFACE NEED TO MATCHING THE EXISTEN GRASS ON THE SWALE, TO PREVENT WATER STOP RIGHT SIDE BY THE SEPTIC TANK NEED TO PUSH WATER AWAY NOW THE BURN BRING THE WATER TO THE SEPTIC TANK NEED TO SEEDED AND LAID STRAW ALL AROUND THE TWO EMPTY LOT AND BANK IN THE BACK OF THE HOUSE, TO SECURE THE GROUND | |||
| ROW - FINAL APRON (AFTER POUR) | 12/14/2020 | CANCELLED BY APPLICANT | GBERTOLA |
| U-CROSS CONNECTION | 12/14/2020 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No IRR. No Cross CN. | |||
| ELECTRIC - EARLY POWER | 12/07/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:50 | |||
| ROW- PRE-APRON (PRE-POUR) | 12/01/2020 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| U - SEWER TIE IN | 11/24/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 11/06/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION wrong stucco stop Screed used.need to extend 3" below wood/block | |||
| LATH/BRICK/ WATER BARRIER | 11/05/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: wrong stucco stop Screed used.need to extend 3" below wood/block | |||
| PEP TANK INSTALLATION REQUEST | 11/05/2020 | APPROVED | CSTONE |
| INSULATION | 10/27/2020 | APPROVED | JCOLASANTI |
| ALL ROUGH | 10/21/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need water in test pipe for DWV test | |||
| ROOF VALLEY & METAL | 10/20/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION no drip edge installed | |||
| ROOF VALLEY & METAL | 10/14/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: no drip edge installed | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/30/2020 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 09/28/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/09/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need dowels marked in orange front entrance and rear column | |||
| TIE BEAM / LINTEL | 09/08/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need dowels marked in orange front entrance and rear column | |||
| MONOLITHIC SLAB | 08/31/2020 | APPROVED | JBODEN |
| Note: THIS IS A REINSPECTION missing uprights at back patio and 1 in between garages | |||
| MONOLITHIC SLAB | 08/28/2020 | Disapproved - NO FEE | JBODEN |
| Note: missing uprights at back patio and 1 in between garages | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/26/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/26/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/20/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/19/2020 | 11/30/2020 |
| Note: Released By: FREODICA Revision - added screen enclosure. | |||
| ZON | COMPLETE | 11/19/2020 | 11/19/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 09/25/2020 | 09/28/2020 |
| Note: Released By: TBAKER Foundation Survey | |||
| ZON | COMPLETE | 09/25/2020 | 09/25/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 08/05/2020 | 08/05/2020 |
| Note: Released By: JBODEN | |||
| ZON | COMPLETE | 08/03/2020 | 08/03/2020 |
| Note: Released By: ELENS | |||
| SWALE | COMPLETE | 07/24/2020 | 07/31/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 07/23/2020 | 07/27/2020 |
| Note: Held By: JPI 1. Page 6.0 illustrates detail #2 on WS-S1 at front entry. Detail does not match section cut on page 5.0. Section illustrates a possible knee wall but is unclear. Please clarify construction at front entry and provide a full structural construction section cut. 2. Color and material sheet illustrates Hardie Plank siding as exterior finish. Plans illustrate stucco. Please clarify finishes. All exterior finishes/details should be illustrated on elevations. 3. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided. | |||
| CUSVC | COMPLETE | 07/23/2020 | 07/24/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/23/2020 | 07/24/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 07/23/2020 | 07/24/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/23/2020 | 07/24/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 07/23/2020 | 07/27/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 07/23/2020 | 07/27/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 07/23/2020 | 07/24/2020 |
| Note: Released By: CTROHA Read Stormwater packet | |||
| UTL | COMPLETE | 07/23/2020 | 07/27/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 07/23/2020 | 07/23/2020 |
| Note: Held By: ELENS Doors and windows on front elevation facing the public right of way must be completely banded. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 12/22/2020 |
| REINSPECTION FEE | ¤40.00 | 12/22/2020 |
| REINSPECTION FEE | ¤40.00 | 12/22/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤532.00 | 08/06/2020 |
| SITE PLAN 20 | ¤20.00 | 08/06/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/06/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/06/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/06/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 08/06/2020 |
| SEWER CREDIT | (¤3,103.54) | 08/06/2020 |
| SEWER INSPECTION | ¤25.00 | 08/06/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 08/06/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 08/06/2020 |
| METER - DEPOSIT | ¤60.00 | 08/06/2020 |
| WATER- TURN ON | ¤25.00 | 08/06/2020 |
| ADMIN FEE | ¤20.00 | 08/06/2020 |
| CONNECTION FEES | ¤1,002.88 | 08/06/2020 |
| BUILDING DISCOUNT 100% | (¤1,317.20) | 08/06/2020 |
| ELECTRIC FEE | ¤219.60 | 08/06/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 08/06/2020 |
| IMPACT FEE FIRE | ¤223.38 | 08/06/2020 |
| IMPACT FEE PARKS | ¤849.24 | 08/06/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/06/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 08/06/2020 |
| MECHANICAL FEE | ¤219.60 | 08/06/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/06/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/06/2020 |
| PLAN CHECK FEE | ¤106.40 | 08/06/2020 |
| PLUMBING FEE | ¤219.60 | 08/06/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,492.81 |