I want to search for...

Permit #2020071460

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00240-0220
CONDITIONED SPACE: 1867 sqft
GARAGE: 409 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
Total Square Footage: 2304 sqft
Block: 00240
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 904-268-7730
Location Address: 8 FELWOOD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/12/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES INC OF FLORIDA

Address

5220 SHAD RD STE 202

JACKSONVILLE, FL 32257

Lot: 0220
Contracted Stated Job Value: ¤125,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/22/2021 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 01/22/2021 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 01/21/2021 APPROVED RGROSS
U-CROSS CONNECTION 01/21/2021 APPROVED - AS NOTED DHANEY
Note: Approved No IRR. No Cross CN.
ROW - FINAL APRON (AFTER POUR) 01/21/2021 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 01/20/2021 APPROVED RGROSS
Note: THIS IS A REINSPECTION SWALE DRAINAGE FLOWS FROM LEFT TO RIGHT PROPERTY LINES PER FINAL SURVEY. HOWEVER, FIELD SURVEY CLEARLY SHOWS DRAINAGE FLOWING FROM THE MIDDLE OF THE LEFT SIDE BACKWARDS TO THE CULVERT. DRAINAGE MUST FLOW FROM THE LEFT SIDE CULVERT CONSISTANTLY DOWN HILL TO THE RIGHT PROPERTY LINE. 1/20/21 - Corrections made. APPROVED
ROW FIELD SURVEY /GRADING CERTIFICATION 01/13/2021 Disapproved - NO FEE RGROSS
Note: SWALE DRAINAGE FLOWS FROM LEFT TO RIGHT PROPERTY LINES PER FINAL SURVEY. HOWEVER, FIELD SURVEY CLEARLY SHOWS DRAINAGE FLOWING FROM THE MIDDLE OF THE LEFT SIDE BACKWARDS TO THE CULVERT. DRAINAGE MUST FLOW FROM THE LEFT SIDE CULVERT CONSISTANTLY DOWN HILL TO THE RIGHT PROPERTY LINE.
FINAL SURVEY (OFFICE USE ONLY) 01/13/2021 APPROVED - AS NOTED RGROSS
Note: SEE NOTES ON FIELD SURVEY
ELECTRIC - EARLY POWER 01/04/2021 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION NEED NEUTRAL CONDUCTOR PHASED AT WEATHERHEAD AND IN METER CAN, NEC. 215.12 1/4/20 EMAILED FPL RELEASED POWER 2:20
ELECTRIC - EARLY POWER 12/30/2020 Disapproved - NO FEE RMARTIN
Note: NEED NEUTRAL CONDUCTOR PHASED AT WEATHERHEAD AND IN METER CAN, NEC. 215.12
U - SEWER TIE IN 12/11/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 12/10/2020 APPROVED RGROSS
Note: READY TO POUR
INSULATION 11/19/2020 APPROVED JBODEN
LATH/BRICK/ WATER BARRIER 11/17/2020 APPROVED TSTAUFFACHER
ALL ROUGH 11/16/2020 APPROVED WMILLER
Note: THIS IS A REINSPECTION Electric meter not complete 11-15-2020... Deficiencies noted prior by inspector TS prior , resolved
ALL ROUGH 11/12/2020 Disapproved - NO FEE TSTAUFFACHER
Note: Electric meter not complete
ROOF VALLEY & METAL 10/27/2020 FINAL APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION FBCR T905.1.1 - 2 Underlayment needs to be fastened at 6"o.c. at laps and staggered 12"o.c. in field
ROOF VALLEY & METAL 10/26/2020 Disapproved -FEE REQUIRED JBODEN
Note: FBCR T905.1.1 - 2 Underlayment needs to be fastened at 6"o.c. at laps and staggered 12"o.c. in field
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/19/2020 APPROVED WMILLER
FOUND SURVEY APPROVED (OFFICE) 10/14/2020 APPROVED TBAKER
TIE BEAM / LINTEL 10/08/2020 APPROVED TSTAUFFACHER
MONOLITHIC SLAB 09/25/2020 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Please schedule for afternoon inspection if possible Discussed with super options to prepare slab for next inspection. Add shingles under chair supports, add 2x material to bottom of existing form boards to keep spillage from running to high above grade. NOTE: super called prior to inspection.
MONOLITHIC SLAB 09/24/2020 CANCELLED BY APPLICANT TSTAUFFACHER
Note: Please schedule for afternoon inspection if possible Discussed with super options to prepare slab for next inspection. Add shingles under chair supports, add 2x material to bottom of existing form boards to keep spillage from running to high above grade. NOTE: super called prior to inspection.
MONOLITHIC SLAB 09/23/2020 Disapproved - NO FEE WMILLER
Note: THIS IS A REINSPECTION 9-23-2020... 1. CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.3.3.7.4 (check all), 2. 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… (6TH EDITION) R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH)
MONOLITHIC SLAB 09/21/2020 CANCELLED BY APPLICANT WMILLER
PLUMBING 1ST ROUGH UNDERGROUND 09/17/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 09/17/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 08/27/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/13/2020 10/14/2020
Note: Released By: TBAKER
ZON COMPLETE 10/13/2020 10/13/2020
Note: Released By: ELENS
ZON COMPLETE 08/10/2020 08/10/2020
Note: Released By: ELENS
ZON HOLD 08/07/2020 08/07/2020
Note: Held By: ELENS Plans do not match. Floor plan has the patio on the right rear. Landscape plan and site plan have the patio on the left side.
MECH COMPLETE 08/05/2020 08/06/2020
Note: Released By: CPISCITELLI
ZON HOLD 08/05/2020 08/05/2020
Note: Held By: ELENS Plans still do not match. (Patio and A/C on revised landscape and site plans do not match the floor plan.)
UTL COMPLETE 08/05/2020 08/07/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 08/05/2020 08/05/2020
Note: Released By: TBAKER
ZON HOLD 08/04/2020 08/04/2020
Note: Held By: ELENS Held By: ELENS Site Plan and Landscape Plan do match the Floor Plan. (Garage left vs. garage right)
MECH HOLD 07/31/2020 07/31/2020
Note: Held By: CPISCITELLI Disregard previous complete was done in error. 1. Duct layout needs to be signed by the AC contractor 2. Orientation of Heat Load does not match the site plan. Revise to match the site plan. When resubmitting upload entire heat load and energy calc as one.
SWALE COMPLETE 07/31/2020 08/12/2020
Note: Released By: TBAKER
BLD COMPLETE 07/30/2020 08/04/2020
Note: Released By: JPI
CUSVC COMPLETE 07/30/2020 08/04/2020
Note: Released By: HHAND
ELEC COMPLETE 07/30/2020 07/31/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 07/30/2020 07/31/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/30/2020 08/04/2020
Note: Released By: CSTONE
MECH COMPLETE 07/30/2020 07/31/2020
Note: Released By: JMUNSON
PLUM COMPLETE 07/30/2020 08/04/2020
Note: Released By: JPI
SW1 COMPLETE 07/30/2020 08/04/2020
Note: Released By: RGROSS
UTL COMPLETE 07/30/2020 08/05/2020
Note: Released By: LFITZGERALD
ZON HOLD 07/30/2020 07/31/2020
Note: Held By: ELENS Site Plan and Landscape Plan do match the Floor Plan. (Garage left vs. garage right) Doors (garage and front) must be completely banding facing front/public right of way.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 01/19/2021
NEW RESIDENTIAL INSPECTIONS ¤450.00 08/12/2020
SITE PLAN 20 ¤20.00 08/12/2020
SURCHARGE FS 533.721 ¤2.00 08/12/2020
SURCHARGE - FS 468.631 ¤2.00 08/12/2020
STORM WATER PERMIT FEES ¤80.00 08/12/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 08/12/2020
SEWER INSPECTION ¤25.00 08/12/2020
SEWER CAPITAL FACILITY ¤4,596.07 08/12/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 08/12/2020
METER - DEPOSIT ¤60.00 08/12/2020
WATER- TURN ON ¤25.00 08/12/2020
ADMIN FEE ¤20.00 08/12/2020
CONNECTION FEES ¤1,002.88 08/12/2020
BUILDING DISCOUNT 100% (¤1,145.00) 08/12/2020
ELECTRIC FEE ¤195.00 08/12/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 08/12/2020
IMPACT FEE FIRE ¤223.38 08/12/2020
IMPACT FEE PARKS ¤849.24 08/12/2020
IMPACT FEE SCHOOL ¤3,600.00 08/12/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 08/12/2020
MECHANICAL FEE ¤195.00 08/12/2020
WATER -IRRIGATION INSPECTION ¤25.00 08/12/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/12/2020
PLAN CHECK FEE ¤90.00 08/12/2020
PLUMBING FEE ¤195.00 08/12/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,516.35