Permit #2020071461
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00520-0140 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| SCREEN PORCH (SOLID ROOF) : 200 sqft |
| Total Square Footage: 2675 sqft |
| Block: 00520 |
| Subdivision: - |
| Job Phone: 904-268-7730 |
| Location Address: 27 WHEATFIELD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/10/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES INC |
|
Address 5220 SHAD RD, STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/27/2021 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 01/27/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: pep panel and pep tank pump yet to be installed, and according to Ivan ,since the closing is this Friday he said he should have pep tank and panel complete by sat. I asked John-the bldg super to hold off as posssible so all can be completed | |||
| ROW - STORMWATER FINAL | 01/26/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: CORRECTION MADE | |||
| ROW - FINAL APRON (AFTER POUR) | 01/26/2021 | APPROVED | GBERTOLA |
| Note: CULVER IS GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/26/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION GRASS ON THE LEFT SIDE OF THE SWALE IS PLACE TO HIGH NEED TO REMOVE THE GRASS AND PLACE MATCHING THE EXISTEN GRASS LEVEL, WATER IS NOT GOING TO FLOW DOWN IN THE SWALE, SWALE BY THE EMPTY LOT NEED TO BE FIXED COMPLETELY REPAIR SWALE AND RE-SOD. ALL RUTTS AND BARE 01/26/2021=CORRECTION MADE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/26/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. (A) Citation(s): A.Land Development Code Technical Manual, Section 300.01 (C)(3) 01/26/2021 | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/25/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. (A) Citation(s): A.Land Development Code Technical Manual, Section 300.01 (C)(3) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/25/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: GRASS ON THE LEFT SIDE OF THE SWALE IS PLACE TO HIGH NEED TO REMOVE THE GRASS AND PLACE MATCHING THE EXISTEN GRASS LEVEL, WATER IS NOT GOING TO FLOW DOWN IN THE SWALE, SWALE BY THE EMPTY LOT NEED TO BE FIXED COMPLETELY REPAIR SWALE AND RE-SOD. ALL RUTTS AND BARE | |||
| U - SEWER TIE IN | 01/19/2021 | APPROVED | JGIBSON |
| ROW - DRAINAGE | 01/08/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: YOU NEED TO CLEAN THE SWALE A LOT OF GARBAGE AND CARBOARD BOXES I WILL GOING TO CREATE ANOTHER INSPCTION I WILL BE BACK TO CHECK ON 01/08/2021 CHECK IF EVERYTHING BEING PICK UP 01/08/2021=CORRECTION MADE | |||
| ROW- PRE-APRON (PRE-POUR) | 01/04/2021 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 01/04/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. YOU NEED TO CLEAN THE SWALE A LOT OF GARBAGE AND CARBOARD BOXES I WILL GOING TO CREATE ANOTHER INSPCTION I WILL BE BACK TO CHECK ON 01/08/2021 CHECK IF EVERYTHING BEING PICK UP | |||
| ELECTRIC - EARLY POWER | 12/30/2020 | APPROVED | FWILLIS |
| PEP TANK INSTALLATION REQUEST | 12/21/2020 | APPROVED | CSTONE |
| INSULATION | 11/23/2020 | APPROVED | MMESSER |
| ALL ROUGH | 11/20/2020 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 11/19/2020 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/17/2020 | APPROVED - AS NOTED | WMILLER |
| Note: need to add missing connectors at bearing wall at front entry by all-rough inspection | |||
| ROOF VALLEY & METAL | 11/17/2020 | APPROVED | WMILLER |
| U-CROSS CONNECTION | 11/16/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-residence being sprinkled | |||
| LATH/BRICK/ WATER BARRIER | 11/16/2020 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 11/16/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/22/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 10/15/2020 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Refer to plans in box;;Highlighted in pink: Bearing footing pads do meet the plans-too small Check F-2.5 and F-2.0 for proper sizing and 3"coverage Footings in multiple llocations do meet meet plan specifications of 16" as called out by detail FM 01 and FM 02 No compaction cert in box | |||
| MONOLITHIC SLAB | 10/14/2020 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Refer to plans in box;;Highlighted in pink: Bearing footing pads do meet the plans-too small Check F-2.5 and F-2.0 for proper sizing and 3"coverage Footings in multiple llocations do meet meet plan specifications of 16" as called out by detail FM 01 and FM 02 No compaction cert in box | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/12/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 10/12/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 09/23/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 12/08/2020 | 12/08/2020 |
| Note: Released By: TDOAK | |||
| BLD | COMPLETE | 12/08/2020 | 12/15/2020 |
| Note: Released By: FREODICA Revision : added screen porch. | |||
| ZON | COMPLETE | 11/13/2020 | 11/13/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 11/13/2020 | 11/16/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | COMPLETE | 11/04/2020 | 11/05/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 11/04/2020 | 11/04/2020 |
| Note: Held By: AMOBLEY House does not meet the 25ft front setback | |||
| ENGIN1 | HOLD | 10/28/2020 | 10/29/2020 |
| Note: Held By: TBAKER Please indicate finish slab elevations of hous and garage on foundation survey. | |||
| ZON | COMPLETE | 10/28/2020 | 10/28/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | HOLD | 10/26/2020 | 10/27/2020 |
| Note: Held By: TBAKER Formboard survey is not acceptable for Foundation Survey. | |||
| ZON | COMPLETE | 10/26/2020 | 10/26/2020 |
| Note: Released By: ELENS | |||
| SW1 | COMPLETE | 09/03/2020 | 09/04/2020 |
| Note: Released By: CTROHA | |||
| MECH | COMPLETE | 09/03/2020 | 09/08/2020 |
| Note: Released By: CPISCITELLI | |||
| MECH | HOLD | 08/27/2020 | 08/28/2020 |
| Note: Held By: CPISCITELLI 1.Energy calcs need to have a design location closer to Palm Coast, I.E. St augustine or Daytona Beach 2. Energy Calc can be at worst case, but heatload needs to be site specific. Orientation doesnt match the site plan. Revise Heat Load to match site plan. 3. R403.7.1.2.1 FBC Energy Conservation 2017 6TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated. | |||
| SW1 | HOLD | 08/27/2020 | 08/27/2020 |
| Note: Held By: CTROHA The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. | |||
| ZON | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: AMOBLEY | |||
| SW1 | HOLD | 08/27/2020 | 08/27/2020 |
| Note: Held By: CTROHA same issue | |||
| ENGIN1 | COMPLETE | 08/27/2020 | 08/27/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 08/19/2020 | 08/19/2020 |
| Note: Released By: AMOBLEY | |||
| MECH | HOLD | 08/19/2020 | 08/19/2020 |
| Note: Held By: CPISCITELLI Orientation of Heat load does not match the site plan. Revise to match the site plan. (SECOND REQUEST) | |||
| SW1 | HOLD | 08/19/2020 | 08/20/2020 |
| Note: Held By: CTROHA The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. | |||
| UTL | COMPLETE | 08/19/2020 | 08/25/2020 |
| Note: Released By: LFITZGERALD | |||
| ENGIN1 | COMPLETE | 08/19/2020 | 08/19/2020 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 07/31/2020 | 08/12/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 07/30/2020 | 08/04/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/30/2020 | 08/04/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 07/30/2020 | 07/31/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 07/30/2020 | 07/31/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 07/30/2020 | 08/04/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 07/30/2020 | 07/31/2020 |
| Note: Held By: CPISCITELLI 1. Orientation of Heat load does not match the site plan. Revise to match the site plan. 2. Heat load cooling area does not match the house. revise to match 3. Duct Layout needs to be signed by the AC contractor 4. Choose a design location on Energy calcs closer to palm coast. I.E. St.augustine or Daytona Beach | |||
| PLUM | COMPLETE | 07/30/2020 | 08/04/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 07/30/2020 | 08/04/2020 |
| Note: Held By: CTROHA See Stormwater checklist | |||
| UTL | COMPLETE | 07/30/2020 | 08/05/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 07/30/2020 | 07/31/2020 |
| Note: Held By: AMOBLEY Banding required around doors facing right of way Garage door is missing banding on elevation page |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/27/2021 |
| REVISION | ¤40.00 | 01/19/2021 |
| SITE PLAN 20 | ¤20.00 | 09/10/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/10/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/10/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/10/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 09/10/2020 |
| SEWER CREDIT | (¤1,342.00) | 09/10/2020 |
| SEWER INSPECTION | ¤25.00 | 09/10/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 09/10/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 09/10/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 09/10/2020 |
| METER - DEPOSIT | ¤60.00 | 09/10/2020 |
| WATER- TURN ON | ¤25.00 | 09/10/2020 |
| ADMIN FEE | ¤20.00 | 09/10/2020 |
| CONNECTION FEES | ¤1,002.88 | 09/10/2020 |
| BUILDING DISCOUNT 100% | (¤1,229.00) | 09/10/2020 |
| ELECTRIC FEE | ¤207.00 | 09/10/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/10/2020 |
| IMPACT FEE FIRE | ¤223.38 | 09/10/2020 |
| IMPACT FEE PARKS | ¤849.24 | 09/10/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/10/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 09/10/2020 |
| MECHANICAL FEE | ¤207.00 | 09/10/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/10/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/10/2020 |
| PLAN CHECK FEE | ¤98.00 | 09/10/2020 |
| PLUMBING FEE | ¤207.00 | 09/10/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,214.35 |