Permit #2020071461

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00520-0140
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
SCREEN PORCH (SOLID ROOF) : 200 sqft
Total Square Footage: 2675 sqft
Block: 00520
Subdivision: -
Job Phone: 904-268-7730
Location Address: 27 WHEATFIELD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/10/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES INC

Address

5220 SHAD RD, STE 202

JACKSONVILLE, FL 32257

Lot: 0140
Contracted Stated Job Value: ¤125,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/27/2021 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 01/27/2021 APPROVED - AS NOTED LFITZGERALD
Note: pep panel and pep tank pump yet to be installed, and according to Ivan ,since the closing is this Friday he said he should have pep tank and panel complete by sat. I asked John-the bldg super to hold off as posssible so all can be completed
ROW - STORMWATER FINAL 01/26/2021 APPROVED - AS NOTED GBERTOLA
Note: CORRECTION MADE
ROW - FINAL APRON (AFTER POUR) 01/26/2021 APPROVED GBERTOLA
Note: CULVER IS GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 01/26/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION GRASS ON THE LEFT SIDE OF THE SWALE IS PLACE TO HIGH NEED TO REMOVE THE GRASS AND PLACE MATCHING THE EXISTEN GRASS LEVEL, WATER IS NOT GOING TO FLOW DOWN IN THE SWALE, SWALE BY THE EMPTY LOT NEED TO BE FIXED COMPLETELY REPAIR SWALE AND RE-SOD. ALL RUTTS AND BARE 01/26/2021=CORRECTION MADE
FINAL SURVEY (OFFICE USE ONLY) 01/26/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. (A) Citation(s): A.Land Development Code Technical Manual, Section 300.01 (C)(3) 01/26/2021
FINAL SURVEY (OFFICE USE ONLY) 01/25/2021 Disapproved - NO FEE GBERTOLA
Note: Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. (A) Citation(s): A.Land Development Code Technical Manual, Section 300.01 (C)(3)
ROW FIELD SURVEY /GRADING CERTIFICATION 01/25/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: GRASS ON THE LEFT SIDE OF THE SWALE IS PLACE TO HIGH NEED TO REMOVE THE GRASS AND PLACE MATCHING THE EXISTEN GRASS LEVEL, WATER IS NOT GOING TO FLOW DOWN IN THE SWALE, SWALE BY THE EMPTY LOT NEED TO BE FIXED COMPLETELY REPAIR SWALE AND RE-SOD. ALL RUTTS AND BARE
U - SEWER TIE IN 01/19/2021 APPROVED JGIBSON
ROW - DRAINAGE 01/08/2021 APPROVED - AS NOTED GBERTOLA
Note: YOU NEED TO CLEAN THE SWALE A LOT OF GARBAGE AND CARBOARD BOXES I WILL GOING TO CREATE ANOTHER INSPCTION I WILL BE BACK TO CHECK ON 01/08/2021 CHECK IF EVERYTHING BEING PICK UP 01/08/2021=CORRECTION MADE
ROW- PRE-APRON (PRE-POUR) 01/04/2021 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 01/04/2021 APPROVED - AS NOTED GBERTOLA
Note: READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. YOU NEED TO CLEAN THE SWALE A LOT OF GARBAGE AND CARBOARD BOXES I WILL GOING TO CREATE ANOTHER INSPCTION I WILL BE BACK TO CHECK ON 01/08/2021 CHECK IF EVERYTHING BEING PICK UP
ELECTRIC - EARLY POWER 12/30/2020 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 12/21/2020 APPROVED CSTONE
INSULATION 11/23/2020 APPROVED MMESSER
ALL ROUGH 11/20/2020 APPROVED TSTAUFFACHER
ALL ROUGH 11/19/2020 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/17/2020 APPROVED - AS NOTED WMILLER
Note: need to add missing connectors at bearing wall at front entry by all-rough inspection
ROOF VALLEY & METAL 11/17/2020 APPROVED WMILLER
U-CROSS CONNECTION 11/16/2020 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-residence being sprinkled
LATH/BRICK/ WATER BARRIER 11/16/2020 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 11/16/2020 APPROVED TBAKER
TIE BEAM / LINTEL 10/22/2020 APPROVED FWILLIS
MONOLITHIC SLAB 10/15/2020 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Refer to plans in box;;Highlighted in pink: Bearing footing pads do meet the plans-too small Check F-2.5 and F-2.0 for proper sizing and 3"coverage Footings in multiple llocations do meet meet plan specifications of 16" as called out by detail FM 01 and FM 02 No compaction cert in box
MONOLITHIC SLAB 10/14/2020 Disapproved - NO FEE TSTAUFFACHER
Note: Refer to plans in box;;Highlighted in pink: Bearing footing pads do meet the plans-too small Check F-2.5 and F-2.0 for proper sizing and 3"coverage Footings in multiple llocations do meet meet plan specifications of 16" as called out by detail FM 01 and FM 02 No compaction cert in box
PLUMBING 1ST ROUGH UNDERGROUND 10/12/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 10/12/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 09/23/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 12/08/2020 12/08/2020
Note: Released By: TDOAK
BLD COMPLETE 12/08/2020 12/15/2020
Note: Released By: FREODICA Revision : added screen porch.
ZON COMPLETE 11/13/2020 11/13/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 11/13/2020 11/16/2020
Note: Released By: TBAKER
ENGIN1 COMPLETE 11/04/2020 11/05/2020
Note: Released By: TBAKER
ZON HOLD 11/04/2020 11/04/2020
Note: Held By: AMOBLEY House does not meet the 25ft front setback
ENGIN1 HOLD 10/28/2020 10/29/2020
Note: Held By: TBAKER Please indicate finish slab elevations of hous and garage on foundation survey.
ZON COMPLETE 10/28/2020 10/28/2020
Note: Released By: TDOAK
ENGIN1 HOLD 10/26/2020 10/27/2020
Note: Held By: TBAKER Formboard survey is not acceptable for Foundation Survey.
ZON COMPLETE 10/26/2020 10/26/2020
Note: Released By: ELENS
SW1 COMPLETE 09/03/2020 09/04/2020
Note: Released By: CTROHA
MECH COMPLETE 09/03/2020 09/08/2020
Note: Released By: CPISCITELLI
MECH HOLD 08/27/2020 08/28/2020
Note: Held By: CPISCITELLI 1.Energy calcs need to have a design location closer to Palm Coast, I.E. St augustine or Daytona Beach 2. Energy Calc can be at worst case, but heatload needs to be site specific. Orientation doesnt match the site plan. Revise Heat Load to match site plan. 3. R403.7.1.2.1 FBC Energy Conservation 2017 6TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated.
SW1 HOLD 08/27/2020 08/27/2020
Note: Held By: CTROHA The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation.
ZON COMPLETE 08/27/2020 08/28/2020
Note: Released By: AMOBLEY
SW1 HOLD 08/27/2020 08/27/2020
Note: Held By: CTROHA same issue
ENGIN1 COMPLETE 08/27/2020 08/27/2020
Note: Released By: TBAKER
ZON COMPLETE 08/19/2020 08/19/2020
Note: Released By: AMOBLEY
MECH HOLD 08/19/2020 08/19/2020
Note: Held By: CPISCITELLI Orientation of Heat load does not match the site plan. Revise to match the site plan. (SECOND REQUEST)
SW1 HOLD 08/19/2020 08/20/2020
Note: Held By: CTROHA The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation.
UTL COMPLETE 08/19/2020 08/25/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 08/19/2020 08/19/2020
Note: Released By: TBAKER
SWALE COMPLETE 07/31/2020 08/12/2020
Note: Released By: TBAKER
BLD COMPLETE 07/30/2020 08/04/2020
Note: Released By: JPI
CUSVC COMPLETE 07/30/2020 08/04/2020
Note: Released By: HHAND
ELEC COMPLETE 07/30/2020 07/31/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 07/30/2020 07/31/2020
Note: Released By: TBAKER
LOCATE COMPLETE 07/30/2020 08/04/2020
Note: Released By: CSTONE
MECH HOLD 07/30/2020 07/31/2020
Note: Held By: CPISCITELLI 1. Orientation of Heat load does not match the site plan. Revise to match the site plan. 2. Heat load cooling area does not match the house. revise to match 3. Duct Layout needs to be signed by the AC contractor 4. Choose a design location on Energy calcs closer to palm coast. I.E. St.augustine or Daytona Beach
PLUM COMPLETE 07/30/2020 08/04/2020
Note: Released By: JPI
SW1 HOLD 07/30/2020 08/04/2020
Note: Held By: CTROHA See Stormwater checklist
UTL COMPLETE 07/30/2020 08/05/2020
Note: Released By: LFITZGERALD
ZON HOLD 07/30/2020 07/31/2020
Note: Held By: AMOBLEY Banding required around doors facing right of way Garage door is missing banding on elevation page

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 01/27/2021
REVISION ¤40.00 01/19/2021
SITE PLAN 20 ¤20.00 09/10/2020
SURCHARGE FS 533.721 ¤2.00 09/10/2020
SURCHARGE - FS 468.631 ¤2.00 09/10/2020
STORM WATER PERMIT FEES ¤80.00 09/10/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 09/10/2020
SEWER CREDIT (¤1,342.00) 09/10/2020
SEWER INSPECTION ¤25.00 09/10/2020
SEWER CAPITAL FACILITY ¤4,596.07 09/10/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 09/10/2020
NEW RESIDENTIAL INSPECTIONS ¤490.00 09/10/2020
METER - DEPOSIT ¤60.00 09/10/2020
WATER- TURN ON ¤25.00 09/10/2020
ADMIN FEE ¤20.00 09/10/2020
CONNECTION FEES ¤1,002.88 09/10/2020
BUILDING DISCOUNT 100% (¤1,229.00) 09/10/2020
ELECTRIC FEE ¤207.00 09/10/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/10/2020
IMPACT FEE FIRE ¤223.38 09/10/2020
IMPACT FEE PARKS ¤849.24 09/10/2020
IMPACT FEE SCHOOL ¤3,600.00 09/10/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 09/10/2020
MECHANICAL FEE ¤207.00 09/10/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/10/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/10/2020
PLAN CHECK FEE ¤98.00 09/10/2020
PLUMBING FEE ¤207.00 09/10/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,214.35