I want to search for...

Permit #2020080209

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-01020-0070
CONDITIONED SPACE: 2045 sqft
GARAGE: 704 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
OPENED PORCH (WITH ROOF) : 212 sqft
Total Square Footage: 3021 sqft
Block: 01020
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 386-960-7720
Location Address: 115 BICKFORD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/14/2020
NOC: RECORDED
Applicant name: LAWRENCE FRED SIETSMA
Owner: AVTEC HOMES INC

Address

STE 5

PALM BAY, FL 32907

Address

620 MALABAR ROAD SE

PALM BAY, FL 32907

Lot: 0070
Contracted Stated Job Value: ¤221,900.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AVTEC HOMES INC
Status Location Address State License Number Phone
CANCEL

2405 E GRAVES AVE

ORANGE CITY, FL 32763

CRC041905 (Exp: 08/31/2024) 386-960-7720

Sub Contractors

STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776
BRUCE R BOLTON
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

1982 SR 44

NEW SMYRNA BEACH, FL 32168

SUITE 357

NEW SMYRNA BEACH, FL 32168

CAC1817407 (Exp: 08/31/2022) 386-216-5975 386-402-4191
DOUGLAS EDWARD RICHARDS
Status Location Address State License Number Phone Fax
INACTIVE

108 E INDIANA AVENUE

DELAND, FL 32724

CCC1328824 (Exp: 08/31/2024) 386-736-4226 386-740-0535
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/26/2021 FINAL APPROVED FWILLIS
ROW - FINAL APRON (AFTER POUR) 03/26/2021 APPROVED RGROSS
ROW - STORMWATER FINAL 03/26/2021 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 03/26/2021 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 03/25/2021 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 03/25/2021 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 03/05/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION Culvert ends are full of water clear through the pipe. Material too soft and will need to dry and re-compacted. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 02/22/2021 Disapproved -FEE REQUIRED RGROSS
Note: Culvert ends are full of water clear through the pipe. Material too soft and will need to dry and re-compacted.
ELECTRIC - EARLY POWER 02/05/2021 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION NEED TO SAFE OFF OUTET BEHIND MASTER BED ROOM DOOR EMAILED FPL RELEASED POWER 9:45
ELECTRIC - EARLY POWER 02/04/2021 Disapproved - NO FEE RMARTIN
Note: NEED TO SAFE OFF OUTET BEHIND MASTER BED ROOM DOOR
GRAVITY SEWER TEST 02/03/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 02/03/2021 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 02/03/2021 APPROVED - AS NOTED DHANEY
Note: Approved No IRR. NO Cross CN.
U - SEWER TIE IN 02/03/2021 APPROVED JGIBSON
PEP TANK INSTALLATION REQUEST 01/07/2021 APPROVED CSTONE
INSULATION 12/18/2020 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 12/11/2020 APPROVED FWILLIS
ALL ROUGH 12/09/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/24/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need detail for gable....need to complete nailing of straps throughout, ok to dry in
ROOF VALLEY & METAL 11/23/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/20/2020 Disapproved - NO FEE JCOLASANTI
Note: THIS IS A REINSPECTION need detail for gable....need to complete nailing of straps throughout, ok to dry in
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2020 CANCELLED BY APPLICANT JCOLASANTI
TIE BEAM / LINTEL 10/29/2020 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 10/23/2020 APPROVED TBAKER
MONOLITHIC SLAB 10/19/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION ADDED ON 10/16/2020 8:12:37 AM
MONOLITHIC SLAB 10/16/2020 CANCELLED BY APPLICANT JMONTARULI
PLUMBING 1ST ROUGH UNDERGROUND 10/13/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION missed inspection
PLUMBING 1ST ROUGH UNDERGROUND 10/12/2020 Disapproved - NO FEE JGIBSON
Note: missed inspection
WATER METER INSTALLATION REQUEST 09/02/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/22/2020 10/23/2020
Note: Released By: TBAKER
ZON COMPLETE 10/22/2020 10/22/2020
Note: Released By: TDOAK
MECH COMPLETE 08/13/2020 08/13/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 08/10/2020 08/10/2020
Note: Released By: AMOBLEY
SWALE COMPLETE 08/06/2020 08/24/2020
Note: Released By: TBAKER
BLD COMPLETE 08/05/2020 08/11/2020
Note: Released By: JPI
CUSVC COMPLETE 08/05/2020 08/07/2020
Note: Released By: HHAND
ELEC COMPLETE 08/05/2020 08/06/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/05/2020 08/06/2020
Note: Released By: TBAKER
LOCATE COMPLETE 08/05/2020 08/07/2020
Note: Released By: CSTONE
MECH HOLD 08/05/2020 08/10/2020
Note: Held By: CPISCITELLI 1. Orientation of both energy calcs and heatloads do not match the site plan. Revise to match the site plan. 2. Verify R8 concrete block wall insulation on calcs. No insulation value listed on plans. 3/4 inch foam board is R5 value
PLUM COMPLETE 08/05/2020 08/11/2020
Note: Released By: JPI
SW1 COMPLETE 08/05/2020 08/07/2020
Note: Released By: CTROHA
UTL COMPLETE 08/05/2020 08/10/2020
Note: Released By: LFITZGERALD
ZON HOLD 08/05/2020 08/06/2020
Note: Held By: AMOBLEY Can not find the florida paint exterior color with the name warm gray. Can you please send us a swatch or something showing the color for review?

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
STORMWATER REINSPECTION FEE ¤40.00 03/25/2021
3% TRANS IMPACT FEE CREDIT (¤50.22) 08/14/2020
SEWER CREDIT (¤1,147.00) 08/14/2020
SEWER INSPECTION ¤25.00 08/14/2020
SEWER CAPITAL FACILITY ¤4,596.07 08/14/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 08/14/2020
METER - DEPOSIT ¤60.00 08/14/2020
WATER- TURN ON ¤25.00 08/14/2020
ADMIN FEE ¤20.00 08/14/2020
CONNECTION FEES ¤1,002.88 08/14/2020
BUILDING DISCOUNT 100% (¤1,321.40) 08/14/2020
ELECTRIC FEE ¤220.20 08/14/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 08/14/2020
IMPACT FEE FIRE ¤223.38 08/14/2020
IMPACT FEE PARKS ¤849.24 08/14/2020
IMPACT FEE SCHOOL ¤3,600.00 08/14/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 08/14/2020
MECHANICAL FEE ¤220.20 08/14/2020
WATER -IRRIGATION INSPECTION ¤25.00 08/14/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/14/2020
PLAN CHECK FEE ¤106.80 08/14/2020
PLUMBING FEE ¤220.20 08/14/2020
NEW RESIDENTIAL INSPECTIONS ¤534.00 08/14/2020
SITE PLAN 20 ¤20.00 08/14/2020
SURCHARGE FS 533.721 ¤2.00 08/14/2020
SURCHARGE - FS 468.631 ¤2.00 08/14/2020
STORM WATER PERMIT FEES ¤80.00 08/14/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,369.35