I want to search for...

Permit #2020080423

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00410-0240
CONDITIONED SPACE: 2025 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 191 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
Total Square Footage: 2720 sqft
Block: 00410
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: (386) 246-6123
Location Address: 69 RENSHAW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/13/2020
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES LLC

Address

185 CYPRESS POINT PKWY STE 7

PALM COAST, FL 32164

Lot: 0240
Contracted Stated Job Value: ¤206,000.00
Job Description: SINGLE FAMILY RESIDENTIAL
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/05/2021 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 02/05/2021 FINAL APPROVED MMESSER
U -UTILITY RESIDENTIAL FINAL 02/05/2021 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 02/05/2021 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 02/01/2021 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 02/01/2021 APPROVED KRUTH
Note: CULVER PIPE IS GOOD
U-CROSS CONNECTION 02/01/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
FINAL SURVEY (OFFICE USE ONLY) 01/27/2021 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 01/27/2021 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 01/08/2021 APPROVED - AS NOTED KRUTH
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete
ELECTRIC - EARLY POWER 12/30/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:40
GRAVITY SEWER TEST 12/09/2020 APPROVED JGIBSON
U - SEWER TIE IN 12/09/2020 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 11/16/2020 APPROVED TSTAUFFACHER
INSULATION 11/10/2020 APPROVED MMESSER
PEP TANK INSTALLATION REQUEST 11/06/2020 APPROVED - AS NOTED CSTONE
Note: Dumpster will need to move
ALL ROUGH 11/05/2020 APPROVED MMESSER
ROOF VALLEY & METAL 10/28/2020 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/22/2020 APPROVED MMESSER
TIE BEAM / LINTEL 10/09/2020 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 10/07/2020 APPROVED TBAKER
MONOLITHIC SLAB 09/28/2020 APPROVED TSTAUFFACHER
Note: Please remove sprite can from under plastic near back patio Please relocate port o let from city drainage system and locate on jobsite
PLUMBING 1ST ROUGH UNDERGROUND 09/24/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 08/26/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/06/2020 10/07/2020
Note: Released By: TBAKER
ENGIN1 HOLD 10/05/2020 10/06/2020
Note: Held By: TBAKER Formboard survey is not acceptable. Foundation survey must show dimensions and elevations of slab.
ZON COMPLETE 10/05/2020 10/05/2020
Note: Released By: TDOAK
SWALE COMPLETE 08/11/2020 08/26/2020
Note: Released By: TBAKER
BLD COMPLETE 08/10/2020 08/12/2020
Note: Released By: JPI
CUSVC COMPLETE 08/10/2020 08/12/2020
Note: Released By: HHAND
ELEC COMPLETE 08/10/2020 08/11/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/10/2020 08/11/2020
Note: Released By: TBAKER
LOCATE COMPLETE 08/10/2020 08/12/2020
Note: Released By: CSTONE
MECH COMPLETE 08/10/2020 08/11/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 08/10/2020 08/12/2020
Note: Released By: JPI
SW1 COMPLETE 08/10/2020 08/10/2020
Note: Released By: CTROHA
UTL COMPLETE 08/10/2020 08/13/2020
Note: Released By: LFITZGERALD
ZON COMPLETE 08/10/2020 08/11/2020
Note: Released By: ELENS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 02/05/2021
BUILDING DISCOUNT 100% (¤1,262.60) 08/13/2020
ELECTRIC FEE ¤211.80 08/13/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 08/13/2020
IMPACT FEE FIRE ¤223.38 08/13/2020
IMPACT FEE PARKS ¤849.24 08/13/2020
IMPACT FEE SCHOOL ¤3,600.00 08/13/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 08/13/2020
MECHANICAL FEE ¤211.80 08/13/2020
WATER -IRRIGATION INSPECTION ¤25.00 08/13/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/13/2020
PLAN CHECK FEE ¤101.20 08/13/2020
PLUMBING FEE ¤211.80 08/13/2020
NEW RESIDENTIAL INSPECTIONS ¤506.00 08/13/2020
SITE PLAN 20 ¤20.00 08/13/2020
SURCHARGE FS 533.721 ¤2.00 08/13/2020
SURCHARGE - FS 468.631 ¤2.00 08/13/2020
STORM WATER PERMIT FEES ¤80.00 08/13/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 08/13/2020
SEWER CREDIT (¤1,466.00) 08/13/2020
SEWER INSPECTION ¤25.00 08/13/2020
SEWER CAPITAL FACILITY ¤4,596.07 08/13/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 08/13/2020
METER - DEPOSIT ¤60.00 08/13/2020
WATER- TURN ON ¤25.00 08/13/2020
ADMIN FEE ¤20.00 08/13/2020
CONNECTION FEES ¤1,002.88 08/13/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,050.35