I want to search for...
Permit #2020080724
Permit Details
Status: CANCEL
| Block: 00000 |
| Subdivision: 1146 - OLD KINGS ROAD PROF. PARK |
| Location Address: 21 OLD KINGS RD N |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 01/05/2021 |
| NOC: Unknown |
| Applicant name: MICHAEL EUGENE BAKER |
| Owner: G M DEVELOPMENT OF PALM COAST INC |
|
Address P O BOX 353639 PALM COAST, FL 32135 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤75,000.00 |
| Job Description: UNIT B103-104 - 'LAB CORP' - INTERIOR RENOVATIONS |
| Type: CN |
Contractor
BAKER CONSTRUCTION & MANAGEMENT, LLC
| Status | Location Address | State License Number |
| CANCEL |
545 N E 118TH AVE ROAD SILVER SPRINGS, FL 34488 |
CGC1525066 (Exp: 08/31/2024) |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
MICHAEL WAYNE BRASWELL
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1612 PINE AVE DELAND, FL 32724 |
CFC1427333 (Exp: 08/31/2024) | 386-624-4119 | 386-624-6853 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIREWALL NAILING | 04/19/2021 | APPROVED | JBODEN |
| Note: THIS IS A REINSPECTION screw inspection PARTIAL WALL SCREW INSPECTION. MORE DRY WALL TO BE HUNG. | |||
| FIREWALL NAILING | 03/30/2021 | PARTIALLY APPROVED | FWILLIS |
| Note: screw inspection PARTIAL WALL SCREW INSPECTION. MORE DRY WALL TO BE HUNG. | |||
| FRAMING | 03/24/2021 | APPROVED | JBODEN |
| ELECTRIC 1ST ROUGH | 03/24/2021 | APPROVED | JBODEN |
| PLUMBING 1ST ROUGH | 03/24/2021 | APPROVED | JBODEN |
| PLUMBING 2ND ROUGH | |||
| PLUMBING FINAL | |||
| HVAC ROUGH | |||
| HVAC FINAL | |||
| ELECTRIC 2ND ROUGH | |||
| ELECTRIC FINAL | |||
| ABOVE CEILING | |||
| BUILDING FINAL | |||
| FIRE FINAL | |||
| U - UTILITY COMMERCIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 01/04/2021 | 01/04/2021 |
| Note: Released By: JMUNSON | |||
| ELEC | HOLD | 12/15/2020 | 12/16/2020 |
| Note: Held By: JMUNSON Give Electrical scope of work and submit electrical plan 3rd Request | |||
| PLUM | COMPLETE | 12/15/2020 | 01/04/2021 |
| Note: Released By: PBUCKLEY | |||
| BADMIN | COMPLETE | 10/14/2020 | 11/12/2020 |
| Note: Released By: STHOMAS | |||
| ELEC | HOLD | 10/14/2020 | 10/14/2020 |
| Note: Held By: JMUNSON 1. Give a scope of work for electrical and upload electrcial plan | |||
| MECH | COMPLETE | 10/14/2020 | 10/16/2020 |
| Note: Released By: CPISCITELLI | |||
| FI1 | COMPLETE | 10/14/2020 | 10/22/2020 |
| Note: Released By: WMILLER | |||
| BLD | COMPLETE | 10/14/2020 | 10/28/2020 |
| Note: Released By: FREODICA | |||
| PLUM | HOLD | 10/14/2020 | 10/28/2020 |
| Note: Held By: FREODICA Repeat comment on item 3: 3. Provide piping material specifications for sanitary and domestic water (hot and cold) per FBCP 6th Ed. Sec. 702/605. Additional comment- Plumbing plan shall have verfiable digital signature and seal of an engineer per FS 471.025 and FAC 61G15-23.005. Also, please include hot & cold water riser diagram. FReodica -386-986-4734. | |||
| BADMIN | HOLD | 10/13/2020 | 10/13/2020 |
| Note: Held By: MDEFREITAS YOU NEED TO SUBMIT ALL THE HOLDS NOT JUST PLUMBING | |||
| BLD | HOLD | 08/14/2020 | 08/14/2020 |
| Note: Held By: CPISCITELLI Plans need to be uploaded separately | |||
| DSD | HOLD | 08/14/2020 | 08/14/2020 |
| Note: Held By: STHOMAS | |||
| ELEC | HOLD | 08/14/2020 | 08/14/2020 |
| Note: Held By: CPISCITELLI Plans need to be uploaded separately | |||
| FI1 | HOLD | 08/14/2020 | 08/14/2020 |
| Note: Held By: CPISCITELLI Plans need to be uploaded separately | |||
| MECH | HOLD | 08/14/2020 | 08/14/2020 |
| Note: Held By: CPISCITELLI Plans need to be uploaded separately | |||
| PLUM | HOLD | 08/14/2020 | 08/14/2020 |
| Note: Held By: CPISCITELLI Plans need to be uploaded separately | |||
| UD1 | HOLD | 08/14/2020 | 08/14/2020 |
| Note: Held By: STHOMAS | |||
| BADMIN | HOLD | 08/14/2020 | 08/14/2020 |
| Note: Held By: STHOMAS PLANS NEED TO BE UPLOADED SEPARATELY. NOT SINGLE PDF | |||
| BADMIN | COMPLETE | 08/14/2020 | 08/14/2020 |
| Note: Released By: STHOMAS | |||
| UD1 | COMPLETE | 08/14/2020 | 08/20/2020 |
| Note: Released By: CJOHNSON | |||
| ELEC | HOLD | 08/14/2020 | 08/17/2020 |
| Note: Held By: JMUNSON 1. Give a scope of work for electrical and upload electrcial plan 2. Give a code analysis for the project FBC Exsisiting 2017 ch 5 | |||
| DSD | COMPLETE | 08/14/2020 | 08/17/2020 |
| Note: Released By: JGONZALEZ | |||
| FI1 | HOLD | 08/14/2020 | 08/25/2020 |
| Note: Held By: WMILLER 1. Provide code analysis showing level of alteration per Chapter 5 FBC Existing Building 2017 6Th edition for review 2. Also note you will need an Exit/Emergency light at the second door along the 48' 10" exit travel path. Please show this on the sheet LS1 | |||
| MECH | HOLD | 08/14/2020 | 08/17/2020 |
| Note: Held By: CPISCITELLI 1. Provide code analysis showing level of alteration per Chapter 5 FBC Existing Building 2017 6Th edition 2. Provide Duct drawing showing existing and proposed work. Provide details for Supply, Return, and fresh air per FBC Mechanical 2017 6th edition | |||
| PLUM | HOLD | 08/14/2020 | 08/27/2020 |
| Note: Held By: FREODICA Clarification per FBC 6th Ed. Sec. 107.2.1 1. Sheet Number C: The plan indicates " All existing fixtures to remain AS-IS" but permit application indicates "Remodel of Bathrooms and there are a lot of bathroom details and guidelines for ADA. Please provide plumbing scope of work or plan(s) including riser diagrams if applicable. 2. Shee A1: 1. Identify the existing and new plumbing fixtures as only (1) new sink is identified at Processing Room. 3. Provide piping material specifications for sanitary and domestic water (hot and cold) per FBCP 6th Ed. Sec. 702/605.3 4. Provide drinking fountain and service sink per FBCP 6th Ed. Sec. 403. FReodica -386-986-4734. | |||
| BLD | HOLD | 08/14/2020 | 08/27/2020 |
| Note: Held By: FREODICA 1. Provide Existing floor plan showing the demolition to determine the changes in comparison with the new floor plan inculding the names of rooms and restrooms. Similarly, identify those rooms and restrooms on the new floor plan for clarity per FBC 6th Ed. Sec. 107.2.1. FReodica-386-986-4734 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN COMMERCIAL | ¤60.00 | 01/05/2021 |
| INSPECTION - COMMERCIAL ADD | ¤525.00 | 01/05/2021 |
| BUILDING DISCOUNT 100% | (¤1,000.00) | 01/05/2021 |
| ELECTRIC FEE | ¤105.00 | 01/05/2021 |
| MECHANICAL FEE | ¤105.00 | 01/05/2021 |
| PLAN CHECK FEE | ¤100.00 | 01/05/2021 |
| PLUMBING FEE | ¤105.00 | 01/05/2021 |
| SITE PLAN 20 | ¤20.00 | 01/05/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/05/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/05/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24.00 |