I want to search for...

Permit #2020080918

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00250-0060
CONDITIONED SPACE: 1352 sqft
CONDITIONED SPACE: 1352 sqft
GARAGE: 448 sqft
GARAGE: 448 sqft
OPENED PORCH (WITH ROOF) : 113 sqft
OPENED PORCH (WITH ROOF) : 113 sqft
OPENED PORCH (WITH ROOF) : 34 sqft
OPENED PORCH (WITH ROOF) : 34 sqft
Total Square Footage: 3894 sqft
Block: 00250
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 386-931-5395
Location Address: 2 LYNTON PL
Type: DU - DUPLEX
Issue Date: 09/04/2020
NOC: RECORDED
Applicant name: RYAN JAMES PERRY
Owner: BARARADO, OLIVIO & NYDIA

Address

14 COLLEGE CT

PALM COAST, FL 32137

Lot: 0060
Contracted Stated Job Value: ¤270,000.00
Job Description: DUPLEX
Type: CN

Contractor

WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Sub Contractors

JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
RYAN JAMES PERRY
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/05/2021 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 04/01/2021 FINAL APPROVED DHANEY
ROW - FINAL INSPECTION 03/30/2021 Disapproved -FEE REQUIRED KRUTH
Note: porta john needs to be either on the driveway or removed from site before final so that area where the facility was can be soded
ROW - FINAL INSPECTION 03/30/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION porta john needs to be either on the driveway or removed from site before final so that area where the facility was can be soded corrections made
U-CROSS CONNECTION 03/30/2021 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 03/29/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 03/29/2021 APPROVED KRUTH
ROW - FINAL INSPECTION 03/24/2021 Disapproved - NO FEE RGROSS
Note: Final Survey no completed yet.
ELECTRIC - EARLY POWER 03/11/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:45
GRAVITY SEWER TEST 03/04/2021 APPROVED JGIBSON
U - SEWER TIE IN 03/04/2021 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 01/22/2021 Disapproved - NO FEE RGROSS
Note: CULVERT ON THE RIGHT IS LOWER THAN THE CULVERT ON THE LEFT FOR THIS DUPLEX DRIVEWAY. RIGHT SIDE CULVERT IS THE HIGH POINT. HIGH POINT CULVERTS SHOULD NOT BE SET AT THE LOW END TOLERANCE AND CANNOT BE SET 1 1/2 TENTH LOWER THAN THE NEXT CULVERT DOWNSTREAM.
ROW- PRE-APRON (PRE-POUR) 01/22/2021 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION CULVERT ON THE RIGHT IS LOWER THAN THE CULVERT ON THE LEFT FOR THIS DUPLEX DRIVEWAY. RIGHT SIDE CULVERT IS THE HIGH POINT. HIGH POINT CULVERTS SHOULD NOT BE SET AT THE LOW END TOLERANCE AND CANNOT BE SET 1 1/2 TENTH LOWER THAN THE NEXT CULVERT DOWNSTREAM. 1/22/21 - THIS WAS RESCHEDULED SAME DAY BY INSPECTOR AS A COURTESY SO BUILDER COULD POUR OVER THE WEEKEND. CORRECTIONS MADE THE SAME DAY.
PEP TANK INSTALLATION REQUEST 01/06/2021 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 01/05/2021 APPROVED FWILLIS
INSULATION 01/04/2021 APPROVED FWILLIS
ALL ROUGH 12/28/2020 APPROVED FWILLIS
ROOF VALLEY & METAL 11/25/2020 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/20/2020 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION need to call in firewall inspection as seperate inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/17/2020 CANCELLED BY APPLICANT JCOLASANTI
TIE BEAM / LINTEL 10/15/2020 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 10/13/2020 APPROVED TBAKER
MONOLITHIC SLAB 09/29/2020 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 09/25/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 09/15/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON HOLD 02/26/2021 02/26/2021
Note: Held By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM Please revise color sheet to remove the original colors submittal.
ZON COMPLETE 02/26/2021 03/01/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/09/2020 10/13/2020
Note: Released By: TBAKER
ZON COMPLETE 10/09/2020 10/09/2020
Note: Released By: TDOAK
ZON COMPLETE 08/26/2020 08/27/2020
Note: Released By: ELENS
BLD COMPLETE 08/26/2020 09/01/2020
Note: Released By: JPI
UTL COMPLETE 08/26/2020 08/31/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 08/26/2020 08/27/2020
Note: Released By: TBAKER
SW1 COMPLETE 08/26/2020 08/28/2020
Note: Released By: CTROHA
BLD HOLD 08/19/2020 08/21/2020
Note: Held By: JPI 1. Missing items from PA spec sheet: mullions, Zip system and roof vent. 2. Please size of attic access per FRC 807. 3. Provide UL # for block portion of demising wall. 4. Provide splicing distance and mating details for double top plate of bearing wall. 5. For all attachment of wood framing to masonry, please call out distance from edge of member for first fastener. IE: Fastener start @ 6” from splice and edge of wood member. 6. Product approval sheet calls out for OSB for roof. Plans illustrate Zip System. Clarify. 7. Provide section thru garage to dwelling wall to illustrate compliance with R302.6 Separation, or provide note to that effect. 8. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided.
CUSVC COMPLETE 08/19/2020 08/20/2020
Note: Released By: HHAND
ELEC COMPLETE 08/19/2020 08/20/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/19/2020 08/19/2020
Note: Released By: TBAKER
LOCATE COMPLETE 08/19/2020 08/21/2020
Note: Released By: CSTONE
MECH COMPLETE 08/19/2020 08/20/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 08/19/2020 08/21/2020
Note: Released By: JPI
SW1 COMPLETE 08/19/2020 08/21/2020
Note: Released By: CTROHA
UTL COMPLETE 08/19/2020 08/25/2020
Note: Released By: LFITZGERALD
ZON HOLD 08/19/2020 08/19/2020
Note: Held By: ELENS 8 foundation plantings/shrubs are required within 8 feet of the front facade. The landscape plan legend is cut off. Please upload it so that it is visible. Please complete the color sheet including: Name and LRV of the exterior paint color, the material of the exterior, the number of accent colors, and roof color. The location of the A/C pads on the floor plan do not match the site plan and landscape plan. Banding is required on the windows on the right side facing the public right of way.
SWALE COMPLETE 08/19/2020 09/14/2020
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
STORMWATER REINSPECTION FEE ¤40.00 04/05/2021
3% TRANS IMPACT FEE CREDIT (¤77.94) 09/04/2020
SEWER CREDIT (¤1,700.00) 09/04/2020
SEWER INSPECTION ¤25.00 09/04/2020
SEWER CAPITAL FACILITY ¤9,192.14 09/04/2020
WATER CAPITAL FACILITY FEE ¤6,748.36 09/04/2020
METER - DEPOSIT ¤120.00 09/04/2020
WATER- TURN ON ¤50.00 09/04/2020
ADMIN FEE ¤20.00 09/04/2020
CONNECTION FEES ¤2,005.76 09/04/2020
BUILDING DISCOUNT 100% (¤1,665.80) 09/04/2020
ELECTRIC FEE ¤269.40 09/04/2020
3% FIRE IMPACT FEE CREDIT (¤13.40) 09/04/2020
IMPACT FEE FIRE ¤446.76 09/04/2020
IMPACT FEE PARKS ¤1,698.48 09/04/2020
IMPACT FEE SCHOOL ¤7,200.00 09/04/2020
IMPACT FEE TRANSPORTATION ¤2,598.00 09/04/2020
MECHANICAL FEE ¤269.40 09/04/2020
WATER -IRRIGATION INSPECTION ¤50.00 09/04/2020
3% PARKS IMPACT FEE CREDIT (¤50.95) 09/04/2020
PLAN CHECK FEE ¤139.60 09/04/2020
PLUMBING FEE ¤269.40 09/04/2020
NEW RESIDENTIAL INSPECTIONS ¤698.00 09/04/2020
SITE PLAN 20 ¤20.00 09/04/2020
SURCHARGE FS 533.721 ¤2.00 09/04/2020
SURCHARGE - FS 468.631 ¤2.00 09/04/2020
STORM WATER PERMIT FEES ¤80.00 09/04/2020
Fees Total Due: ¤0.00 Total Paid: ¤28,436.21