I want to search for...

Permit #2020080927

Permit Details

Status: FINAL

Parcel Id: 16-11-30-4939-00000-0030
Block: 00000
Subdivision: 2263 - PALM COAST INDUSTRIAL PARK PHASE III
Job Phone: (386)446-6426
Location Address: 25 RAILSIDE WAY
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 09/03/2020
NOC: Unknown
Applicant name: SCOTT DALE SOWERS
Owner: V3 LLC

Address

25 RAILSIDE WAY

PALM COAST, FL 32137

Lot: 0030
Job Description: SITE WORK - RAILSIDE INDUSTRIAL WAREHOUSE
Type: CN

Contractor

S E CLINE CONSTRUCTION, INC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 354425

PALM COAST, FL 32137

CGC061947 (Exp: 08/31/2028) (386)446-6426 (386)446-6481

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 11/11/2021 APPROVED DRAMIREZ
ROW - FINAL INSPECTION 11/10/2021 FINAL APPROVED DHANEY
CLOSE OUT DOCUMENTS 11/09/2021 APPROVED DRAMIREZ
Note: All Utility checklist items have been meet.
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 11/02/2021 APPROVED DRAMIREZ
Note: As-built approved under application 4918.
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 11/02/2021 APPROVED DRAMIREZ
Note: THIS IS A REINSPECTION
LDSC- LANDSCAPE FINAL 11/02/2021 FINAL APPROVED DHANEY
UC-FINAL SITE INSPECTION 10/29/2021 FINAL APPROVED DHANEY
Note: THIS IS A REINSPECTION
BLD- ADA PARKING 10/28/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION need documents on site for inspection 10-20-21... Need approved documents on site for inspection 10-25-21... 1. ADA Parking space needs to be 12 feet wide 2. ADA accessible parking stencil not meeting required size per approved documents 3. ADA accessible parking stencil needs to be blue per approved documents 10/28/21 - All items corrected.
BLD- ADA PARKING 10/25/2021 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need documents on site for inspection 10-20-21... Need approved documents on site for inspection 10-25-21... 1. ADA Parking space needs to be 12 feet wide 2. ADA accessible parking stencil not meeting required size per approved documents 3. ADA accessible parking stencil needs to be blue per approved documents
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 10/25/2021 APPROVED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need documents on site for inspection 10-20-21... Need approved documents on site for inspection 10-25-21... notes above resolved
BLD - SITE STRUCTURE - TRASH DUMPSTER 10/25/2021 APPROVED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need documents on site for inspection 10-20-21... Need approved documents on site for inspection 10-25-21... notes above resolved
BLD - SITE STRUCTURE - TRASH DUMPSTER 10/20/2021 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION need documents on site for inspection 10-20-21... Need approved documents on site for inspection
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 10/20/2021 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION need documents on site for inspection 10-20-21... Need approved documents on site for inspection
BLD- ADA PARKING 10/20/2021 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION need documents on site for inspection 10-20-21... Need approved documents on site for inspection
BLD - SITE STRUCTURE - TRASH DUMPSTER 10/14/2021 Disapproved -FEE REQUIRED LMILLER
Note: need documents on site for inspection
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 10/14/2021 Disapproved - NO FEE LMILLER
Note: need documents on site for inspection
BLD- ADA PARKING 10/14/2021 Disapproved - NO FEE LMILLER
Note: need documents on site for inspection
LDSC-IRRIGATION FINAL 10/14/2021 APPROVED DHANEY
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 10/14/2021 CANCELLED BY APPLICANT DHANEY
UC- PRELIMINARY AS-BUILTS 10/14/2021 APPROVED DHANEY
UC-FINAL SITE INSPECTION 10/14/2021 CANCELLED BY APPLICANT DHANEY
UROW - FINAL DRAINAGE 10/14/2021 APPROVED DHANEY
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 10/12/2021 APPROVED DHANEY
Note: THIS IS A REINSPECTION
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 10/12/2021 APPROVED DHANEY
UROW-RETENT/DETENT STABILI 10/12/2021 APPROVED DHANEY
UROW -FINAL GRADE PRIOR SOD 10/12/2021 APPROVED DHANEY
UROW- CURBING & GUTTER 10/12/2021 APPROVED DHANEY
U-WATER METER INSTALLATION/VERIFICATION 10/12/2021 APPROVED DHANEY
UC-SUBSTANTIAL WALK-THRU 10/12/2021 APPROVED DHANEY
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 10/12/2021 APPROVED DHANEY
Note: THIS IS A REINSPECTION
U-WATER SERVICE INSTALLATION 10/12/2021 APPROVED DHANEY
UC-CONSTRUCTION ENTRANCE 10/12/2021 APPROVED DHANEY
LDSC-TREE BARRICADE 10/12/2021 APPROVED DHANEY
LDSC-PRE-PLANTING TREE QUALITY 10/12/2021 APPROVED DHANEY
UC-ASPHALT PRE PLACEMENT 06/03/2021 APPROVED DHANEY
U - SEWER TIE IN 04/29/2021 APPROVED - AS NOTED JGIBSON
Note: NOTHING WARRANT AN INSPECTION FROM WHAT I COULD SEE
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/19/2021 CANCELLED BY APPLICANT DHANEY
UC-DRAINAGE STRUCT PLACMNT 03/15/2021 FINAL APPROVED DHANEY
UC-DRAINAGE PIPE PLACEMENT/LAMPING 03/15/2021 APPROVED DHANEY
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 09/29/2020 PARTIALLY APPROVED MBACON
ROW -TURBIDITY BARRER 09/29/2020 APPROVED MBACON
Note: N/A
PLAN - PRE-CON 386-986-3750 09/17/2020 APPROVED DRAMIREZ

Review History

Department Status Date In Date Out
BLD COMPLETE 08/19/2020 08/20/2020
Note: Released By: PBUCKLEY
ELEC CANCEL 08/19/2020 08/20/2020
Note: Not needed
ENGIN1 COMPLETE 08/19/2020 08/19/2020
Note: Released By: DLEAP
PLLA COMPLETE 08/19/2020 08/19/2020
Note: Released By: BDAWSON
UD1 COMPLETE 08/19/2020 08/20/2020
Note: Released By: CJOHNSON

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION - COMMERCIAL ¤60.00 10/22/2021
REINSPECTION - COMMERCIAL ¤60.00 10/18/2021
BUILDING DISCOUNT 100% (¤125.00) 09/03/2020
INSPECTION 40 ¤1,160.00 09/03/2020
PERMIT FEE ¤125.00 09/03/2020
SITE PLAN 20 ¤20.00 09/03/2020
Fees Total Due: ¤0.00 Total Paid: ¤1,300.00