I want to search for...
Permit #2020080948
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00090-0240 |
| CONDITIONED SPACE: 3130 sqft |
| GARAGE: 560 sqft |
| OPENED PORCH (WITH ROOF) : 400 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 4126 sqft |
| Block: 00090 |
| Subdivision: - |
| Job Phone: 904-268-7730 |
| Location Address: 5 WHITING WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/09/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES LLC |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL 32257 |
|
Address #202 JACKSONVILLE, FL 32257 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤135,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/22/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 02/22/2021 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 02/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| ROW - FINAL APRON (AFTER POUR) | 02/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: FOR THE AFTER POUR NEED TO REMOVE THE SEND FROM THE CULVERT PIPES 02/19/2021=CORRECTION WERE MADE COLVERT PIPE IS GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/18/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: FOR THE AFTER POUR NEED TO REMOVE THE SEND FROM THE CULVERT PIPES | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/18/2021 | APPROVED | GBERTOLA |
| TUB SET | 02/11/2021 | APPROVED | JGIBSON |
| U-CROSS CONNECTION | 02/11/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed | |||
| ELECTRIC - EARLY POWER | 02/01/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Neutral wire needs to be phased in the meter can and coming out of the weather head. NEC 2014 200.7 EMAILED FPL RELEASED POWER 9:50 2/1/21 | |||
| ELECTRIC - EARLY POWER | 01/29/2021 | Disapproved - NO FEE | JMUNSON |
| Note: Neutral wire needs to be phased in the meter can and coming out of the weather head. NEC 2014 200.7 | |||
| U - SEWER TIE IN | 01/28/2021 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 01/21/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NOT FORMED AT TIME OF INSPECTION. CULVERT PIPE IS OUT OF TOLERANCE LEFT SIDE I WOULD ADD A FORM TO THE BOTTOM OF THE END OF THE MITERS SO CONCRETE DOES NOT GET POURED INTO THE SWALE. 01/21/2021=CORRECTION MADE READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/20/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION NOT FORMED AT TIME OF INSPECTION. CULVERT PIPE IS OUT OF TOLERANCE LEFT SIDE I WOULD ADD A FORM TO THE BOTTOM OF THE END OF THE MITERS SO CONCRETE DOES NOT GET POURED INTO THE SWALE. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/19/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: NOT FORMED AT TIME OF INSPECTION. | |||
| LATH/BRICK/ WATER BARRIER | 12/28/2020 | APPROVED | MMESSER |
| INSULATION | 12/23/2020 | APPROVED | TSTAUFFACHER |
| PEP TANK INSTALLATION REQUEST | 12/18/2020 | APPROVED | CSTONE |
| INSULATION | 12/14/2020 | Disapproved -FEE REQUIRED | JBODEN |
| Note: Exterior doors need to be installed Seal fire blocking at AHU | |||
| ALL ROUGH | 12/10/2020 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Bori care treatment not done | |||
| ALL ROUGH | 12/09/2020 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Bori care treatment not done | |||
| ROOF VALLEY & METAL | 12/08/2020 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/19/2020 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 10/26/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/21/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 10/08/2020 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/02/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 10/02/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 09/28/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 10/23/2020 | 10/23/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 10/23/2020 | 10/26/2020 |
| Note: Released By: TBAKER | |||
| CUSVC | COMPLETE | 09/01/2020 | 09/02/2020 |
| Note: Released By: HHAND | |||
| CUSVC | HOLD | 08/28/2020 | 08/28/2020 |
| Note: Held By: HHAND Please update utility application to reflect new physical address. | |||
| MECH | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: CPISCITELLI | |||
| ZON | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 08/27/2020 | 08/27/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 08/27/2020 | 08/27/2020 |
| Note: Released By: CTROHA Use adjusted elevations | |||
| SWALE | COMPLETE | 08/21/2020 | 09/09/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 08/21/2020 | 08/21/2020 |
| Note: Held By: ELENS House does not meet the street side yard setback of 15 feet. | |||
| BLD | COMPLETE | 08/19/2020 | 08/25/2020 |
| Note: Released By: JPI | |||
| CUSVC | HOLD | 08/19/2020 | 08/20/2020 |
| Note: Held By: HHAND Please correct utility application. Both reclaim and N/A are checked off. This address is not eligible for reclaim. | |||
| ELEC | COMPLETE | 08/19/2020 | 08/20/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 08/19/2020 | 08/21/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 08/19/2020 | 08/24/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 08/19/2020 | 08/20/2020 |
| Note: Held By: CPISCITELLI Orientation of heatload does not match the site plan. Revise to match the site plan | |||
| PLUM | COMPLETE | 08/19/2020 | 08/25/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 08/19/2020 | 08/21/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 08/19/2020 | 08/25/2020 |
| Note: Released By: LFITZGERALD |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 02/24/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 02/24/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 09/09/2020 |
| SEWER CREDIT | (¤1,147.00) | 09/09/2020 |
| SEWER INSPECTION | ¤25.00 | 09/09/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 09/09/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 09/09/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤776.00 | 09/09/2020 |
| SITE PLAN 20 | ¤20.00 | 09/09/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/09/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/09/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/09/2020 |
| METER - DEPOSIT | ¤60.00 | 09/09/2020 |
| WATER- TURN ON | ¤25.00 | 09/09/2020 |
| ADMIN FEE | ¤20.00 | 09/09/2020 |
| CONNECTION FEES | ¤1,002.88 | 09/09/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 09/09/2020 |
| BUILDING DISCOUNT 100% | (¤1,829.60) | 09/09/2020 |
| ELECTRIC FEE | ¤292.80 | 09/09/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/09/2020 |
| IMPACT FEE FIRE | ¤223.38 | 09/09/2020 |
| IMPACT FEE PARKS | ¤849.24 | 09/09/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/09/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 09/09/2020 |
| MECHANICAL FEE | ¤292.80 | 09/09/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/09/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/09/2020 |
| PLAN CHECK FEE | ¤155.20 | 09/09/2020 |
| PLUMBING FEE | ¤292.80 | 09/09/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,449.35 |