Permit #2020080948

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00090-0240
CONDITIONED SPACE: 3130 sqft
GARAGE: 560 sqft
OPENED PORCH (WITH ROOF) : 400 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 4126 sqft
Block: 00090
Subdivision: -
Job Phone: 904-268-7730
Location Address: 5 WHITING WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/09/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES LLC

Address

5220 SHAD ROAD

JACKSONVILLE, FL 32257

Address

#202

JACKSONVILLE, FL 32257

Lot: 0240
Contracted Stated Job Value: ¤135,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/22/2021 FINAL APPROVED TSTAUFFACHER
U -UTILITY RESIDENTIAL FINAL 02/22/2021 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 02/19/2021 APPROVED - AS NOTED GBERTOLA
ROW - FINAL APRON (AFTER POUR) 02/19/2021 APPROVED - AS NOTED GBERTOLA
Note: FOR THE AFTER POUR NEED TO REMOVE THE SEND FROM THE CULVERT PIPES 02/19/2021=CORRECTION WERE MADE COLVERT PIPE IS GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 02/18/2021 APPROVED - AS NOTED GBERTOLA
Note: FOR THE AFTER POUR NEED TO REMOVE THE SEND FROM THE CULVERT PIPES
FINAL SURVEY (OFFICE USE ONLY) 02/18/2021 APPROVED GBERTOLA
TUB SET 02/11/2021 APPROVED JGIBSON
U-CROSS CONNECTION 02/11/2021 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with PVB installed
ELECTRIC - EARLY POWER 02/01/2021 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION Neutral wire needs to be phased in the meter can and coming out of the weather head. NEC 2014 200.7 EMAILED FPL RELEASED POWER 9:50 2/1/21
ELECTRIC - EARLY POWER 01/29/2021 Disapproved - NO FEE JMUNSON
Note: Neutral wire needs to be phased in the meter can and coming out of the weather head. NEC 2014 200.7
U - SEWER TIE IN 01/28/2021 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 01/21/2021 APPROVED - AS NOTED GBERTOLA
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NOT FORMED AT TIME OF INSPECTION. CULVERT PIPE IS OUT OF TOLERANCE LEFT SIDE I WOULD ADD A FORM TO THE BOTTOM OF THE END OF THE MITERS SO CONCRETE DOES NOT GET POURED INTO THE SWALE. 01/21/2021=CORRECTION MADE READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 01/20/2021 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION NOT FORMED AT TIME OF INSPECTION. CULVERT PIPE IS OUT OF TOLERANCE LEFT SIDE I WOULD ADD A FORM TO THE BOTTOM OF THE END OF THE MITERS SO CONCRETE DOES NOT GET POURED INTO THE SWALE.
ROW- PRE-APRON (PRE-POUR) 01/19/2021 Disapproved - NO FEE GBERTOLA
Note: NOT FORMED AT TIME OF INSPECTION.
LATH/BRICK/ WATER BARRIER 12/28/2020 APPROVED MMESSER
INSULATION 12/23/2020 APPROVED TSTAUFFACHER
PEP TANK INSTALLATION REQUEST 12/18/2020 APPROVED CSTONE
INSULATION 12/14/2020 Disapproved -FEE REQUIRED JBODEN
Note: Exterior doors need to be installed Seal fire blocking at AHU
ALL ROUGH 12/10/2020 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Bori care treatment not done
ALL ROUGH 12/09/2020 Disapproved - NO FEE TSTAUFFACHER
Note: Bori care treatment not done
ROOF VALLEY & METAL 12/08/2020 APPROVED WMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2020 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 10/26/2020 APPROVED TBAKER
TIE BEAM / LINTEL 10/21/2020 APPROVED FWILLIS
MONOLITHIC SLAB 10/08/2020 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 10/02/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 10/02/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 09/28/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 10/23/2020 10/23/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 10/23/2020 10/26/2020
Note: Released By: TBAKER
CUSVC COMPLETE 09/01/2020 09/02/2020
Note: Released By: HHAND
CUSVC HOLD 08/28/2020 08/28/2020
Note: Held By: HHAND Please update utility application to reflect new physical address.
MECH COMPLETE 08/27/2020 08/28/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 08/27/2020 08/28/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 08/27/2020 08/27/2020
Note: Released By: TBAKER
SW1 COMPLETE 08/27/2020 08/27/2020
Note: Released By: CTROHA Use adjusted elevations
SWALE COMPLETE 08/21/2020 09/09/2020
Note: Released By: TBAKER
ZON HOLD 08/21/2020 08/21/2020
Note: Held By: ELENS House does not meet the street side yard setback of 15 feet.
BLD COMPLETE 08/19/2020 08/25/2020
Note: Released By: JPI
CUSVC HOLD 08/19/2020 08/20/2020
Note: Held By: HHAND Please correct utility application. Both reclaim and N/A are checked off. This address is not eligible for reclaim.
ELEC COMPLETE 08/19/2020 08/20/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/19/2020 08/21/2020
Note: Released By: TBAKER
LOCATE COMPLETE 08/19/2020 08/24/2020
Note: Released By: CSTONE
MECH HOLD 08/19/2020 08/20/2020
Note: Held By: CPISCITELLI Orientation of heatload does not match the site plan. Revise to match the site plan
PLUM COMPLETE 08/19/2020 08/25/2020
Note: Released By: JPI
SW1 COMPLETE 08/19/2020 08/21/2020
Note: Released By: CTROHA
UTL COMPLETE 08/19/2020 08/25/2020
Note: Released By: LFITZGERALD

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/24/2021
STORMWATER REINSPECTION FEE ¤40.00 02/24/2021
3% TRANS IMPACT FEE CREDIT (¤50.22) 09/09/2020
SEWER CREDIT (¤1,147.00) 09/09/2020
SEWER INSPECTION ¤25.00 09/09/2020
SEWER CAPITAL FACILITY ¤4,596.07 09/09/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 09/09/2020
NEW RESIDENTIAL INSPECTIONS ¤776.00 09/09/2020
SITE PLAN 20 ¤20.00 09/09/2020
SURCHARGE FS 533.721 ¤2.00 09/09/2020
SURCHARGE - FS 468.631 ¤2.00 09/09/2020
STORM WATER PERMIT FEES ¤80.00 09/09/2020
METER - DEPOSIT ¤60.00 09/09/2020
WATER- TURN ON ¤25.00 09/09/2020
ADMIN FEE ¤20.00 09/09/2020
CONNECTION FEES ¤1,002.88 09/09/2020
CONTRACTOR CHANGE ¤40.00 09/09/2020
BUILDING DISCOUNT 100% (¤1,829.60) 09/09/2020
ELECTRIC FEE ¤292.80 09/09/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/09/2020
IMPACT FEE FIRE ¤223.38 09/09/2020
IMPACT FEE PARKS ¤849.24 09/09/2020
IMPACT FEE SCHOOL ¤3,600.00 09/09/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 09/09/2020
MECHANICAL FEE ¤292.80 09/09/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/09/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/09/2020
PLAN CHECK FEE ¤155.20 09/09/2020
PLUMBING FEE ¤292.80 09/09/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,449.35