Permit #2020081083

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00110-0020
CONDITIONED SPACE: 1761 sqft
GARAGE: 473 sqft
OPENED PORCH (WITH ROOF) : 205 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2549 sqft
Block: 00110
Subdivision: -
Job Phone: 386-237-1210
Location Address: 22 ZONAL GERANIUM TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/19/2020
NOC: RECORDED
Applicant name: ANDRIY POPOV
Owner: ZAVYALOV NIKOLAY & LYUDMILA H&W

Address

8 ZONAL CT

PALM COAST, FL 32164

Lot: 0020
Contracted Stated Job Value: ¤180,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SILVER BREEZE HOMES
Status Location Address Mailing Address State License Number Phone
CANCEL

1 SEATHORN PATH

PALM COAST, FL 32164

PALM COAST, FL 32164

RR282812121 (Exp: 08/31/2023) 386-237-1210

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/05/2021 FINAL APPROVED TSTAUFFACHER
U -UTILITY RESIDENTIAL FINAL 08/05/2021 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 08/04/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - STORMWATER FINAL 08/04/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 08/04/2021 APPROVED GBERTOLA
Note: culvert pipe elevation is good
FINAL SURVEY (OFFICE USE ONLY) 08/04/2021 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 06/28/2021 APPROVED RGROSS
Note: New inspection due to canceled inspection YOU SPOKE TO SCOTT SURVEYOR CAME IN FIX BENCHMARK ISSUES 6/28/21 - READY TO POUR
U-CROSS CONNECTION 06/21/2021 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 06/21/2021 CANCELLED BY APPLICANT WEB
Note: YOU SPOKE TO SCOTT SURVEYOR CAME IN FIX BENCHMARK ISSUES
U - SEWER TIE IN 05/19/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 05/19/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 05/19/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:43 am
ELECTRIC - EARLY POWER 05/17/2021 Disapproved -FEE REQUIRED JMUNSON
Note: Hiouse needs to unlocked for inspection
LATH/BRICK/ WATER BARRIER 04/21/2021 APPROVED TSTAUFFACHER
PEP TANK INSTALLATION REQUEST 04/19/2021 APPROVED CSTONE
INSULATION 04/09/2021 APPROVED TSTAUFFACHER
Note: SUPER NOTE: AC service wire has been pulled to the master bath ceiling below the drywall line
ALL ROUGH 04/05/2021 APPROVED TSTAUFFACHER
ROOF VALLEY & METAL 03/05/2021 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/16/2021 APPROVED TSTAUFFACHER
TIE BEAM / LINTEL 01/08/2021 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 01/07/2021 APPROVED TBAKER
WATER METER INSTALLATION REQUEST 01/05/2021 APPROVED TCHURCHILL
MONOLITHIC SLAB 12/09/2020 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 12/01/2020 APPROVED JGIBSON

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/06/2021 01/07/2021
Note: Released By: TBAKER
ZON COMPLETE 01/06/2021 01/06/2021
Note: Released By: AMOBLEY
BLD COMPLETE 10/06/2020 10/07/2020
Note: Released By: JBODEN
MECH COMPLETE 10/01/2020 10/01/2020
Note: Released By: CPISCITELLI
BLD HOLD 10/01/2020 10/06/2020
Note: Held By: JPI 1. Building section #3 on page A-2 and as detailed on page A-5 does not match truss layout. Please clarify and correct. 2. Provide design loads per R301, dead and live for roof and floors as applicable. 3. Provide construction details for built up frame beam at front entry.
PLUM COMPLETE 10/01/2020 10/06/2020
Note: Released By: JPI
ELEC COMPLETE 10/01/2020 10/02/2020
Note: Released By: JMUNSON
ZON COMPLETE 09/18/2020 09/22/2020
Note: Released By: ELENS
MECH HOLD 09/18/2020 09/18/2020
Note: Held By: CPISCITELLI 1. Orientation of Energy calcs does not match the site plan. Revise to match the site plan.(Second Request) 2. When New is submitted . Energy calcs and EPL card need to be signed by the builder. 3. Provide duct drawing signed by the AC contractor w/ license number 4. Upload all documents as one file. Emergy calcs, heatload and duct drawing
BLD HOLD 09/18/2020 09/21/2020
Note: Held By: JPI 1. The submission form did not check off building trade. Please make complete submittals, including resubmittals.
PLUM HOLD 09/18/2020 09/21/2020
Note: Held By: JPI 1. The submittal form did not check off building trade. Please make complete submittal, including for resubmittals.
UTL COMPLETE 09/18/2020 09/23/2020
Note: Released By: LFITZGERALD
SW1 COMPLETE 09/18/2020 09/18/2020
Note: Released By: CTROHA
SWALE COMPLETE 08/25/2020 09/22/2020
Note: Released By: TBAKER
BLD HOLD 08/24/2020 08/29/2020
Note: Held By: JPI 1. Plan submission is incomplete and erroneous. Multiple duplicate documents submitted without explanation as to changes between pages. Only three pages have been signed and sealed. Multiple page submission listed as “Plans4 UPDATED” are unsealed. Please provide one complete signed and sealed set of plans. 2. Provide a complete Product Approval spec sheet. Missing items are as follows: mullions, underlayment, roof vents, wood connectors, wood anchors, lintels, and soffit. 3. Plans do not illustrate interior bearing walls per wall legend. Please correct. 4. Provide design loads per R301. 5. Provide full construction details of front entry feature including conventionally framed roofing. 6. Provide attic access size per R807. 7. Provide mixed construction details with attachments illustrated. 8. Provide splicing dimension and mating details for double top plate of bearing wall. 9. Wall sheathing nailing table is rated at 120 mph. Structure is designed to 140 mph. Please clarify and/or correct. 10. Provide typical interior wall construction detail. 11. Provide wood beam mating details. 12. Provide construction details for built up frame beam at front entry. 13. Additional comments may be generated once sealed plans are submitted. 14. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided.
CUSVC COMPLETE 08/24/2020 08/25/2020
Note: Released By: HHAND
ELEC COMPLETE 08/24/2020 08/25/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/24/2020 08/25/2020
Note: Released By: TBAKER
LOCATE COMPLETE 08/24/2020 08/26/2020
Note: Released By: CSTONE
MECH HOLD 08/24/2020 08/25/2020
Note: Held By: CPISCITELLI 1. Orientation of Energy calcs does not match the site plan. Revise to match the site plan. 2. Submit Heatload calculation showing equipment information. 3. Energy calcs and EPL card need to be signed by the builder. 4. Provide duct drawing signed by the AC contractor
PLUM HOLD 08/24/2020 08/29/2020
Note: Held By: JPI 1. Isometric does not illustrate venting for kitchen sink. 2. Isometric indicates a secondary sink after kitchen sink. Please clarify. 3. Provide a signed and sealed plan.
SW1 COMPLETE 08/24/2020 08/25/2020
Note: Released By: CTROHA
UTL COMPLETE 08/24/2020 08/27/2020
Note: Released By: LFITZGERALD
ZON HOLD 08/24/2020 08/25/2020
Note: Held By: ELENS Site Plan (and survey) are missing: * Legal Description * FEMA Flood Zone and Map Panel number * Total lot area (square footage) * Width of driveway at the garage door (Uploaded document says "Sheet 2 of 2: Maybe some missing information is on Sheet 1?) Landscape plan: * 16 foundation plantings/shrubs are required: 8 across the front and 4 on each side. (Foundation plantings must wrap corners.) * In addition to the foundation plantings, the A/C pad is required to be screened with 7 gallon shrubs.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 09/29/2021
CONTRACTOR CHANGE ¤40.00 09/29/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 09/29/2021
STORM WATER PERMIT FEES ¤80.00 10/19/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 10/19/2020
SEWER CREDIT (¤1,466.00) 10/19/2020
WATER- TURN ON ¤25.00 10/19/2020
ADMIN FEE ¤20.00 10/19/2020
CONNECTION FEES ¤1,002.88 10/19/2020
SEWER INSPECTION ¤25.00 10/19/2020
SEWER CAPITAL FACILITY ¤4,596.07 10/19/2020
METER - DEPOSIT ¤60.00 10/19/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 10/19/2020
BUILDING DISCOUNT 100% (¤1,157.60) 10/19/2020
ELECTRIC FEE ¤196.80 10/19/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/19/2020
IMPACT FEE FIRE ¤223.38 10/19/2020
IMPACT FEE PARKS ¤849.24 10/19/2020
IMPACT FEE SCHOOL ¤3,600.00 10/19/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 10/19/2020
MECHANICAL FEE ¤196.80 10/19/2020
WATER -IRRIGATION INSPECTION ¤25.00 10/19/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/19/2020
PLAN CHECK FEE ¤91.20 10/19/2020
PLUMBING FEE ¤196.80 10/19/2020
NEW RESIDENTIAL INSPECTIONS ¤456.00 10/19/2020
SITE PLAN 20 ¤20.00 10/19/2020
SURCHARGE FS 533.721 ¤2.00 10/19/2020
SURCHARGE - FS 468.631 ¤2.00 10/19/2020
WATER -IRRIGATION INSPECTION ¤25.00 08/26/2020
METER - DEPOSIT ¤60.00 08/26/2020
WATER- TURN ON ¤25.00 08/26/2020
SEWER CAPITAL FACILITY ¤4,596.07 08/26/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 08/26/2020
CONNECTION FEES ¤1,002.88 08/26/2020
SEWER CREDIT (¤1,466.00) 08/26/2020
SEWER INSPECTION ¤25.00 08/26/2020
Fees Total Due: ¤0.00 Total Paid: ¤21,752.48