I want to search for...
Permit #2020081083
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00110-0020 |
| CONDITIONED SPACE: 1761 sqft |
| GARAGE: 473 sqft |
| OPENED PORCH (WITH ROOF) : 205 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2549 sqft |
| Block: 00110 |
| Subdivision: - |
| Job Phone: 386-237-1210 |
| Location Address: 22 ZONAL GERANIUM TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/19/2020 |
| NOC: RECORDED |
| Applicant name: ANDRIY POPOV |
| Owner: ZAVYALOV NIKOLAY & LYUDMILA H&W |
|
Address 8 ZONAL CT PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
1 SEATHORN PATH PALM COAST, FL 32164 |
PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2023) | 386-237-1210 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/05/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 08/05/2021 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/04/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 08/04/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 08/04/2021 | APPROVED | GBERTOLA |
| Note: culvert pipe elevation is good | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/04/2021 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 06/28/2021 | APPROVED | RGROSS |
| Note: New inspection due to canceled inspection YOU SPOKE TO SCOTT SURVEYOR CAME IN FIX BENCHMARK ISSUES 6/28/21 - READY TO POUR | |||
| U-CROSS CONNECTION | 06/21/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/21/2021 | CANCELLED BY APPLICANT | WEB |
| Note: YOU SPOKE TO SCOTT SURVEYOR CAME IN FIX BENCHMARK ISSUES | |||
| U - SEWER TIE IN | 05/19/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/19/2021 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 05/19/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:43 am | |||
| ELECTRIC - EARLY POWER | 05/17/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: Hiouse needs to unlocked for inspection | |||
| LATH/BRICK/ WATER BARRIER | 04/21/2021 | APPROVED | TSTAUFFACHER |
| PEP TANK INSTALLATION REQUEST | 04/19/2021 | APPROVED | CSTONE |
| INSULATION | 04/09/2021 | APPROVED | TSTAUFFACHER |
| Note: SUPER NOTE: AC service wire has been pulled to the master bath ceiling below the drywall line | |||
| ALL ROUGH | 04/05/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 03/05/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/16/2021 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 01/08/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 01/07/2021 | APPROVED | TBAKER |
| WATER METER INSTALLATION REQUEST | 01/05/2021 | APPROVED | TCHURCHILL |
| MONOLITHIC SLAB | 12/09/2020 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/01/2020 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/06/2021 | 01/07/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/06/2021 | 01/06/2021 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 10/06/2020 | 10/07/2020 |
| Note: Released By: JBODEN | |||
| MECH | COMPLETE | 10/01/2020 | 10/01/2020 |
| Note: Released By: CPISCITELLI | |||
| BLD | HOLD | 10/01/2020 | 10/06/2020 |
| Note: Held By: JPI 1. Building section #3 on page A-2 and as detailed on page A-5 does not match truss layout. Please clarify and correct. 2. Provide design loads per R301, dead and live for roof and floors as applicable. 3. Provide construction details for built up frame beam at front entry. | |||
| PLUM | COMPLETE | 10/01/2020 | 10/06/2020 |
| Note: Released By: JPI | |||
| ELEC | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 09/18/2020 | 09/22/2020 |
| Note: Released By: ELENS | |||
| MECH | HOLD | 09/18/2020 | 09/18/2020 |
| Note: Held By: CPISCITELLI 1. Orientation of Energy calcs does not match the site plan. Revise to match the site plan.(Second Request) 2. When New is submitted . Energy calcs and EPL card need to be signed by the builder. 3. Provide duct drawing signed by the AC contractor w/ license number 4. Upload all documents as one file. Emergy calcs, heatload and duct drawing | |||
| BLD | HOLD | 09/18/2020 | 09/21/2020 |
| Note: Held By: JPI 1. The submission form did not check off building trade. Please make complete submittals, including resubmittals. | |||
| PLUM | HOLD | 09/18/2020 | 09/21/2020 |
| Note: Held By: JPI 1. The submittal form did not check off building trade. Please make complete submittal, including for resubmittals. | |||
| UTL | COMPLETE | 09/18/2020 | 09/23/2020 |
| Note: Released By: LFITZGERALD | |||
| SW1 | COMPLETE | 09/18/2020 | 09/18/2020 |
| Note: Released By: CTROHA | |||
| SWALE | COMPLETE | 08/25/2020 | 09/22/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 08/24/2020 | 08/29/2020 |
| Note: Held By: JPI 1. Plan submission is incomplete and erroneous. Multiple duplicate documents submitted without explanation as to changes between pages. Only three pages have been signed and sealed. Multiple page submission listed as “Plans4 UPDATED” are unsealed. Please provide one complete signed and sealed set of plans. 2. Provide a complete Product Approval spec sheet. Missing items are as follows: mullions, underlayment, roof vents, wood connectors, wood anchors, lintels, and soffit. 3. Plans do not illustrate interior bearing walls per wall legend. Please correct. 4. Provide design loads per R301. 5. Provide full construction details of front entry feature including conventionally framed roofing. 6. Provide attic access size per R807. 7. Provide mixed construction details with attachments illustrated. 8. Provide splicing dimension and mating details for double top plate of bearing wall. 9. Wall sheathing nailing table is rated at 120 mph. Structure is designed to 140 mph. Please clarify and/or correct. 10. Provide typical interior wall construction detail. 11. Provide wood beam mating details. 12. Provide construction details for built up frame beam at front entry. 13. Additional comments may be generated once sealed plans are submitted. 14. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided. | |||
| CUSVC | COMPLETE | 08/24/2020 | 08/25/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 08/24/2020 | 08/25/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 08/24/2020 | 08/25/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 08/24/2020 | 08/26/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 08/24/2020 | 08/25/2020 |
| Note: Held By: CPISCITELLI 1. Orientation of Energy calcs does not match the site plan. Revise to match the site plan. 2. Submit Heatload calculation showing equipment information. 3. Energy calcs and EPL card need to be signed by the builder. 4. Provide duct drawing signed by the AC contractor | |||
| PLUM | HOLD | 08/24/2020 | 08/29/2020 |
| Note: Held By: JPI 1. Isometric does not illustrate venting for kitchen sink. 2. Isometric indicates a secondary sink after kitchen sink. Please clarify. 3. Provide a signed and sealed plan. | |||
| SW1 | COMPLETE | 08/24/2020 | 08/25/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 08/24/2020 | 08/27/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 08/24/2020 | 08/25/2020 |
| Note: Held By: ELENS Site Plan (and survey) are missing: * Legal Description * FEMA Flood Zone and Map Panel number * Total lot area (square footage) * Width of driveway at the garage door (Uploaded document says "Sheet 2 of 2: Maybe some missing information is on Sheet 1?) Landscape plan: * 16 foundation plantings/shrubs are required: 8 across the front and 4 on each side. (Foundation plantings must wrap corners.) * In addition to the foundation plantings, the A/C pad is required to be screened with 7 gallon shrubs. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 09/29/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 09/29/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 09/29/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/19/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/19/2020 |
| SEWER CREDIT | (¤1,466.00) | 10/19/2020 |
| WATER- TURN ON | ¤25.00 | 10/19/2020 |
| ADMIN FEE | ¤20.00 | 10/19/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/19/2020 |
| SEWER INSPECTION | ¤25.00 | 10/19/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/19/2020 |
| METER - DEPOSIT | ¤60.00 | 10/19/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/19/2020 |
| BUILDING DISCOUNT 100% | (¤1,157.60) | 10/19/2020 |
| ELECTRIC FEE | ¤196.80 | 10/19/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/19/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/19/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/19/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/19/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/19/2020 |
| MECHANICAL FEE | ¤196.80 | 10/19/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/19/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/19/2020 |
| PLAN CHECK FEE | ¤91.20 | 10/19/2020 |
| PLUMBING FEE | ¤196.80 | 10/19/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤456.00 | 10/19/2020 |
| SITE PLAN 20 | ¤20.00 | 10/19/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/19/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/19/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/26/2020 |
| METER - DEPOSIT | ¤60.00 | 08/26/2020 |
| WATER- TURN ON | ¤25.00 | 08/26/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 08/26/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 08/26/2020 |
| CONNECTION FEES | ¤1,002.88 | 08/26/2020 |
| SEWER CREDIT | (¤1,466.00) | 08/26/2020 |
| SEWER INSPECTION | ¤25.00 | 08/26/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,752.48 |