Permit #2020081274

Permit Details

Status: COED

Parcel Id: 07-11-31-7004-00220-0340
CONDITIONED SPACE: 2173 sqft
GARAGE: 506 sqft
OPENED PORCH (WITH ROOF) : 216 sqft
OPENED PORCH (WITH ROOF) : 88 sqft
Total Square Footage: 2983 sqft
Block: 00220
Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE
Job Phone: 386-931-5395
Location Address: 2 CORMORANT CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/30/2020
NOC: RECORDED
Applicant name: RYAN JAMES PERRY
Owner: GARDNER, ASHLEY & CAROL

Address

3010 CAMP RANGER LN

JAMESTOWN, NC 27282

Lot: 0340
Contracted Stated Job Value: ¤290,000.00
Job Description: SINGLE FAMILY RESIDENTIAL
Type: CN

Contractor

WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Sub Contractors

JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
RYAN JAMES PERRY
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/29/2021 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 06/29/2021 FINAL APPROVED WMILLER
ROW - FINAL APRON (AFTER POUR) 06/29/2021 APPROVED KRUTH
Note: culvert elevation is good
ROW FIELD SURVEY /GRADING CERTIFICATION 06/29/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 06/29/2021 APPROVED KRUTH
U -UTILITY RESIDENTIAL FINAL 06/29/2021 FINAL APPROVED JHARDING
U-CROSS CONNECTION 06/28/2021 APPROVED - AS NOTED JHARDING
Note: No cross connections.
FINAL SURVEY (OFFICE USE ONLY) 06/28/2021 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 06/15/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:15
ROW- PRE-APRON (PRE-POUR) 06/04/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
U - SEWER TIE IN 05/27/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 05/27/2021 APPROVED JGIBSON
PROJECT STATUS (OFFICE USE) 03/12/2021 APPROVED - AS NOTED RGROSS
Note: Silt fence at the seawall cannot be collapsed. 3/12/21 - Silt fence stabilized.
INSULATION 02/22/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION NEED FIREBLOCKING AT AREAS HIGHLIGHTED ON FLOOR PLAN 02-22-21... deficiencies noted above resolved
INSULATION 02/19/2021 Disapproved - NO FEE WMILLER
Note: NEED FIREBLOCKING AT AREAS HIGHLIGHTED ON FLOOR PLAN
INSULATION 02/18/2021 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 02/12/2021 APPROVED FWILLIS
ALL ROUGH 02/10/2021 APPROVED TSTAUFFACHER
ELECTRIC-TUG 02/08/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:30
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/01/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION truss A13, and A18 not per engineers specs see highlighted. missing double girder and HUS's in garage per plans
ROOF VALLEY & METAL 02/01/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION 1. must pass roof sheathing/braces/ties/down cells prior 2. VALLEY FLASHING, R905.2.8.2 (complete roof valley linings per code) (need to use proper material) 3. VENT STACKS/PIPES FBC, R, P3103.1 MUST TERMINATE NOT LESS THAN 6 INCHES ABOVE THE ROOF
ROOF VALLEY & METAL 01/29/2021 Disapproved -FEE REQUIRED WMILLER
Note: 1. must pass roof sheathing/braces/ties/down cells prior 2. VALLEY FLASHING, R905.2.8.2 (complete roof valley linings per code) (need to use proper material) 3. VENT STACKS/PIPES FBC, R, P3103.1 MUST TERMINATE NOT LESS THAN 6 INCHES ABOVE THE ROOF
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/21/2021 Disapproved -FEE REQUIRED WMILLER
Note: truss A13, and A18 not per engineers specs see highlighted. missing double girder and HUS's in garage per plans
TIE BEAM / LINTEL 12/11/2020 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 12/10/2020 APPROVED TBAKER
MONOLITHIC SLAB 11/17/2020 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 11/12/2020 APPROVED JGIBSON
STEM WALL FOUNDATION 11/02/2020 APPROVED WMILLER
WATER METER INSTALLATION REQUEST 10/26/2020 APPROVED CSTONE
FOOTER 10/22/2020 APPROVED MMESSER

Review History

Department Status Date In Date Out
ZON COMPLETE 03/08/2021 03/08/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/26/2021 02/01/2021
Note: Released By: FREODICA Revision - changed truss layout.
BLD COMPLETE 01/12/2021 01/20/2021
Note: Released By: FREODICA Revision - truss repair on truss A-13 -18.
ENGIN1 COMPLETE 12/09/2020 12/10/2020
Note: Released By: TBAKER
ZON COMPLETE 12/09/2020 12/09/2020
Note: Released By: TDOAK
BLD COMPLETE 10/22/2020 10/30/2020
Note: Released By: PBUCKLEY
ZON COMPLETE 09/14/2020 09/14/2020
Note: Released By: ELENS
SW1 COMPLETE 09/08/2020 09/08/2020
Note: Released By: GBERTOLA
MECH HOLD 09/04/2020 09/08/2020
Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder. (Second Request)
PLFM COMPLETE 09/04/2020 09/04/2020
Note: Released By: JMYERS According to the Site Plan submitted on 9/4/2020 the structure will be outside of the SFHA. No elevation certificates will be required.
ZON HOLD 09/04/2020 09/04/2020
Note: Held By: ELENS House is flipped on site plan and floor plan. Please resubmit landscape plan to match. Please note that 8 foundation plantings/shrubs are required across the front, 6 are required on the right, facing the public right of way, and 4 are required on the left - in addition to the A/C being screened with 7 gallon shrubs. (They must wrap the corners of the house.) Repeat comments: No exterior color is given on the color sheet. The elevations show two exterior materials. Please list both exteriors on the color sheet with their colors. (Please note that only one exterior color is allowed, so they must match.) Please note that windows and doors facing a public right of way must be banded. (Right side windows.)
PLUM COMPLETE 09/04/2020 09/10/2020
Note: Released By: JPI
BLD COMPLETE 09/04/2020 09/10/2020
Note: Released By: JPI
ENGIN1 COMPLETE 09/04/2020 09/08/2020
Note: Released By: TBAKER
UTL COMPLETE 09/04/2020 09/10/2020
Note: Released By: LFITZGERALD
MECH COMPLETE 09/01/2020 09/08/2020
Note: Released By: CPISCITELLI
PLFM HOLD 08/28/2020 08/28/2020
Note: Held By: JMYERS The survey and the site plan show an "Approximate Flood Zone Line". This is not sufficient to determine if the structure is in a flood zone or not. Please provide a revised survey and site plan that shows the exact location of the flood zones on the property.
SWALE COMPLETE 08/27/2020 10/01/2020
Note: Released By: TBAKER
BLD HOLD 08/26/2020 09/03/2020
Note: Held By: JPI 1. Please provide length of attic access per FRC 807. 2. Provide location of summer kitchen on floor plans. 3. Provide roof ventilation calculations, per R806. 4. Provide full structural construction details for any conventional roof framing, such as valley framing, with all attachments illustrated. Entry and bedroom appear to have areas of conventional framing. 5. Footing plans call for Type 3 footing at front entry. That per table is the garage footing. Clarify footing type. 6. Identify footing type from garage to dwelling. Plans indicate a 4” stepdown. 7. Provide section thru garage to dwelling wall to illustrate compliance with R302.6 Separation or provide notes to that effect. 8. Provide a written response to the comments with revisions clouded on plan and page numbers of new details provided.
CUSVC COMPLETE 08/26/2020 09/01/2020
Note: Released By: HHAND
ELEC COMPLETE 08/26/2020 08/28/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 08/26/2020 08/27/2020
Note: Released By: TBAKER
LOCATE COMPLETE 08/26/2020 08/28/2020
Note: Released By: CSTONE
MECH HOLD 08/26/2020 08/28/2020
Note: Held By: CPISCITELLI 1. Plans show R38 with a vented attic. Energy calcs show R20 at roof deck with non vented attic. Revise to match 2. Energy Calcs and EPL card need to be signed by the builder
PLUM HOLD 08/26/2020 09/03/2020
Note: Held By: JPI 1. Isometric indicates a tub in master bath. Plans do not illustrate a tub. 2. No indication of summer kitchen location on floor plans.
SW1 COMPLETE 08/26/2020 08/28/2020
Note: Released By: CTROHA
UTL COMPLETE 08/26/2020 09/01/2020
Note: Released By: LFITZGERALD
ZON HOLD 08/26/2020 08/28/2020
Note: Held By: ELENS Please add shrubs (foundation plantings) to wrap the right front corner of the residence. No exterior color is given on the color sheet. The elevations show two exterior materials. Please list both exteriors on the color sheet with their colors. (Please note that only one exterior color is allowed, so they must match.) Windowless walls are prohibited facing a public right of way. (right side) (Please note that windows and doors facing a public right of way must be banded.)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 06/29/2021
REVISION ¤40.00 06/29/2021
REINSPECTION FEE ¤40.00 06/29/2021
REINSPECTION FEE ¤40.00 06/29/2021
NEW RESIDENTIAL INSPECTIONS ¤580.00 09/30/2020
SITE PLAN 20 ¤20.00 09/30/2020
SURCHARGE FS 533.721 ¤2.00 09/30/2020
SURCHARGE - FS 468.631 ¤2.00 09/30/2020
STORM WATER PERMIT FEES ¤80.00 09/30/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 09/30/2020
SEWER INSPECTION ¤25.00 09/30/2020
SEWER CAPITAL FACILITY ¤4,596.07 09/30/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 09/30/2020
METER - DEPOSIT ¤60.00 09/30/2020
WATER- TURN ON ¤25.00 09/30/2020
ADMIN FEE ¤20.00 09/30/2020
CONNECTION FEES ¤1,002.88 09/30/2020
BUILDING DISCOUNT 100% (¤1,418.00) 09/30/2020
ELECTRIC FEE ¤234.00 09/30/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/30/2020
IMPACT FEE FIRE ¤223.38 09/30/2020
IMPACT FEE PARKS ¤849.24 09/30/2020
IMPACT FEE SCHOOL ¤3,600.00 09/30/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 09/30/2020
MECHANICAL FEE ¤234.00 09/30/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/30/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/30/2020
PLAN CHECK FEE ¤116.00 09/30/2020
PLUMBING FEE ¤234.00 09/30/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,636.35