Permit #2020081324
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-0050 |
| CONDITIONED SPACE: 2045 sqft |
| GARAGE: 442 sqft |
| OPENED PORCH (WITH ROOF) : 314 sqft |
| OPENED PORCH (WITH ROOF) : 67 sqft |
| Total Square Footage: 2868 sqft |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 386-447-4400 |
| Location Address: 10 DEL PALMA DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/22/2020 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: GIORDANO, THOMAS & CHRISTINA |
|
Address 153 MARVIN RD MIDDLETOWN , NJ 07748 |
| Lot: 5 |
| Contracted Stated Job Value: ¤358,900.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
KEN DEPRINZIO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
325 WALKER STREET HOLLY HILL, FL 32117 |
11351 (Exp: 08/31/2026) | 386-672-8494 | 386-673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 10/06/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| BLD - BUILDING FINAL | 09/30/2021 | FINAL APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 09/20/2021 | CANCELLED BY APPLICANT | LMILLER |
| U -UTILITY RESIDENTIAL FINAL | 09/20/2021 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 08/18/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/18/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 08/18/2021 | APPROVED | GBERTOLA |
| FINAL SURVEY (OFFICE USE ONLY) | 08/18/2021 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 06/30/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Approved for the Apron, sidewalk, and paver restraints only. Paver Driveway. | |||
| ROW- PAVER RESTRAINTS | 06/08/2021 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 06/08/2021 | PARTIALLY APPROVED | RGROSS |
| Note: Approved for the Apron, sidewalk, and paver restraints only. Paver Driveway. | |||
| ELECTRIC - EARLY POWER | 06/04/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 12:50 pm | |||
| ROW - DRAINAGE | 04/29/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Catch basin in the curb and guttern in front of this construction needs a sediment control device installed. Next inspetion 4/22/20. 4/22/21 - Still no Sediment Control devices protecting the storm drain in front of this construction. Next Inspection 2/29/21 4/29/21 - Sediment control device placed and secured over the Catch Basin. No further need for ongoing monitoring. | |||
| ROW - DRAINAGE | 04/22/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION Catch basin in the curb and guttern in front of this construction needs a sediment control device installed. Next inspetion 4/22/20. 4/22/21 - Still no Sediment Control devices protecting the storm drain in front of this construction. Next Inspection 2/29/21 | |||
| ROW - DRAINAGE | 04/19/2021 | Disapproved - NO FEE | RGROSS |
| Note: Catch basin in the curb and guttern in front of this construction needs a sediment control device installed. Next inspetion 4/22/20. | |||
| U - SEWER TIE IN | 04/15/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 04/15/2021 | APPROVED | JGIBSON |
| INSULATION | 04/15/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 04/08/2021 | APPROVED - AS NOTED | BGREVE |
| Note: missing kickplate on DWV at top plate in laundry room. install so it can be verified at insulation inspection | |||
| LATH/BRICK/ WATER BARRIER | 04/05/2021 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 03/09/2021 | APPROVED | WMILLER |
| DOWN CELL | 03/05/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: I think this may be an error in request: Down cells have been approved in the past, Should this should be a roof valley matal inspection? If so, it would pass. | |||
| ELECTRIC-TUG | 03/04/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:50 am | |||
| ELECTRIC - EARLY POWER | 02/18/2021 | Disapproved - NO FEE | RMARTIN |
| Note: WRONG INSPECTION CALLED IN, MAYBE TUG INSPECTION NEEDED? | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/18/2021 | APPROVED | WMILLER |
| TIE BEAM / LINTEL | 02/02/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION Marked in green paint--5 locations--vertical bar cover does not meet compliance R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm). 02-02-21... deficiencies noted above resolved | |||
| TIE BEAM / LINTEL | 01/28/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Marked in green paint--5 locations--vertical bar cover does not meet compliance R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm). | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/27/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/08/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION 1. Revision needed, plans call detail MB (this detail was not on the plans) 2. shower calls for no step down 3. missplaced vertical reinforcement (all highlighted on plans) 01-08-21... deficiencies noted above resolved | |||
| MONOLITHIC SLAB | 12/17/2020 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. Revision needed, plans call detail MB (this detail was not on the plans) 2. shower calls for no step down 3. missplaced vertical reinforcement (all highlighted on plans) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/03/2020 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED TO INSULATE HOT WATER LINES UNDER SLAB FOR RECIRC SYSTEM BEFORE SLAB INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 10/08/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/24/2021 | 03/31/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FReodica@ci.palm-coast.fl.us Revision - changed product approval model of tile roofing to saxony 900. | |||
| ENGIN1 | COMPLETE | 01/26/2021 | 01/27/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/26/2021 | 01/26/2021 |
| Note: Released By: TDOAK | |||
| BLD | COMPLETE | 12/23/2020 | 01/05/2021 |
| Note: Released By: FREODICA Revision - changed footer detail for garage, lanai, ac pad to E1 on foundation plan. | |||
| ZON | COMPLETE | 11/10/2020 | 11/10/2020 |
| Note: Released By: TDOAK | |||
| BLD | COMPLETE | 11/10/2020 | 11/18/2020 |
| Note: Released By: FREODICA Revision: enclosed summer kitchen at lanai with block wall. See Sheets 1 & 2. | |||
| BLD | COMPLETE | 09/22/2020 | 09/29/2020 |
| Note: Released By: PBUCKLEY | |||
| SW1 | COMPLETE | 09/15/2020 | 09/18/2020 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 09/15/2020 | 09/16/2020 |
| Note: Released By: AMOBLEY | |||
| PLUM | COMPLETE | 09/15/2020 | 09/19/2020 |
| Note: Released By: JPI | |||
| BLD | COMPLETE | 09/15/2020 | 09/19/2020 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 09/15/2020 | 09/16/2020 |
| Note: Released By: TBAKER | |||
| UTL | COMPLETE | 09/15/2020 | 09/18/2020 |
| Note: Released By: LFITZGERALD | |||
| BLD | HOLD | 09/09/2020 | 09/09/2020 |
| Note: Held By: JBODEN 6. Provide typical interior wall detail. 7. Product approval missing the following items: soffits and mullions. 10. Provide a written response to the comments with revisions clouded (preferred for ease of review, not required) on plan and page numbers of new details provided. | |||
| ZON | HOLD | 09/01/2020 | 09/01/2020 |
| Note: Held By: TDOAK Please provide the height and color of the ac screen vinyl fencing for review on landscape plan Site plan must show the setback on the left side of the home from the closest point to the property line. | |||
| URB | COMPLETE | 08/31/2020 | 09/03/2020 |
| Note: Released By: JBEAUDET | |||
| BLD | HOLD | 08/27/2020 | 09/04/2020 |
| Note: Held By: JPI 1. Provide mating details for double top plate of bearing wall. 2. On page 7, the valley rafter detail lacks attachment details. Please provide details for attachment of rafters to ridge beam, sleeper attachment, collar tie fastening, etc… 3. Provide a mixed construction detail of wood framing to block with attachments clearly identified. 4. Provide knee wall stud size and spacing. Provide fastening details for box header. 5. Identify which knee wall will be utilized. 6. Provide typical interior wall detail. 7. Product approval missing the following items: soffits and mullions. 10. Provide a written response to the comments with revisions clouded (preferred for ease of review, not required) on plan and page numbers of new details provided. | |||
| CUSVC | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 08/27/2020 | 08/28/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 08/27/2020 | 09/01/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 08/27/2020 | 08/31/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 08/27/2020 | 09/04/2020 |
| Note: Held By: JPI 1. Plumbing Isometric not provided. Please provide for review. 2. Provide calculations for gas piping to illustrate developed lengths are adequate to supply BTU requirements of appliances. Indicate tables utilized for calculations. | |||
| SW1 | HOLD | 08/27/2020 | 08/31/2020 |
| Note: Held By: CTROHA See uploaded Stormwater checklist in attachments for correction | |||
| UTL | COMPLETE | 08/27/2020 | 09/02/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 08/27/2020 | 08/31/2020 |
| Note: Held By: AMOBLEY Please provide the height and color of the ac screen vinyl fencing for review on landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 10/05/2021 |
| REVISION | ¤40.00 | 10/05/2021 |
| REINSPECTION FEE | ¤40.00 | 10/05/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 10/05/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 10/05/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤91.77) | 09/22/2020 |
| SEWER INSPECTION | ¤25.00 | 09/22/2020 |
| SEWER CAPITAL FACILITY | ¤2,389.36 | 09/22/2020 |
| WATER CAPITAL FACILITY FEE | ¤2,234.43 | 09/22/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/22/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤718.00 | 09/22/2020 |
| SITE PLAN 20 | ¤20.00 | 09/22/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/22/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/22/2020 |
| METER - DEPOSIT | ¤60.00 | 09/22/2020 |
| WATER-METER | ¤434.59 | 09/22/2020 |
| ADMIN FEE | ¤20.00 | 09/22/2020 |
| CONNECTION FEES | ¤25.00 | 09/22/2020 |
| BUILDING DISCOUNT 100% | (¤1,707.80) | 09/22/2020 |
| ELECTRIC FEE | ¤275.40 | 09/22/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/22/2020 |
| IMPACT FEE FIRE | ¤223.38 | 09/22/2020 |
| IMPACT FEE PARKS | ¤849.24 | 09/22/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/22/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 09/22/2020 |
| MECHANICAL FEE | ¤275.40 | 09/22/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/22/2020 |
| PLAN CHECK FEE | ¤143.60 | 09/22/2020 |
| PLUMBING FEE | ¤275.40 | 09/22/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,060.05 |