Permit #2020081383

Permit Details

Status: COED

Parcel Id: 07-11-31-1040-00000-0550
CONDITIONED SPACE: 2651 sqft
GARAGE: 608 sqft
OPENED PORCH (WITH ROOF) : 207 sqft
OPENED PORCH (WITH ROOF) : 122 sqft
Total Square Footage: 3588 sqft
Block: 00000
Subdivision: 2078 - CANTERBURY ESTATES
Job Phone: 321-610-3924
Location Address: 11 LEWISDALE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/03/2020
NOC: RECORDED
Applicant name: KENNETH WAYNE CAMBELL JR
Owner: VINTAGE ESTATE HOMES LLC

Address

11 LEWISDALE LANE

PALM COAST, FL 32137

Lot: 0550
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES LLC
Status Location Address Mailing Address State License Number Phone
CANCEL

4885 N WICKHAM RD

MELBOURNE, FL 32940

SUITE 101

MELBOURNE, FL 32940

CBC058803 (Exp: 08/31/2022) 321-610-3924

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/10/2021 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 06/10/2021 FINAL APPROVED DHANEY
U-CROSS CONNECTION 06/04/2021 APPROVED DHANEY
U - SEWER TIE IN 06/04/2021 APPROVED JGIBSON
ROW - STORMWATER FINAL 06/02/2021 APPROVED KRUTH
Note: THIS IS A REINSPECTION sidewalk is not finished yet
ROW - FINAL APRON (AFTER POUR) 06/02/2021 APPROVED KRUTH
Note: THIS IS A REINSPECTION sidewalk is not finished yet
ROW - STORMWATER FINAL 05/28/2021 Disapproved - NO FEE KRUTH
Note: sidewalk is not finished yet
ROW - FINAL APRON (AFTER POUR) 05/28/2021 Disapproved -FEE REQUIRED KRUTH
Note: sidewalk is not finished yet
ROW FIELD SURVEY /GRADING CERTIFICATION 05/25/2021 APPROVED KRUTH
Note: the sidewalk needs to be comepleted
FINAL SURVEY (OFFICE USE ONLY) 05/25/2021 APPROVED KRUTH
ROW- PRE-APRON (PRE-POUR) 05/10/2021 APPROVED KRUTH
ELECTRIC - EARLY POWER 04/30/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:27 am
TUB SET 04/29/2021 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 03/12/2021 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 03/11/2021 APPROVED CSTONE
INSULATION 03/04/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Penertrations through the Top Plate are NOT fire Blocked. FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL).
INSULATION 03/02/2021 Disapproved -FEE REQUIRED FWILLIS
Note: Penertrations through the Top Plate are NOT fire Blocked. FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL).
ALL ROUGH 02/24/2021 CANCELLED BY APPLICANT WEB
ALL ROUGH 02/24/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/09/2021 APPROVED FWILLIS
ROOF VALLEY & METAL 02/09/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 02/08/2021 APPROVED TBAKER
TIE BEAM / LINTEL 01/13/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Dowel missing in rear. Marked in Orange on wall. Bed Joints on window Sill exceeds FBC R606.3.1 (3/8" to 1/2") - 3 Window Sills 1/13/21 - Items corrected.
TIE BEAM / LINTEL 01/12/2021 Disapproved - NO FEE FWILLIS
TIE BEAM / LINTEL 01/12/2021 Disapproved - NO FEE FWILLIS
Note: Dowel missing in rear. Marked in Orange on wall. Bed Joints on window Sill exceeds FBC R606.3.1 (3/8" to 1/2") - 3 Window Sills
MONOLITHIC SLAB 12/30/2020 APPROVED FWILLIS
GRAVITY SEWER TEST 12/17/2020 APPROVED - AS NOTED JGIBSON
Note: THIS INSPECTION WAS APPROVED ON 12/16/20 ALONG WITH FIRST ROUGH PLUMBING INSPECTION
WATER METER INSTALLATION REQUEST 12/17/2020 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 12/16/2020 APPROVED JGIBSON

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/04/2021 02/08/2021
Note: Released By: TBAKER
ZON COMPLETE 02/04/2021 02/04/2021
Note: Released By: TDOAK
ENGIN1 HOLD 01/12/2021 01/13/2021
Note: Held By: TBAKER Formboard survey is not acceptable as foundation survey
ZON COMPLETE 01/12/2021 01/12/2021
Note: Released By: AMOBLEY
ZON COMPLETE 10/14/2020 10/14/2020
Note: Released By: AMOBLEY
MECH COMPLETE 10/09/2020 10/09/2020
Note: Released By: CPISCITELLI
ZON HOLD 10/09/2020 10/09/2020
Note: Held By: AMOBLEY Roof pitch missing on elevation page
ELEC COMPLETE 10/09/2020 10/09/2020
Note: Released By: JMUNSON
BLD COMPLETE 10/09/2020 10/13/2020
Note: Released By: JPI
SW1 COMPLETE 09/01/2020 09/01/2020
Note: Released By: GBERTOLA
UTL COMPLETE 08/28/2020 09/02/2020
Note: Released By: LFITZGERALD
ZON HOLD 08/28/2020 09/01/2020
Note: Held By: AMOBLEY Roof pitch missing on plans Garage depth can not exceed the maximum 30ft
BLD HOLD 08/28/2020 09/07/2020
Note: Held By: JPI 1) S101- SQUARE FOOTERS UNDER COLUMNS ARE NOT SPECIFIED. ([A]107.2.1) 2) COLUMNS/FRAMING SPECS ARE NOT PROVIDED FOR THE CURVED WALL. ([A]107.2.1)
CUSVC COMPLETE 08/28/2020 09/02/2020
Note: Released By: HHAND
ELEC HOLD 08/28/2020 09/01/2020
Note: Held By: JMUNSON Submit electric load calcs and riser diagram.
ENGIN1 COMPLETE 08/28/2020 08/31/2020
Note: Released By: TBAKER
LOCATE COMPLETE 08/28/2020 09/01/2020
Note: Released By: CSTONE
MECH HOLD 08/28/2020 08/31/2020
Note: Held By: CPISCITELLI Orientation of heatload does not match the site plan. Revise to match the site plan
PLUM COMPLETE 08/28/2020 09/07/2020
Note: Released By: JPI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/14/2021
STORMWATER REINSPECTION FEE ¤40.00 06/14/2021
3% TRANS IMPACT FEE CREDIT (¤91.77) 11/03/2020
SEWER INSPECTION ¤25.00 11/03/2020
SEWER CAPITAL FACILITY ¤2,911.19 11/03/2020
WATER CAPITAL FACILITY FEE ¤2,705.58 11/03/2020
NEW RESIDENTIAL INSPECTIONS ¤664.00 11/03/2020
SITE PLAN 20 ¤20.00 11/03/2020
SURCHARGE FS 533.721 ¤2.00 11/03/2020
SURCHARGE - FS 468.631 ¤2.00 11/03/2020
STORM WATER PERMIT FEES ¤80.00 11/03/2020
METER - DEPOSIT ¤60.00 11/03/2020
WATER-METER ¤434.59 11/03/2020
ADMIN FEE ¤20.00 11/03/2020
CONNECTION FEES ¤25.00 11/03/2020
CONTRACTOR CHANGE ¤40.00 11/03/2020
CONTRACTOR CHANGE ¤40.00 11/03/2020
BUILDING DISCOUNT 100% (¤1,594.40) 11/03/2020
ELECTRIC FEE ¤259.20 11/03/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 11/03/2020
IMPACT FEE FIRE ¤223.38 11/03/2020
IMPACT FEE PARKS ¤849.24 11/03/2020
IMPACT FEE SCHOOL ¤3,600.00 11/03/2020
IMPACT FEE TRANSPORTATION ¤3,059.00 11/03/2020
MECHANICAL FEE ¤259.20 11/03/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 11/03/2020
PLAN CHECK FEE ¤132.80 11/03/2020
PLUMBING FEE ¤259.20 11/03/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,033.03