I want to search for...

Permit #2020081420

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00530-0190
CONDITIONED SPACE: 1502 sqft
GARAGE: 454 sqft
OPENED PORCH (WITH ROOF) : 168 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
OPENED PORCH (WITH ROOF) : 88 sqft
CONDITIONED SPACE: 167 sqft
OPENED PORCH (WITH ROOF) : 94 sqft
Total Square Footage: 2513 sqft
Block: 00530
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 386-313-6950
Location Address: 17 WHEELER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/20/2020
NOC: RECORDED
Applicant name: MARK ANTHONY LANGELLO
Owner: FLAGLER SELECT PROPERTIES LLC

Address

UNIT 58

BUNNELL, FL 32110

Address

2323 N STATE

BUNNELL, FL 32110

Lot: 0190
Contracted Stated Job Value: ¤150,000.00
Job Description: Single Family Residence
Type: CN

Contractor

M & M DEVELOPMENT & CONSTRUCTION LLC
Status Location Address State License Number Phone
CANCEL

2323 N. STATE ST

BUNNELL, FL 32110

RG291103911 (Exp: 08/31/2023) 386-313-6950

Sub Contractors

CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/24/2021 FINAL APPROVED KSANDOE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Termite cert needs to be affixed to the electrical panel. Energy calculations, model numbers did not match installed units. Submit revised energy calcs to the city for approval Cannot hand write model numbers for equipment
BLD - BUILDING FINAL 11/19/2021 Disapproved -FEE REQUIRED KSANDOE
Note: THIS IS A REINSPECTION Termite cert needs to be affixed to the electrical panel. Energy calculations, model numbers did not match installed units. Submit revised energy calcs to the city for approval Cannot hand write model numbers for equipment
BLD - BUILDING FINAL 11/18/2021 Disapproved - NO FEE JWALKER
Note: Termite cert needs to be affixed to the electrical panel. Energy calculations, model numbers did not match installed units.
U -UTILITY RESIDENTIAL FINAL 11/18/2021 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION no power to house-no power to pep tank/circuit breakers not installed yet
ELECTRIC - EARLY POWER 11/08/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:53 am
ROW - STORMWATER FINAL 11/03/2021 APPROVED KRUTH
U -UTILITY RESIDENTIAL FINAL 11/03/2021 Disapproved - NO FEE LFITZGERALD
Note: no power to house-no power to pep tank/circuit breakers not installed yet
ROW - FINAL APRON (AFTER POUR) 11/03/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 10/11/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 10/11/2021 APPROVED KRUTH
GRAVITY SEWER TEST 07/14/2021 APPROVED JGIBSON
U - SEWER TIE IN 07/14/2021 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 07/08/2021 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION 7/8/21 - On site with builder as adjustment were made to the culvert elevation. Pipe floated overnight. READY TO POUR at the time of inspection. Heavy rain in the forecast. Builder advised to double check elevation before pouring.
ROW- PRE-APRON (PRE-POUR) 07/06/2021 CANCELLED BY APPLICANT RGROSS
PEP TANK INSTALLATION REQUEST 06/02/2021 APPROVED CSTONE
INSULATION 05/21/2021 APPROVED JWALKER
ROOF VALLEY & METAL 05/20/2021 APPROVED - AS NOTED JWALKER
Note: THIS IS A REINSPECTION The frist row of the modifided bitumen self adhearing the plastic was not remove allowning the underlament to adhere to the plywood aroung the whole perimeter of the building. There also appears to be a manufactures defect of the underlayment and the to plastic coating is peeling away. Metal roofing of the building was in process. Upon conversation with the builder Mark. He did submitt a letter from manufacture to the building dept about the underlayment defect and is awiting approval. I told him it was ok to prceed with installation at his risk of the letter being rejected. He agreed . The modifided bitumen self adhearing first row was reinspected and fastened properly.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/20/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION Truss spacing inbetween AT01 and GDR1 is greater than 2' o.c. print does not show a truss in that space. However spacing is greater than the 2' o.c. max spacing for trusses. R802.10 Confirm all VGT w/hold downs nuts are tightened properly.
ROOF VALLEY & METAL 05/19/2021 Disapproved - NO FEE JWALKER
Note: The frist row of the modifided bitumen self adhearing the plastic was not remove allowning the underlament to adhere to the plywood aroung the whole perimeter of the building. There also appears to be a manufactures defect of the underlayment and the to plastic coating is peeling away.
ALL ROUGH 05/18/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION Missing nail plates through out. Windows need to be fasten 4" from edge. 8" O.C. per manufactures specs Secure water supply line at tub. Electrical panel needs boxed/framed out to protect conduit. Ground rod not connected to UFER.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/11/2021 Disapproved - NO FEE JWALKER
Note: Truss spacing inbetween AT01 and GDR1 is greater than 2' o.c. print does not show a truss in that space. However spacing is greater than the 2' o.c. max spacing for trusses. R803 Confirm all VGT w/hold downs nuts are tightened properly.
ALL ROUGH 05/11/2021 Disapproved - NO FEE JWALKER
Note: Missing nail plates through out. Windows need to be fasten 4" from edge. 8" O.C. per manufactures specs Secure water supply line at tub. Electrical panel needs boxed/framed out to protect conduit. Ground rod not connected to UFER. Dryer duct at 45 degree bend needs to be sealed
FOUND SURVEY APPROVED (OFFICE) 05/10/2021 APPROVED TBAKER
MONOLITHIC SLAB 05/04/2021 APPROVED MMESSER
Note: THIS IS A REINSPECTION Need compaction report.
U-CROSS CONNECTION 04/01/2021 APPROVED - AS NOTED DHANEY
Note: Approved No IRR. No Cross CN
LATH/BRICK/ WATER BARRIER 03/25/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION All banding and cornerbead needs to be installed for inspection 03-25-21... notes above resolved
LATH/BRICK/ WATER BARRIER 03/22/2021 Disapproved -FEE REQUIRED JBODEN
Note: All banding and cornerbead needs to be installed for inspection
TIE BEAM / LINTEL 01/13/2021 APPROVED MMESSER
MONOLITHIC SLAB 01/04/2021 Disapproved - NO FEE MMESSER
Note: Need compaction report.
ELECTRIC TEMP POLE 12/14/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:50
PLUMBING 1ST ROUGH UNDERGROUND 12/03/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 11/04/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 11/22/2021 11/22/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 11/19/2021 11/19/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Square footage on Energy calcs and heatload does not match the plans. Revise to match 2. Energy calcs need to be signed by the builder
BLD COMPLETE 05/17/2021 05/19/2021
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ZON COMPLETE 05/10/2021 05/10/2021
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/10/2021 05/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/04/2021 05/05/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 05/04/2021 05/04/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM House does not meet minimum 25' front setback.
SW1 COMPLETE 12/09/2020 12/09/2020
Note: Released By: GBERTOLA
BLD COMPLETE 12/04/2020 12/09/2020
Note: Released By: FREODICA Revision 3 - changed dimensions of the house.
ENGIN1 COMPLETE 12/04/2020 12/04/2020
Note: Released By: TBAKER
MECH COMPLETE 12/04/2020 12/04/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 12/04/2020 12/09/2020
Note: Released By: FREODICA Revision not applicable.
ZON COMPLETE 12/04/2020 12/07/2020
Note: Released By: AMOBLEY
ELEC COMPLETE 09/17/2020 09/17/2020
Note: Released By: JMUNSON
ZON COMPLETE 09/17/2020 09/18/2020
Note: Released By: TDOAK
ZON HOLD 09/10/2020 09/11/2020
Note: Held By: AMOBLEY No new elevation page submitted removing the wording for the decorative shutters
BLD COMPLETE 09/10/2020 09/16/2020
Note: Released By: JPI
SW1 COMPLETE 09/10/2020 09/16/2020
Note: Released By: CTROHA
ELEC HOLD 09/10/2020 09/11/2020
Note: Held By: JMUNSON Electric load calcs have different contractor on them and wrong address
MECH COMPLETE 09/10/2020 09/10/2020
Note: Released By: CPISCITELLI
ZON HOLD 09/01/2020 09/01/2020
Note: Held By: AMOBLEY Please provide the walkway width and material on the site plan/survey Color sheet in pachage was blank. Please provide a completed color sheet. Please list the exterior material on the color sheet as siding and stucco and add a note that the stucco paint will match the siding. The floor plan shows two lanais and square footage for only one of them. Please correct. Shutters need to match the window height: LDRC Chapter 13: 13.03.03. D - D. Shutters.Shutters function as an accent to windows as well as weather protection. 1. Accent shutters.Accent shutters are designed as a visual detail for windows. a. Accent shutters shall be a contrasting color to the wall color. b. Shutters shall match the height of the window. c. Acceptable types of accent shutters include traditional horizontal slat or panel type shutters. Professional scoring or etching of a stucco wall to give the appearance of shutters is also acceptable. House does not meet the minimum front setback of 25ft Please give more detail on color sheet for the metal roof. It can not b
MECH HOLD 09/01/2020 09/01/2020
Note: Held By: CPISCITELLI Previous hold comments are not correct. This is the correct hold 1. Orientation of Energy Calcs does not match the site plan. Revise to match the site plan. 2. Energy calcs need to be signed by the builder
SW1 HOLD 09/01/2020 09/01/2020
Note: Held By: GBERTOLA FLOW ARROWS NOT PRESENT. NOT SOD ELEVATION.NOT FINISH FLOOR ELEVATION. NOT MINIMUM SLOPE FOR THE FIRST 10'
SWALE COMPLETE 09/01/2020 10/05/2020
Note: Released By: TBAKER
SW1 HOLD 09/01/2020 09/01/2020
Note: Held By: GBERTOLA FLOW ARROWS NOT PRESENT. NOT SOD ELEVATION. NOT FINISH FLOOR ELEVATION. NOT MIMIMUM SLOPE FOR THE FIRST 10'
UTL COMPLETE 08/31/2020 09/02/2020
Note: Released By: LFITZGERALD
BLD HOLD 08/31/2020 09/07/2020
Note: Held By: JPI 1) A2- FOOTER 4 IS NOT DIMENSIONED. ([A]107.2.1) 2) A2- MULTIPLE LINTELS ARE NOT TAGGED. ([A]107.2.1) 3) A3- WIND SPEED IS TOO SLOW, SEE ASCE7 -10 HAZARD TOOL FOR THIS LOCATION. ([A]107.2.1) 4) A4- ALL CONNECTOR TAGS ARE LABELED TYPICAL. CLARIFY WHICH ARE SPECIFIC AND WHICH ARE TYPICAL. ([A]107.2.1)
CUSVC COMPLETE 08/31/2020 09/02/2020
Note: Released By: HHAND
ELEC HOLD 08/31/2020 09/01/2020
Note: Held By: JMUNSON Submit electric load calcs.
ENGIN1 COMPLETE 08/31/2020 09/01/2020
Note: Released By: TBAKER
LOCATE COMPLETE 08/31/2020 09/01/2020
Note: Released By: CSTONE
MECH HOLD 08/31/2020 09/01/2020
Note: Held By: CPISCITELLI 1. Orientation of Energy Calcs does not match the site plan. Revise to match the site plan. 2. Energy calcs say R0.9 on block walls. Plans show R9. Revise to match. 3. Energy calcs and EPL card need to be signed by the builder.
PLUM COMPLETE 08/31/2020 09/07/2020
Note: Released By: JPI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 12/06/2021
PLAN REVIEW - REVISION ¤32.50 12/06/2021
REINSPECTION RESIDENTIAL ¤40.00 12/06/2021
REVISION ¤40.00 12/06/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 12/06/2021
REINSPECTION FEE ¤40.00 12/06/2021
NEW RESIDENTIAL INSPECTIONS ¤396.00 09/20/2020
STORM WATER PERMIT FEES ¤80.00 09/20/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 09/20/2020
SEWER CREDIT (¤1,147.00) 09/20/2020
SEWER INSPECTION ¤25.00 09/20/2020
SEWER CAPITAL FACILITY ¤4,596.07 09/20/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 09/20/2020
SITE PLAN 20 ¤20.00 09/20/2020
SURCHARGE FS 533.721 ¤2.00 09/20/2020
SURCHARGE - FS 468.631 ¤2.00 09/20/2020
CONNECTION FEES ¤1,002.88 09/20/2020
METER - DEPOSIT ¤60.00 09/20/2020
WATER- TURN ON ¤25.00 09/20/2020
ADMIN FEE ¤20.00 09/20/2020
BUILDING DISCOUNT 100% (¤1,031.60) 09/20/2020
ELECTRIC FEE ¤178.80 09/20/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/20/2020
IMPACT FEE FIRE ¤223.38 09/20/2020
IMPACT FEE PARKS ¤849.24 09/20/2020
IMPACT FEE SCHOOL ¤3,600.00 09/20/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 09/20/2020
MECHANICAL FEE ¤178.80 09/20/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/20/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/20/2020
PLAN CHECK FEE ¤79.20 09/20/2020
PLUMBING FEE ¤178.80 09/20/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,541.85