Permit #2020090116

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00640-0010
CONDITIONED SPACE: 2517 sqft
GARAGE: 484 sqft
OPENED PORCH (WITH ROOF) : 380 sqft
OPENED PORCH (WITH ROOF) : 146 sqft
Total Square Footage: 3527 sqft
Block: 00640
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 386-447-7007
Location Address: 88 RYAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/29/2020
NOC: RECORDED
Applicant name: MAXIM TARANNIK
Owner: TRANG IDA

Address

3981 EAST MEADOW DRIVE

DULUTH, GA 30096

Lot: 0010
Contracted Stated Job Value: ¤330,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLDEN MAGNOLIA, INC
Status Location Address State License Number Phone
INACTIVE

1 ROCKEFELLER DRIVE

PALM COAST, FL 32164

RR282811984 (Exp: 08/31/2025) 386-447-7007

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
FERNANDO MEZA SR
Status Location Address State License Number Phone
CANCEL

457 CHELSEA PLACE AV

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2022) 570-575-8139

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/09/2021 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION Termite cert is not affixed to the electrical panel. Remove bush from the front of the access panel at the condensor to allow for required 30 inch work space NEC 210.26. Remove pile of broken concrete and 2x4s at side door. Please have the energy calculations and approved drawings on site for final inspection The 12-2 wire in the garage attic needs to be removed from the top of the plywood and protected due to the space being used as storage area. NEC 220.23 (A) Plastic dust covers need to be removed form smoke detectors Hot water heater has not been wired The A/C unit calls for 45 max amp breaker a 50 amp is installed The Air Handler calls for a 60 amp breaker a 50 is also installed for the unit. 9/9/21 The hot water suppy to the kitcheb sink is not working. Please have energy calculations and approved drawings on site for the final inspection
BLD - BUILDING FINAL 09/09/2021 FINAL APPROVED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Termite cert is not affixed to the electrical panel. Remove bush from the front of the access panel at the condensor to allow for required 30 inch work space NEC 210.26. Remove pile of broken concrete and 2x4s at side door. Please have the energy calculations and approved drawings on site for final inspection The 12-2 wire in the garage attic needs to be removed from the top of the plywood and protected due to the space being used as storage area. NEC 220.23 (A) Plastic dust covers need to be removed form smoke detectors Hot water heater has not been wired The A/C unit calls for 45 max amp breaker a 50 amp is installed The Air Handler calls for a 60 amp breaker a 50 is also installed for the unit. 9/9/21 The hot water suppy to the kitcheb sink is not working. Please have energy calculations and approved drawings on site for the final inspection
BLD - BUILDING FINAL 09/07/2021 Disapproved -FEE REQUIRED JWALKER
Note: Termite cert is not affixed to the electrical panel. Remove bush from the front of the access panel at the condensor to allow for required 30 inch work space NEC 210.26. Remove pile of broken concrete and 2x4s at side door. Please have the energy calculations and approved drawings on site for final inspection The 12-2 wire in the garage attic needs to be removed from the top of the plywood and protected due to the space being used as storage area. NEC 220.23 (A) Plastic dust covers need to be removed form smoke detectors Hot water heater has not been wired The A/C unit calls for 45 max amp breaker a 50 amp is installed The Air Handler calls for a 60 amp breaker a 50 is also installed for the unit.
ROW - FINAL APRON (AFTER POUR) 09/07/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 09/07/2021 APPROVED KRUTH
U -UTILITY RESIDENTIAL FINAL 08/31/2021 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION sewer riser pipe not lowered for pep tank or with flush mount cap to be flush with grade(one by side of house with same situation)
U -UTILITY RESIDENTIAL FINAL 08/23/2021 Disapproved -FEE REQUIRED LFITZGERALD
Note: sewer riser pipe not lowered for pep tank or with flush mount cap to be flush with grade(one by side of house with same situation)
U-CROSS CONNECTION 08/23/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW FIELD SURVEY /GRADING CERTIFICATION 08/20/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
FINAL SURVEY (OFFICE USE ONLY) 08/20/2021 APPROVED GBERTOLA
ROW- PRE-APRON (PRE-POUR) 06/11/2021 APPROVED - AS NOTED RGROSS
Note: Faceboard was hit by a car. Be sure to reestablish the face board so that it is level and above the road edge. After that ...Ready to pour.
U - SEWER TIE IN 05/27/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 05/27/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 05/17/2021 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION Neutral wire needs to be phased in meter can. NEC 2014 200.6 5?17/21 Emailed FPL at 9:07 am
ELECTRIC - EARLY POWER 05/14/2021 Disapproved - NO FEE JMUNSON
Note: Neutral wire needs to be phased in meter can. NEC 2014 200.6
PEP TANK INSTALLATION REQUEST 04/30/2021 APPROVED CSTONE
PEP TANK INSTALLATION REQUEST 04/29/2021 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 04/05/2021 APPROVED JBODEN
INSULATION 04/05/2021 APPROVED - AS NOTED JBODEN
Note: seal penetration at pantry switch
ALL ROUGH 03/25/2021 APPROVED - AS NOTED MMESSER
Note: Need A/C platform finished before insulation inspection.
ROOF VALLEY & METAL 02/25/2021 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/23/2021 APPROVED - AS NOTED MMESSER
Note: Strap trusses A06, A07, A08 above garage entry door.
TIE BEAM / LINTEL 02/05/2021 APPROVED MMESSER
FOUND SURVEY APPROVED (OFFICE) 01/19/2021 APPROVED TBAKER
MONOLITHIC SLAB 01/08/2021 APPROVED MMESSER
PLUMBING 1ST ROUGH UNDERGROUND 12/28/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 12/16/2020 APPROVED - AS NOTED CSTONE
Note: Already installed 12/7/20

Review History

Department Status Date In Date Out
BADMIN HOLD 09/02/2021 09/02/2021
Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM NOC NEEDS TO BE RECORDED AND CERTIFIED
BADMIN COMPLETE 09/02/2021 09/02/2021
Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM
BADMIN HOLD 06/23/2021 06/23/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO BLOWER DOOR.PDF
BADMIN COMPLETE 06/23/2021 06/23/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/19/2021 01/19/2021
Note: Released By: TBAKER
ZON COMPLETE 01/19/2021 01/19/2021
Note: Released By: TDOAK
ZON COMPLETE 01/18/2021 01/19/2021
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 01/18/2021 01/19/2021
Note: Released By: TBAKER
ZON COMPLETE 09/15/2020 09/15/2020
Note: Released By: ELENS
MECH COMPLETE 09/15/2020 09/15/2020
Note: Released By: CPISCITELLI
ELEC COMPLETE 09/15/2020 09/15/2020
Note: Released By: JMUNSON
SW1 COMPLETE 09/04/2020 09/04/2020
Note: Released By: GBERTOLA
SWALE COMPLETE 09/03/2020 10/07/2020
Note: Released By: TBAKER
UTL COMPLETE 09/02/2020 09/08/2020
Note: Released By: LFITZGERALD
ZON HOLD 09/02/2020 09/03/2020
Note: Held By: ELENS Foundation plantings required for this corner lot: 6 on left side-facing right of way, 8 across the front, 4 on the interior side (in addition to the A/C screening). Please relabel the "office" on the floor plan. (Cannot indicate a commercial use.) Can be labeled as "den" or "study".
BLD COMPLETE 09/02/2020 09/09/2020
Note: Released By: JPI
CUSVC COMPLETE 09/02/2020 09/04/2020
Note: Released By: HHAND
ELEC HOLD 09/02/2020 09/03/2020
Note: Held By: JMUNSON Submit riser diagram
ENGIN1 COMPLETE 09/02/2020 09/03/2020
Note: Released By: TBAKER
LOCATE COMPLETE 09/02/2020 09/04/2020
Note: Released By: TCHURCHILL
MECH HOLD 09/02/2020 09/03/2020
Note: Held By: CPISCITELLI Orientation of Energy calcs does not match the site plan. Revise to match the site plan.
PLUM COMPLETE 09/02/2020 09/09/2020
Note: Released By: JPI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 09/10/2021
CONTRACTOR CHANGE ¤40.00 09/10/2021
CONTRACTOR CHANGE ¤40.00 09/10/2021
REINSPECTION RESIDENTIAL ¤40.00 09/10/2021
REINSPECTION FEE ¤40.00 09/10/2021
SW ENG - FIELD SURVEY INSPECT ¤20.00 09/10/2021
STORM WATER PERMIT FEES ¤80.00 09/29/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 09/29/2020
SEWER CREDIT (¤2,465.75) 09/29/2020
SEWER INSPECTION ¤25.00 09/29/2020
SEWER CAPITAL FACILITY ¤4,596.07 09/29/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 09/29/2020
NEW RESIDENTIAL INSPECTIONS ¤660.00 09/29/2020
SITE PLAN 20 ¤20.00 09/29/2020
SURCHARGE FS 533.721 ¤2.00 09/29/2020
SURCHARGE - FS 468.631 ¤2.00 09/29/2020
CONNECTION FEES ¤1,002.88 09/29/2020
METER - DEPOSIT ¤60.00 09/29/2020
WATER- TURN ON ¤25.00 09/29/2020
ADMIN FEE ¤20.00 09/29/2020
BUILDING DISCOUNT 100% (¤1,586.00) 09/29/2020
ELECTRIC FEE ¤258.00 09/29/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/29/2020
IMPACT FEE FIRE ¤223.38 09/29/2020
IMPACT FEE PARKS ¤849.24 09/29/2020
IMPACT FEE SCHOOL ¤3,600.00 09/29/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 09/29/2020
MECHANICAL FEE ¤258.00 09/29/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/29/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/29/2020
PLAN CHECK FEE ¤132.00 09/29/2020
PLUMBING FEE ¤258.00 09/29/2020
Fees Total Due: ¤0.00 Total Paid: ¤13,230.60