I want to search for...
Permit #2020090317
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00250-0370 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 00250 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 904-268-7730 |
| Location Address: 1 FRENORA LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/23/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES INC |
|
Address 5220 SHAD ROAD STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0370 |
| Contracted Stated Job Value: ¤120,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/27/2021 | FINAL APPROVED | BGREVE |
| ROW - STORMWATER FINAL | 05/27/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: extra sod and pallets need to be rremoved before the final sormwater | |||
| ROW - STORMWATER FINAL | 05/27/2021 | APPROVED | KRUTH |
| Note: THIS IS A REINSPECTION extra sod and pallets need to be rremoved before the final sormwater | |||
| U -UTILITY RESIDENTIAL FINAL | 05/27/2021 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/26/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 05/26/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 05/26/2021 | APPROVED | KRUTH |
| ELECTRIC - EARLY POWER | 05/04/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION No UFER ground NEC 2017 250.52 5/4/21 EMAILED FPL RELEASED POWER 3:40 | |||
| ELECTRIC - EARLY POWER | 05/03/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: No UFER ground NEC 2017 250.52 | |||
| ROW- PRE-APRON (PRE-POUR) | 04/20/2021 | APPROVED - AS NOTED | KRUTH |
| Note: At the time of inspection everything looks good It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete | |||
| U - SEWER TIE IN | 04/15/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS INSPECTION WAS DONE AND APPROVED ON 4/14/21 | |||
| U-CROSS CONNECTION | 04/15/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No IRR. No Cross CN. | |||
| INSULATION | 03/30/2021 | APPROVED | BGREVE |
| ALL ROUGH | 03/30/2021 | APPROVED | BGREVE |
| Note: THIS IS A REINSPECTION missing kickplates on plumbing dwv in hall bath and fridge water line at bottom plate E3904.3 securing and supporting and E3904.3.1 prohibited means of support. single gang box in master bedroom for switch is attached to another box by a 2x4 in between firestop ceiling behind master shower where dead space is between shower wall and garage wall | |||
| LATH/BRICK/ WATER BARRIER | 03/29/2021 | APPROVED | BGREVE |
| LATH/BRICK/ WATER BARRIER | 03/25/2021 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 03/24/2021 | Disapproved - NO FEE | BGREVE |
| Note: missing kickplates on plumbing dwv in hall bath and fridge water line at bottom plate E3904.3 securing and supporting and E3904.3.1 prohibited means of support. single gang box in master bedroom for switch is attached to another box by a 2x4 in between firestop ceiling behind master shower where dead space is between shower wall and garage wall | |||
| ROOF VALLEY & METAL | 03/23/2021 | APPROVED | BGREVE |
| Note: THIS IS A REINSPECTION ADDED ON 3/22/2021 12:01:54 PM | |||
| ROOF VALLEY & METAL | 03/22/2021 | CANCELLED BY APPLICANT | BGREVE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/10/2021 | APPROVED | JBODEN |
| FOUND SURVEY APPROVED (OFFICE) | 01/29/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/27/2021 | APPROVED | WMILLER |
| MONOLITHIC SLAB | 01/19/2021 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/15/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/15/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 11/05/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/28/2021 | 01/29/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: TDOAK | |||
| ZON | COMPLETE | 09/17/2020 | 09/18/2020 |
| Note: Released By: TDOAK | |||
| MECH | COMPLETE | 09/17/2020 | 09/18/2020 |
| Note: Released By: CPISCITELLI | |||
| UTL | COMPLETE | 09/17/2020 | 09/22/2020 |
| Note: Released By: LFITZGERALD | |||
| SW1 | COMPLETE | 09/17/2020 | 09/18/2020 |
| Note: Released By: CTROHA Stormwater review not requested on Permit Correction/Revision Form | |||
| ENGIN1 | COMPLETE | 09/17/2020 | 09/18/2020 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 09/10/2020 | 09/10/2020 |
| Note: Held By: CPISCITELLI Energy Calc can be at worst case, but heatload has to be site specific. The orientation of the heatload is not the correct direction. Revise to match the site plan | |||
| SW1 | COMPLETE | 09/10/2020 | 09/10/2020 |
| Note: Released By: GBERTOLA | |||
| SWALE | COMPLETE | 09/09/2020 | 10/14/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 09/08/2020 | 09/10/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/08/2020 | 09/11/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 09/08/2020 | 09/09/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/08/2020 | 09/09/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/08/2020 | 09/10/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 09/08/2020 | 09/09/2020 |
| Note: Held By: CPISCITELLI Orientation of Energy Calcs does not match the site plan. Revise to match the site plan. | |||
| PLUM | COMPLETE | 09/08/2020 | 09/10/2020 |
| Note: Released By: JPI | |||
| UTL | COMPLETE | 09/08/2020 | 09/11/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 09/08/2020 | 09/09/2020 |
| Note: Held By: AMOBLEY All windows and doors facing public right of way must have banding. Garage door missing banding. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/28/2021 |
| REINSPECTION FEE | ¤40.00 | 05/19/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 09/23/2020 |
| SITE PLAN 20 | ¤20.00 | 09/23/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/23/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/23/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/23/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 09/23/2020 |
| SEWER CREDIT | (¤1,147.00) | 09/23/2020 |
| SEWER INSPECTION | ¤25.00 | 09/23/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 09/23/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 09/23/2020 |
| METER - DEPOSIT | ¤60.00 | 09/23/2020 |
| WATER- TURN ON | ¤25.00 | 09/23/2020 |
| ADMIN FEE | ¤20.00 | 09/23/2020 |
| CONNECTION FEES | ¤1,002.88 | 09/23/2020 |
| BUILDING DISCOUNT 100% | (¤1,229.00) | 09/23/2020 |
| ELECTRIC FEE | ¤207.00 | 09/23/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/23/2020 |
| IMPACT FEE FIRE | ¤223.38 | 09/23/2020 |
| IMPACT FEE PARKS | ¤849.24 | 09/23/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/23/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 09/23/2020 |
| MECHANICAL FEE | ¤207.00 | 09/23/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/23/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/23/2020 |
| PLAN CHECK FEE | ¤98.00 | 09/23/2020 |
| PLUMBING FEE | ¤207.00 | 09/23/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,409.35 |