Permit #2020090352
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00380-0280 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 00380 |
| Subdivision: - |
| Job Phone: 904-268-7730 |
| Location Address: 115 SMITH TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/22/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES LLC |
|
Address 5220 SHAD RD #202 JACKSONVILLE, FL 32257 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤120,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/09/2021 | FINAL APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Exterior plaster needs to be installed at 2 areas where electrical outlets were missed. Termite sticker on the panel box has the wrong address and is not dated Isulation placard also has the wrong address. The front door hindge side is missing weather stripping. Missing blower door test results | |||
| BLD - BUILDING FINAL | 07/08/2021 | Disapproved - NO FEE | JWALKER |
| Note: Exterior plaster needs to be installed at 2 areas where electrical outlets were missed. Termite sticker on the panel box has the wrong address and is not dated Isulation placard also has the wrong address. The front door hindge side is missing weather stripping. Missing blower door test results | |||
| ROW - FINAL APRON (AFTER POUR) | 07/08/2021 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 07/08/2021 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 07/08/2021 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/14/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 06/14/2021 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 06/03/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Pep tank wire needs to be safed off 6/3/21 Emailed FPL at 12:40 pm | |||
| ELECTRIC - EARLY POWER | 06/02/2021 | Disapproved - NO FEE | JMUNSON |
| Note: Pep tank wire needs to be safed off | |||
| U - SEWER TIE IN | 05/25/2021 | APPROVED | JGIBSON |
| U-CROSS CONNECTION | 05/21/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/21/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| PEP TANK INSTALLATION REQUEST | 04/22/2021 | APPROVED | CSTONE |
| INSULATION | 04/22/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 04/19/2021 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 04/12/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 03/25/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/15/2021 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 02/10/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/01/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION 3 locations --marked in green paint on home. Vertical steel does not meet coverage requirements. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm). | |||
| TIE BEAM / LINTEL | 01/28/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 3 locations --marked in green paint on home. Vertical steel does not meet coverage requirements. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm). | |||
| MONOLITHIC SLAB | 01/14/2021 | APPROVED | TSTAUFFACHER |
| WATER METER INSTALLATION REQUEST | 01/13/2021 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 1/8/2021 9:32:31 AM Can not find workorder for this property please call customer service. | |||
| GRAVITY SEWER TEST | 01/11/2021 | APPROVED | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/11/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/08/2021 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/08/2021 | CANCELLED BY APPLICANT | WEB |
| WATER METER INSTALLATION REQUEST | 01/04/2021 | Disapproved - NO FEE | CSTONE |
| Note: Can not find workorder for this property please call customer service. | |||
| ROW - DRAINAGE | 11/23/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED A PIPE IN THE GROUND ASAP. SHOULD HAVE NEVER BEEN ALLOWED TO BEGIN WITHOUT A TEMPORARY PIPE INSTALLED TO ALLOW FOR DRAINAGE MINIMUM12 INCH. IN RAINY SEASON EVERY NEW CONSTRUCTION SITE SHOULD HAVE TEMPROARY DRAINAGE PUT IN PLACE BEFORE CONSTRUCTION STARTS 11/12/2020=WATER IS NOT MOVING STILL A LOT OF DIRT BLOCKING THE SWALE THEY NEED TO REMOVE THE DIRT IN FRONT OF THE PIPE ON THE RIGHT SIDE 11/16/2020 DIRT HAS BEEN REMOVED REINSPECTION ON 11/23/2020 | |||
| ROW - DRAINAGE | 11/16/2020 | Disapproved - NO FEE | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED A PIPE IN THE GROUND ASAP. SHOULD HAVE NEVER BEEN ALLOWED TO BEGIN WITHOUT A TEMPORARY PIPE INSTALLED TO ALLOW FOR DRAINAGE MINIMUM12 INCH. IN RAINY SEASON EVERY NEW CONSTRUCTION SITE SHOULD HAVE TEMPROARY DRAINAGE PUT IN PLACE BEFORE CONSTRUCTION STARTS 11/12/2020=WATER IS NOT MOVING STILL A LOT OF DIRT BLOCKING THE SWALE THEY NEED TO REMOVE THE DIRT IN FRONT OF THE PIPE ON THE RIGHT SIDE 11/16/2020 DIRT HAS BEEN REMOVED REINSPECTION ON 11/23/2020 | |||
| ROW - DRAINAGE | 11/12/2020 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION NEED A PIPE IN THE GROUND ASAP. SHOULD HAVE NEVER BEEN ALLOWED TO BEGIN WITHOUT A TEMPORARY PIPE INSTALLED TO ALLOW FOR DRAINAGE MINIMUM12 INCH. IN RAINY SEASON EVERY NEW CONSTRUCTION SITE SHOULD HAVE TEMPROARY DRAINAGE PUT IN PLACE BEFORE CONSTRUCTION STARTS 11/12/2020=WATER IS NOT MOVING STILL A LOT OF DIRT BLOCKING THE SWALE THEY NEED TO REMOVE THE DIRT IN FRONT OF THE PIPE ON THE RIGHT SIDE | |||
| ROW - DRAINAGE | 11/05/2020 | Disapproved - NO FEE | GBERTOLA |
| Note: NEED A PIPE IN THE GROUND ASAP. SHOULD HAVE NEVER BEEN ALLOWED TO BEGIN WITHOUT A TEMPORARY PIPE INSTALLED TO ALLOW FOR DRAINAGE MINIMUM12 INCH. IN RAINY SEASON EVERY NEW CONSTRUCTION SITE SHOULD HAVE TEMPROARY DRAINAGE PUT IN PLACE BEFORE CONSTRUCTION STARTS | |||
| WATER METER INSTALLATION REQUEST | 10/26/2020 | CANCELLED BY INSPECTOR | CSTONE |
| Note: No work order please contact customer service and pay fees. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/08/2021 | 02/10/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 02/08/2021 | 02/08/2021 |
| Note: Released By: TDOAK | |||
| SW1 | COMPLETE | 09/16/2020 | 09/18/2020 |
| Note: Released By: CTROHA | |||
| MECH | COMPLETE | 09/16/2020 | 09/16/2020 |
| Note: Released By: CPISCITELLI | |||
| ZON | COMPLETE | 09/16/2020 | 09/17/2020 |
| Note: Released By: ELENS | |||
| PLUM | COMPLETE | 09/16/2020 | 09/19/2020 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 09/16/2020 | 09/16/2020 |
| Note: Released By: TBAKER | |||
| UTL | COMPLETE | 09/16/2020 | 09/21/2020 |
| Note: Released By: LFITZGERALD | |||
| SWALE | COMPLETE | 09/15/2020 | 10/15/2020 |
| Note: Released By: TBAKER | |||
| PLENV | COMPLETE | 09/10/2020 | 09/11/2020 |
| Note: Released By: JMYERS No comments | |||
| UTL | COMPLETE | 09/09/2020 | 09/14/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 09/09/2020 | 09/10/2020 |
| Note: Held By: ELENS Please provide material of driveway and width of driveway at garage door on the site plan. Please provide material and width of the walkway on the site plan. | |||
| BLD | COMPLETE | 09/09/2020 | 09/15/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/09/2020 | 09/14/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 09/09/2020 | 09/09/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/09/2020 | 09/15/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/09/2020 | 09/10/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 09/09/2020 | 09/10/2020 |
| Note: Held By: CPISCITELLI 1. Orientation of heatload does not match the site plan. Revise to match the site plan. 2. Energy calc needs to be signed by the preparer. 3. Duct drawing needs to be signed by the AC contractor | |||
| PLUM | HOLD | 09/09/2020 | 09/15/2020 |
| Note: Held By: JPI 1. Provide sizing of all DWV piping. | |||
| SW1 | HOLD | 09/09/2020 | 09/09/2020 |
| Note: Held By: GBERTOLA PLEASE CHECK THE RESIDENTIAL SITE PLAN CHECK LIST. Sod elevations adjacent to the structure are 4'' below the FFE for block and 6'' for wood frame structures. Lot drainage features and patterns must be clearly depicted and include flow arrows. LABEL THE (AC) PADS All flatwork, i.e., sidewalks, walkways, air-conditioning (AC) pads, patios or other hardscaping must be shown. (K) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/22/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 09/22/2020 |
| SITE PLAN 20 | ¤20.00 | 09/22/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/22/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/22/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/22/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 09/22/2020 |
| SEWER INSPECTION | ¤25.00 | 09/22/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 09/22/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 09/22/2020 |
| METER - DEPOSIT | ¤60.00 | 09/22/2020 |
| WATER- TURN ON | ¤25.00 | 09/22/2020 |
| ADMIN FEE | ¤20.00 | 09/22/2020 |
| CONNECTION FEES | ¤1,002.88 | 09/22/2020 |
| BUILDING DISCOUNT 100% | (¤1,229.00) | 09/22/2020 |
| ELECTRIC FEE | ¤207.00 | 09/22/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/22/2020 |
| IMPACT FEE FIRE | ¤223.38 | 09/22/2020 |
| IMPACT FEE PARKS | ¤849.24 | 09/22/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/22/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 09/22/2020 |
| MECHANICAL FEE | ¤207.00 | 09/22/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/22/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/22/2020 |
| PLAN CHECK FEE | ¤98.00 | 09/22/2020 |
| PLUMBING FEE | ¤207.00 | 09/22/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,516.35 |