Permit #2020090352

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00380-0280
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 2475 sqft
Block: 00380
Subdivision: -
Job Phone: 904-268-7730
Location Address: 115 SMITH TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/22/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES LLC

Address

5220 SHAD RD #202

JACKSONVILLE, FL 32257

Lot: 0280
Contracted Stated Job Value: ¤120,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/09/2021 FINAL APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Exterior plaster needs to be installed at 2 areas where electrical outlets were missed. Termite sticker on the panel box has the wrong address and is not dated Isulation placard also has the wrong address. The front door hindge side is missing weather stripping. Missing blower door test results
BLD - BUILDING FINAL 07/08/2021 Disapproved - NO FEE JWALKER
Note: Exterior plaster needs to be installed at 2 areas where electrical outlets were missed. Termite sticker on the panel box has the wrong address and is not dated Isulation placard also has the wrong address. The front door hindge side is missing weather stripping. Missing blower door test results
ROW - FINAL APRON (AFTER POUR) 07/08/2021 APPROVED RGROSS
ROW - STORMWATER FINAL 07/08/2021 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 07/08/2021 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 06/14/2021 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 06/14/2021 APPROVED RGROSS
ELECTRIC - EARLY POWER 06/03/2021 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION Pep tank wire needs to be safed off 6/3/21 Emailed FPL at 12:40 pm
ELECTRIC - EARLY POWER 06/02/2021 Disapproved - NO FEE JMUNSON
Note: Pep tank wire needs to be safed off
U - SEWER TIE IN 05/25/2021 APPROVED JGIBSON
U-CROSS CONNECTION 05/21/2021 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 05/21/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
PEP TANK INSTALLATION REQUEST 04/22/2021 APPROVED CSTONE
INSULATION 04/22/2021 APPROVED TSTAUFFACHER
ALL ROUGH 04/19/2021 APPROVED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 04/12/2021 APPROVED TSTAUFFACHER
ROOF VALLEY & METAL 03/25/2021 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/15/2021 APPROVED WMILLER
FOUND SURVEY APPROVED (OFFICE) 02/10/2021 APPROVED TBAKER
TIE BEAM / LINTEL 02/01/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION 3 locations --marked in green paint on home. Vertical steel does not meet coverage requirements. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm).
TIE BEAM / LINTEL 01/28/2021 Disapproved - NO FEE TSTAUFFACHER
Note: 3 locations --marked in green paint on home. Vertical steel does not meet coverage requirements. R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm).
MONOLITHIC SLAB 01/14/2021 APPROVED TSTAUFFACHER
WATER METER INSTALLATION REQUEST 01/13/2021 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 1/8/2021 9:32:31 AM Can not find workorder for this property please call customer service.
GRAVITY SEWER TEST 01/11/2021 APPROVED JGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 01/11/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 01/08/2021 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 01/08/2021 CANCELLED BY APPLICANT WEB
WATER METER INSTALLATION REQUEST 01/04/2021 Disapproved - NO FEE CSTONE
Note: Can not find workorder for this property please call customer service.
ROW - DRAINAGE 11/23/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION NEED A PIPE IN THE GROUND ASAP. SHOULD HAVE NEVER BEEN ALLOWED TO BEGIN WITHOUT A TEMPORARY PIPE INSTALLED TO ALLOW FOR DRAINAGE MINIMUM12 INCH. IN RAINY SEASON EVERY NEW CONSTRUCTION SITE SHOULD HAVE TEMPROARY DRAINAGE PUT IN PLACE BEFORE CONSTRUCTION STARTS 11/12/2020=WATER IS NOT MOVING STILL A LOT OF DIRT BLOCKING THE SWALE THEY NEED TO REMOVE THE DIRT IN FRONT OF THE PIPE ON THE RIGHT SIDE 11/16/2020 DIRT HAS BEEN REMOVED REINSPECTION ON 11/23/2020
ROW - DRAINAGE 11/16/2020 Disapproved - NO FEE KRUTH
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED A PIPE IN THE GROUND ASAP. SHOULD HAVE NEVER BEEN ALLOWED TO BEGIN WITHOUT A TEMPORARY PIPE INSTALLED TO ALLOW FOR DRAINAGE MINIMUM12 INCH. IN RAINY SEASON EVERY NEW CONSTRUCTION SITE SHOULD HAVE TEMPROARY DRAINAGE PUT IN PLACE BEFORE CONSTRUCTION STARTS 11/12/2020=WATER IS NOT MOVING STILL A LOT OF DIRT BLOCKING THE SWALE THEY NEED TO REMOVE THE DIRT IN FRONT OF THE PIPE ON THE RIGHT SIDE 11/16/2020 DIRT HAS BEEN REMOVED REINSPECTION ON 11/23/2020
ROW - DRAINAGE 11/12/2020 Disapproved -FEE REQUIRED GBERTOLA
Note: THIS IS A REINSPECTION NEED A PIPE IN THE GROUND ASAP. SHOULD HAVE NEVER BEEN ALLOWED TO BEGIN WITHOUT A TEMPORARY PIPE INSTALLED TO ALLOW FOR DRAINAGE MINIMUM12 INCH. IN RAINY SEASON EVERY NEW CONSTRUCTION SITE SHOULD HAVE TEMPROARY DRAINAGE PUT IN PLACE BEFORE CONSTRUCTION STARTS 11/12/2020=WATER IS NOT MOVING STILL A LOT OF DIRT BLOCKING THE SWALE THEY NEED TO REMOVE THE DIRT IN FRONT OF THE PIPE ON THE RIGHT SIDE
ROW - DRAINAGE 11/05/2020 Disapproved - NO FEE GBERTOLA
Note: NEED A PIPE IN THE GROUND ASAP. SHOULD HAVE NEVER BEEN ALLOWED TO BEGIN WITHOUT A TEMPORARY PIPE INSTALLED TO ALLOW FOR DRAINAGE MINIMUM12 INCH. IN RAINY SEASON EVERY NEW CONSTRUCTION SITE SHOULD HAVE TEMPROARY DRAINAGE PUT IN PLACE BEFORE CONSTRUCTION STARTS
WATER METER INSTALLATION REQUEST 10/26/2020 CANCELLED BY INSPECTOR CSTONE
Note: No work order please contact customer service and pay fees.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/08/2021 02/10/2021
Note: Released By: TBAKER
ZON COMPLETE 02/08/2021 02/08/2021
Note: Released By: TDOAK
SW1 COMPLETE 09/16/2020 09/18/2020
Note: Released By: CTROHA
MECH COMPLETE 09/16/2020 09/16/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 09/16/2020 09/17/2020
Note: Released By: ELENS
PLUM COMPLETE 09/16/2020 09/19/2020
Note: Released By: JPI
ENGIN1 COMPLETE 09/16/2020 09/16/2020
Note: Released By: TBAKER
UTL COMPLETE 09/16/2020 09/21/2020
Note: Released By: LFITZGERALD
SWALE COMPLETE 09/15/2020 10/15/2020
Note: Released By: TBAKER
PLENV COMPLETE 09/10/2020 09/11/2020
Note: Released By: JMYERS No comments
UTL COMPLETE 09/09/2020 09/14/2020
Note: Released By: LFITZGERALD
ZON HOLD 09/09/2020 09/10/2020
Note: Held By: ELENS Please provide material of driveway and width of driveway at garage door on the site plan. Please provide material and width of the walkway on the site plan.
BLD COMPLETE 09/09/2020 09/15/2020
Note: Released By: JPI
CUSVC COMPLETE 09/09/2020 09/14/2020
Note: Released By: HHAND
ELEC COMPLETE 09/09/2020 09/09/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 09/09/2020 09/15/2020
Note: Released By: TBAKER
LOCATE COMPLETE 09/09/2020 09/10/2020
Note: Released By: CSTONE
MECH HOLD 09/09/2020 09/10/2020
Note: Held By: CPISCITELLI 1. Orientation of heatload does not match the site plan. Revise to match the site plan. 2. Energy calc needs to be signed by the preparer. 3. Duct drawing needs to be signed by the AC contractor
PLUM HOLD 09/09/2020 09/15/2020
Note: Held By: JPI 1. Provide sizing of all DWV piping.
SW1 HOLD 09/09/2020 09/09/2020
Note: Held By: GBERTOLA PLEASE CHECK THE RESIDENTIAL SITE PLAN CHECK LIST. Sod elevations adjacent to the structure are 4'' below the FFE for block and 6'' for wood frame structures. Lot drainage features and patterns must be clearly depicted and include flow arrows. LABEL THE (AC) PADS All flatwork, i.e., sidewalks, walkways, air-conditioning (AC) pads, patios or other hardscaping must be shown. (K)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/22/2021
NEW RESIDENTIAL INSPECTIONS ¤490.00 09/22/2020
SITE PLAN 20 ¤20.00 09/22/2020
SURCHARGE FS 533.721 ¤2.00 09/22/2020
SURCHARGE - FS 468.631 ¤2.00 09/22/2020
STORM WATER PERMIT FEES ¤80.00 09/22/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 09/22/2020
SEWER INSPECTION ¤25.00 09/22/2020
SEWER CAPITAL FACILITY ¤4,596.07 09/22/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 09/22/2020
METER - DEPOSIT ¤60.00 09/22/2020
WATER- TURN ON ¤25.00 09/22/2020
ADMIN FEE ¤20.00 09/22/2020
CONNECTION FEES ¤1,002.88 09/22/2020
BUILDING DISCOUNT 100% (¤1,229.00) 09/22/2020
ELECTRIC FEE ¤207.00 09/22/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/22/2020
IMPACT FEE FIRE ¤223.38 09/22/2020
IMPACT FEE PARKS ¤849.24 09/22/2020
IMPACT FEE SCHOOL ¤3,600.00 09/22/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 09/22/2020
MECHANICAL FEE ¤207.00 09/22/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/22/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/22/2020
PLAN CHECK FEE ¤98.00 09/22/2020
PLUMBING FEE ¤207.00 09/22/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,516.35