I want to search for...
Permit #2020090401
Permit Details
Status: COED
| Parcel Id: 07-11-31-7017-00040-0480 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 00040 |
| Subdivision: 2129 - SECTION 17-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 13 BOLLING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/21/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES, LLC |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL 32257 |
|
Address STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0480 |
| Contracted Stated Job Value: ¤120,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 03/29/2021 | APPROVED - AS NOTED | JHARDING |
| Note: Approved no cross connection. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/26/2021 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 03/26/2021 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 03/26/2021 | FINAL APPROVED | JHARDING |
| BLD - BUILDING FINAL | 03/26/2021 | FINAL APPROVED | FWILLIS |
| FINAL SURVEY (OFFICE USE ONLY) | 03/25/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/25/2021 | APPROVED - AS NOTED | RGROSS |
| Note: Exposed cable wire at the post on the right front side in the ROW needs to be buttoned up and enclosed before the final Row can be approved. | |||
| ELECTRIC - EARLY POWER | 03/04/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 8:30 | |||
| U - SEWER TIE IN | 03/01/2021 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 02/26/2021 | APPROVED - AS NOTED | KRUTH |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. pipe is good | |||
| INSULATION | 01/26/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Left side of house (facing) sprayed with different foam, not Fire Stop. Remove and Re-Foam with code approved fire Stop. | |||
| INSULATION | 01/25/2021 | Disapproved - NO FEE | FWILLIS |
| Note: Left side of house (facing) sprayed with different foam, not Fire Stop. Remove and Re-Foam with code approved fire Stop. | |||
| ALL ROUGH | 01/21/2021 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 01/13/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/06/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 01/06/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/04/2021 | CANCELLED BY APPLICANT | FWILLIS |
| ROW - DRAINAGE | 12/28/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION See previoulsy created Project Status Notes. 10/15/20 - DRAINAGE NOT OPEN YET. PHOTO ATTACHED. NEXT INSPECTION 10/22 20. 12/22/20 - DRAINAGE IS SEMI OPEN. NEXT INSPECTION WILL BE ON 11/5/20 12/2/20 - DRAINAGE STILL OPEN. SILT FENCE IN REAR ALSO CHECKED AND IS STABLE. NEXT INSPECTION 12/10/20. 11/5/2020-DRAINAGE IS GOOD NEXT INSPECTION 11/12/2020 11/24/2020= LEFT SIDE PIPE NEED TO BE OPEN IS BURIED 90% NEXT INSPECTION 12/2/2020 12/10/2020= PIPE IS OPEN NOW =NEXT INSPECTION =12/23/2020 12/28/20 - GETTING CLOSE TO THE FINAL GRADE. RAINY SEASON IS PASSED. THEREFORE BEING APPROVED AS NOTED. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/11/2020 | APPROVED | TBAKER |
| ROW - DRAINAGE | 12/10/2020 | PARTIALLY APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION See previoulsy created Project Status Notes. 10/15/20 - DRAINAGE NOT OPEN YET. PHOTO ATTACHED. NEXT INSPECTION 10/22 20. 12/22/20 - DRAINAGE IS SEMI OPEN. NEXT INSPECTION WILL BE ON 11/5/20 12/2/20 - DRAINAGE STILL OPEN. SILT FENCE IN REAR ALSO CHECKED AND IS STABLE. NEXT INSPECTION 12/10/20. 11/5/2020-DRAINAGE IS GOOD NEXT INSPECTION 11/12/2020 11/24/2020= LEFT SIDE PIPE NEED TO BE OPEN IS BURIED 90% NEXT INSPECTION 12/2/2020 12/10/2020= PIPE IS OPEN NOW =NEXT INSPECTION =12/23/2020 | |||
| TIE BEAM / LINTEL | 12/03/2020 | APPROVED | TSTAUFFACHER |
| ROW - DRAINAGE | 12/02/2020 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION See previoulsy created Project Status Notes. 10/15/20 - DRAINAGE NOT OPEN YET. PHOTO ATTACHED. NEXT INSPECTION 10/22 20. 12/22/20 - DRAINAGE IS SEMI OPEN. NEXT INSPECTION WILL BE ON 11/5/20 12/2/20 - DRAINAGE STILL OPEN. SILT FENCE IN REAR ALSO CHECKED AND IS STABLE. NEXT INSPECTION 12/10/20. 11/5/2020-DRAINAGE IS GOOD NEXT INSPECTION 11/12/2020 11/24/2020= LEFT SIDE PIPE NEED TO BE OPEN IS BURIED 90% NEXT INSPECTION 12/2/2020 | |||
| ROW - DRAINAGE | 11/24/2020 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION See previoulsy created Project Status Notes. 10/15/20 - DRAINAGE NOT OPEN YET. PHOTO ATTACHED. NEXT INSPECTION 10/22 20. 12/22/20 - DRAINAGE IS SEMI OPEN. NEXT INSPECTION WILL BE ON 11/5/20 11/5/2020-DRAINAGE IS GOOD NEXT INSPECTION 11/12/2020 11/24/2020= LEFT SIDE PIPE NEED TO BE OPEN IS BURIED 90% NEXT INSPECTION 12/2/2020 | |||
| MONOLITHIC SLAB | 11/20/2020 | APPROVED | JBODEN |
| MONOLITHIC SLAB | 11/12/2020 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/09/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 11/09/2020 | APPROVED | JGIBSON |
| ROW - DRAINAGE | 11/05/2020 | PARTIALLY APPROVED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION See previoulsy created Project Status Notes. 10/15/20 - DRAINAGE NOT OPEN YET. PHOTO ATTACHED. NEXT INSPECTION 10/22 20. 12/22/20 - DRAINAGE IS SEMI OPEN. NEXT INSPECTION WILL BE ON 11/5/20 11/5/2020-DRAINAGE IS GOOD NEXT INSPECTION 11/12/2020 | |||
| ROW - DRAINAGE | 10/22/2020 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION See previoulsy created Project Status Notes. 10/15/20 - DRAINAGE NOT OPEN YET. PHOTO ATTACHED. NEXT INSPECTION 10/22 20. 12/22/20 - DRAINAGE IS SEMI OPEN. NEXT INSPECTION WILL BE ON 11/5/20 | |||
| ROW - DRAINAGE | 10/15/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: See previoulsy created Project Status Notes. 10/15/20 - DRAINAGE NOT OPEN YET. PHOTO ATTACHED. NEXT INSPECTION 10/22 20. | |||
| ROW- PROJECT STATUS | 10/08/2020 | APPROVED - AS NOTED | RGROSS |
| Note: 13 - 15 Bolling Lane Construction Description There is construction at 13 - 15 Bolling Lane, Palm Coast. For the past week there has been PILES of dirt, mud, debris in the roadway. No one can drive on one side of the road due to the huge piles of mud in the road. Children cannot play and two elderly people in wheelchairs cant even leave their homes because the dirt reaches all the way across the road. This is insane and a huge problem for the neighborhood. 10/8/20 - Road has been cleaned. Temporary culvert is on site to be installed. Silt fence has been installed on both sides of construction. This issue will be monitored via a drainage inspection created by the inspector for this permit. Next inspection will be scheduled for 10/15/20. | |||
| WATER METER INSTALLATION REQUEST | 10/02/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/10/2020 | 12/11/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 12/10/2020 | 12/10/2020 |
| Note: Released By: TDOAK | |||
| MECH | COMPLETE | 09/16/2020 | 09/16/2020 |
| Note: Released By: CPISCITELLI | |||
| SWALE | COMPLETE | 09/14/2020 | 10/19/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 09/10/2020 | 09/10/2020 |
| Note: Released By: GBERTOLA | |||
| UTL | COMPLETE | 09/09/2020 | 09/14/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 09/09/2020 | 09/10/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 09/09/2020 | 09/15/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/09/2020 | 09/11/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 09/09/2020 | 09/10/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/09/2020 | 09/14/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/09/2020 | 09/10/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 09/09/2020 | 09/10/2020 |
| Note: Held By: CPISCITELLI 1. Orientation of heatload does not match the site plan. Energy calc can be at worst case, but heatload needs to be site specific. Revise to match the site plan. 2. Duct layout needs to be signed by the AC contractor | |||
| PLUM | COMPLETE | 09/09/2020 | 09/15/2020 |
| Note: Released By: JPI |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/25/2021 |
| REINSPECTION FEE | ¤40.00 | 03/25/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 09/21/2020 |
| SITE PLAN 20 | ¤20.00 | 09/21/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/21/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/21/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/21/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 09/21/2020 |
| SEWER CREDIT | (¤1,147.00) | 09/21/2020 |
| SEWER INSPECTION | ¤25.00 | 09/21/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 09/21/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 09/21/2020 |
| METER - DEPOSIT | ¤60.00 | 09/21/2020 |
| WATER- TURN ON | ¤25.00 | 09/21/2020 |
| ADMIN FEE | ¤20.00 | 09/21/2020 |
| CONNECTION FEES | ¤1,002.88 | 09/21/2020 |
| BUILDING DISCOUNT 100% | (¤1,229.00) | 09/21/2020 |
| ELECTRIC FEE | ¤207.00 | 09/21/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/21/2020 |
| IMPACT FEE FIRE | ¤223.38 | 09/21/2020 |
| IMPACT FEE PARKS | ¤849.24 | 09/21/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/21/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 09/21/2020 |
| MECHANICAL FEE | ¤207.00 | 09/21/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/21/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/21/2020 |
| PLAN CHECK FEE | ¤98.00 | 09/21/2020 |
| PLUMBING FEE | ¤207.00 | 09/21/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,409.35 |