I want to search for...

Permit #2020090628

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7022-00080-0450
Block: 00080
Subdivision: 2217 - SECTION 22-WYNNFIELD
Job Phone: 386-237-0328
Location Address: 5 WESTBROOK LN
Type: DR - DRIVEWAY
Issue Date: 10/05/2020
NOC: RECORDED
Applicant name: JAMES JOSEPH ALBANO
Owner: CLEARY ANN S LIFE ESTATE

Address

5 WESTBROOK LANE

PALM COAST, FL 32164

Lot: 0450
Contracted Stated Job Value: ¤7,500.00
Job Description: Replace driveway with new concrete
Type: CN

Contractor

ALBANO DESIGNS STUDIOS, INC
Status Location Address State License Number Phone
ACTIVE

82 LEE DR

PALM COAST, FL 32137

CBC050078 (Exp: 08/31/2026) 386-237-0328

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 10/27/2020 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 10/23/2020 APPROVED RGROSS
ROW - FINAL INSPECTION 10/21/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 10/20/2020 APPROVED GBERTOLA
Note: THIS IS A REINSPECTION IT'S A TRIPPING HAZARD THE LIP LEFT BY THE ROAD YOU NEED TO CUT THE ROAD AND USE HOT PATCH ASPHALT TO COVER THE LIP ON THE END OF THE DRIVEWAY BY THE ROAD 10/20/2020 CORRECTION MADE IT
ROW - FINAL APRON (AFTER POUR) 10/15/2020 Disapproved -FEE REQUIRED GBERTOLA
Note: IT'S A TRIPPING HAZARD THE LIP LEFT BY THE ROAD YOU NEED TO CUT THE ROAD AND USE HOT PATCH ASPHALT TO COVER THE LIP ON THE END OF THE DRIVEWAY BY THE ROAD
ROW- PRE-APRON (PRE-POUR) 10/08/2020 APPROVED - AS NOTED GBERTOLA
Note: PLEASE IF A RAIN BEFORE POUR CONCRETE CHECK THE PIPE ELEVATION AGAIN MAKE SURE NO CONCRETE GOING TO THE SWALE OR THE ROAD

Review History

Department Status Date In Date Out
ZON COMPLETE 09/24/2020 09/25/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 09/24/2020 09/25/2020
Note: Released By: TBAKER
UTL COMPLETE 09/24/2020 09/28/2020
Note: Released By: LFITZGERALD
SW1 COMPLETE 09/24/2020 09/30/2020
Note: Released By: CTROHA
ZON HOLD 09/22/2020 09/23/2020
Note: Held By: ELENS Repeat comment: ...walkways...provide the width..(of the new walkway).
UTL COMPLETE 09/22/2020 09/23/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 09/22/2020 09/22/2020
Note: Released By: TBAKER
ENGIN1 COMPLETE 09/15/2020 09/17/2020
Note: Released By: TBAKER
UTL COMPLETE 09/15/2020 09/21/2020
Note: Released By: LFITZGERALD
ZON HOLD 09/15/2020 09/16/2020
Note: Held By: ELENS Please provide setback from the bottom of the circular (arc) portion to the front property line. (It must be at least 5' to not encroach in the easement.) Please provide width of the circular portion of the driveway at the widest point. (Must not exceed 18') Please clarify if the walkways will be replaced as is and if so, correct the site plan and provide the width of each. If the walkways are being filled in, as demonstrated on the attached site plan(s), this appears to certainly exceed the 18' maximum width of the driveway. You can separate the proposed "patio" and provide the setback to the front property line. (Min. 25')

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/26/2020
SITE PLAN 20 ¤20.00 10/05/2020
SURCHARGE FS 533.721 ¤2.00 10/05/2020
SURCHARGE - FS 468.631 ¤2.00 10/05/2020
STORM WATER PERMIT FEES ¤40.00 10/05/2020
ADMIN FEE ¤20.00 10/05/2020
BUILDING DISCOUNT 100% (¤20.00) 10/05/2020
Fees Total Due: ¤0.00 Total Paid: ¤104.00