Permit #2020090682
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00750-0240 |
| CONDITIONED SPACE: 1736 sqft |
| GARAGE: 785 sqft |
| OPENED PORCH (WITH ROOF) : 44 sqft |
| OPENED PORCH (WITH ROOF) : 240 sqft |
| Total Square Footage: 2805 sqft |
| Block: 00750 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 386-263-8272 |
| Location Address: 42 PINE GROVE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/11/2020 |
| NOC: RECORDED |
| Applicant name: ROY CHARLES WALDHAUER |
| Owner: BY THE SHORE INC |
|
Address SUITE 103 BUNNELL, FL 32110 |
|
Address 1600 N STATE STR BUNNELL, FL 32110 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤225,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BY THE SHORE INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1600 N STATE STREET # 102 , |
CRC1327300 (Exp: 08/31/2026) | 386-263-8272 | 386-263-8289 |
Sub Contractors
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/30/2021 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Garage Branch circuts need to be on a 20amp overcurrent protection device. Wiring that circut need to be 12-2 conduit. NEC 210.11 The spary foam insulation separating the garage attic and living space attic need to have a fire barrier installed R302.6 R316. Permit was pulled 2020 allowing the existing 15 amp circut. | |||
| BLD - BUILDING FINAL | 07/29/2021 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A 2020 OLD PERMIT PER ROBERT MARTIN The spary foam insulation separating the garage attic and living space attic need to have a fire barrier installed R302.6 R316. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/29/2021 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| ROW - STORMWATER FINAL | 07/28/2021 | APPROVED | GBERTOLA |
| Note: 07/08/2021= There is alot of dirt that has washed down into the swale and in the neighbors pipe that will need to be removed and resod the swale 07/08/2021=BUILDER NEED TO CLEAN THE CULVERT PIPE ON HOME OWNER 44 PINE GROVE DR AND REMOVE THE DIRT ON THE LEFT SIDE OF THE SWALE AND SODDED 07/28/2021=correction were made AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U -UTILITY RESIDENTIAL FINAL | 07/28/2021 | CANCELLED BY APPLICANT | LFITZGERALD |
| U-CROSS CONNECTION | 07/28/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 07/28/2021 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/22/2021 | APPROVED | GBERTOLA |
| FINAL SURVEY (OFFICE USE ONLY) | 07/22/2021 | APPROVED | GBERTOLA |
| ROW - DRAINAGE | 07/08/2021 | APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION There is alot of dirt that has washed down into the swale and in the neighbors pipe that will need to be removed and resod the swale add silt fence in the swale and onto the property by 3 feet to stop the erosion from leaving the property asap 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE 07/08/2021=BUILDER NEED TO CLEAN THE CULVERT PIPE ON HOME OWNER 44 PINE GROVE DR AND REMOVE THE DIRT ON THE LEFT SIDE OF THE SWALE AND SODDED | |||
| ROW - DRAINAGE | 07/06/2021 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: THIS IS A REINSPECTION There is alot of dirt that has washed down into the swale and in the neighbors pipe that will need to be removed and resod the swale add silt fence in the swale and onto the property by 3 feet to stop the erosion from leaving the property asap 07/06/2021=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE | |||
| GRAVITY SEWER TEST | 07/06/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 07/06/2021 | APPROVED | JGIBSON |
| ROW - DRAINAGE | 06/30/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: There is alot of dirt that has washed down into the swale and in the neighbors pipe that will need to be removed and resod the swale add silt fence in the swale and onto the property by 3 feet to stop the erosion from leaving the property asap | |||
| ELECTRIC - EARLY POWER | 06/23/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 8:50 | |||
| ROW- PRE-APRON (PRE-POUR) | 06/10/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Not 4 inches thick at the along the garage entrance, porch entrance and part of the side walk. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/09/2021 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Not 4 inches thick along the garage entrance, porch entrance, and part of the side walk. Note that the Culvert Elevation was good and within tolerance at the time of the Inspection. | |||
| PEP TANK INSTALLATION REQUEST | 06/03/2021 | APPROVED | CSTONE |
| ROW - DRAINAGE | 05/20/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: CORRECTION WERE MADE | |||
| INSULATION | 04/28/2021 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION Electric panel in garage needs to be fire foamed/ fire blocked. | |||
| INSULATION | 04/27/2021 | Disapproved - NO FEE | MMESSER |
| Note: Electric panel in garage needs to be fire foamed/ fire blocked. | |||
| ROW - DRAINAGE | 04/21/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION NEED TO OPEN THE RIGHT SIDE PIPE , REMOVE THE SAND ONTHE RIGHT SIDE AND THE CONCRETE ON THE LEFT SIDE BE BACK ON 04/21/2021 CORRECTION WERE MADE | |||
| ROW - DRAINAGE | 04/19/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: NEED TO OPEN THE RIGHT SIDE PIPE BE BACK ON 04/21/2021 | |||
| ALL ROUGH | 04/08/2021 | APPROVED | MMESSER |
| ALL ROUGH | 04/06/2021 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 04/05/2021 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 03/22/2021 | APPROVED | WMILLER |
| PROJECT STATUS (OFFICE USE) | 03/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: 03/04/2021= CORRECTION WERE MADE BE BACK ON =03/18/2021 03/19/2021= SWALE IS OPEN BE BACK ON 04/19/2021 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/09/2021 | APPROVED | MMESSER |
| ROW - DRAINAGE | 03/04/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: PLEASE CLEAN THE PIPE BOTH SIDE I BE BACK ON 2/17/2021 BE BACK ON 03/04/2021 03/04/2021= CORRECTION WERE MADE BE BACK ON =03/18/2021 | |||
| ROW - DRAINAGE | 02/17/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION PLEASE CLEAN THE PIPE BOTH SIDE I BE BACK ON 2/17/2021 BE BACK ON 03/04/2021 | |||
| ROW - DRAINAGE | 02/10/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: PLEASE CLEAN THE PIPE BOTH SIDE I BE BACK ON 2/17/2021 | |||
| TIE BEAM / LINTEL | 02/02/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 01/27/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/05/2021 | APPROVED | TCHURCHILL |
| Note: THIS IS A REINSPECTION need compaction report | |||
| WATER METER INSTALLATION REQUEST | 01/05/2021 | APPROVED | CSTONE |
| MONOLITHIC SLAB | 12/28/2020 | Disapproved - NO FEE | MMESSER |
| Note: need compaction report | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/17/2020 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/26/2021 | 01/27/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/26/2021 | 01/26/2021 |
| Note: Released By: ELENS | |||
| ZON | COMPLETE | 10/27/2020 | 10/28/2020 |
| Note: Released By: AMOBLEY | |||
| MECH | COMPLETE | 10/21/2020 | 10/21/2020 |
| Note: Released By: CPISCITELLI | |||
| ZON | HOLD | 10/21/2020 | 10/22/2020 |
| Note: Held By: AMOBLEY Area calculations on floor plan aren't adding up to the total you have When calculated it comes out to 2805...you have 3805 | |||
| ELEC | COMPLETE | 10/09/2020 | 10/09/2020 |
| Note: Released By: JMUNSON | |||
| MECH | HOLD | 10/09/2020 | 10/09/2020 |
| Note: Held By: CPISCITELLI 1. Energy calcs says R20 insulation on roof deck with non vented attic. Plans show R30 with vented attic. Revise to match. 2. Energy calcs say R5 on block walls. Plans show R4.1. Revise to match (Second Request) | |||
| ZON | HOLD | 10/09/2020 | 10/09/2020 |
| Note: Held By: AMOBLEY Repeat comment Area calculations on floor plan aren't adding up to the total you have | |||
| BLD | COMPLETE | 10/09/2020 | 10/13/2020 |
| Note: Released By: JPI | |||
| PLUM | COMPLETE | 10/09/2020 | 10/13/2020 |
| Note: Released By: JPI | |||
| BLD | HOLD | 09/16/2020 | 09/20/2020 |
| Note: Held By: JPI 1. Provide section cut through dutch gable roof illustrating all structural construction details with all bracing, and attachments. 2. Product approval spec sheet is missing listing for siding (gable end). | |||
| CUSVC | COMPLETE | 09/16/2020 | 09/22/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 09/16/2020 | 09/17/2020 |
| Note: Held By: JMUNSON 1. Electric load calculations square footage does not match the square footage of the house. 2. Need combo smokes outside of all bedrooms. FBC 2017 314.3 and 315.1 3. Need service outlet near AC unit NEC 2014 210.63 | |||
| ENGIN1 | COMPLETE | 09/16/2020 | 09/16/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/16/2020 | 09/18/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 09/16/2020 | 09/17/2020 |
| Note: Held By: CPISCITELLI 1. Energy Calcs and EPL card need to be signed by the builder 2. Provide heatload calculation 3. Energy calcs says R20 insulation on roof deck with non vented attic. Plans show R30 with vented attic. Revise to match. 4. Energy calcs say R5 on block walls. Plans show R4.1. Revise to match | |||
| PLUM | HOLD | 09/16/2020 | 09/20/2020 |
| Note: Held By: JPI 1. Isometric does not illustrate any DWV for washing machine. 2. Isometric does not call out pipe size for sink drain and hall bath drain. | |||
| SW1 | COMPLETE | 09/16/2020 | 09/17/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 09/16/2020 | 09/21/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 09/16/2020 | 09/18/2020 |
| Note: Held By: AMOBLEY Area calculations on floor plan aren't adding up to the total you have | |||
| SWALE | COMPLETE | 09/16/2020 | 10/23/2020 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤40.00 | 07/29/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 07/29/2021 |
| STORMWATER REINSPECTION FEE | ¤40.00 | 07/29/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 11/11/2020 |
| SEWER CREDIT | (¤1,147.00) | 11/11/2020 |
| SEWER INSPECTION | ¤25.00 | 11/11/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 11/11/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 11/11/2020 |
| METER - DEPOSIT | ¤60.00 | 11/11/2020 |
| WATER- TURN ON | ¤25.00 | 11/11/2020 |
| ADMIN FEE | ¤20.00 | 11/11/2020 |
| CONNECTION FEES | ¤1,002.88 | 11/11/2020 |
| BUILDING DISCOUNT 100% | (¤1,195.40) | 11/11/2020 |
| ELECTRIC FEE | ¤202.20 | 11/11/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 11/11/2020 |
| IMPACT FEE FIRE | ¤223.38 | 11/11/2020 |
| IMPACT FEE PARKS | ¤849.24 | 11/11/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/11/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 11/11/2020 |
| MECHANICAL FEE | ¤202.20 | 11/11/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/11/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 11/11/2020 |
| PLAN CHECK FEE | ¤94.80 | 11/11/2020 |
| PLUMBING FEE | ¤202.20 | 11/11/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤474.00 | 11/11/2020 |
| SITE PLAN 20 | ¤20.00 | 11/11/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/11/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/11/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/11/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,449.35 |