I want to search for...
Permit #2020090697
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01190-0070 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 01190 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 904-268-7730 |
| Location Address: 10 LONDON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/22/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES LLC |
|
Address 5220 SHAD ROAD STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤120,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/26/2021 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION As per your request. 4-04-23-21... 1. HOSE BIBB, VACUUM BREAKER 2902.4.3 , REQUIRED 2. FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) (anular space around ceiling penetrations in laundry room) 3. ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH 4. no power in mastersuite including all closets and bathroom 4/26/21 - Items corrected. | |||
| BLD - BUILDING FINAL | 04/23/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION As per your request. 4-04-23-21... 1. HOSE BIBB, VACUUM BREAKER 2902.4.3 , REQUIRED 2. FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) (anular space around ceiling penetrations in laundry room) 3. ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH 4. no power in mastersuite including all closets and bathroom | |||
| U -UTILITY RESIDENTIAL FINAL | 04/22/2021 | FINAL APPROVED | DHANEY |
| Note: THIS IS A REINSPECTION 4/20/21 Pep tank electric panel not CN. Pep panel and tank completed , pass - 4/22/21 | |||
| BLD - BUILDING FINAL | 04/22/2021 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION As per your request. | |||
| BLD - BUILDING FINAL | 04/20/2021 | CANCELLED BY APPLICANT | FWILLIS |
| Note: As per your request. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/20/2021 | CANCELLED BY APPLICANT | DHANEY |
| Note: 4/20/21 Pep tank electric panel not CN. | |||
| ROW - STORMWATER FINAL | 04/14/2021 | APPROVED - AS NOTED | KRUTH |
| Note: The edge of the lot needs seed and straw or pine needles for erosion controle at the vacant lot the porta john needs to be removed or put on the driveway for final stormwater inspection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/08/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 04/08/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 04/08/2021 | APPROVED | KRUTH |
| ELECTRIC - EARLY POWER | 03/24/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:50 am | |||
| U-CROSS CONNECTION | 03/18/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No IRR. No Cross CN | |||
| ROW- PRE-APRON (PRE-POUR) | 03/17/2021 | APPROVED - AS NOTED | KRUTH |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete | |||
| U - SEWER TIE IN | 03/08/2021 | APPROVED | JGIBSON |
| INSULATION | 02/22/2021 | APPROVED | FWILLIS |
| INSULATION | 02/16/2021 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 02/11/2021 | APPROVED | FWILLIS |
| PEP TANK INSTALLATION REQUEST | 02/11/2021 | APPROVED | CSTONE |
| ALL ROUGH | 02/10/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 02/09/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/02/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 01/05/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/09/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 12/01/2020 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/25/2020 | APPROVED | FWILLIS |
| GRAVITY SEWER TEST | 11/25/2020 | APPROVED | FWILLIS |
| WATER METER INSTALLATION REQUEST | 10/16/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 04/26/2021 | 04/26/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM ONLY RENAME TO BLOWER DOOR.PDF | |||
| BADMIN | COMPLETE | 04/26/2021 | 04/26/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/05/2021 | 01/05/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/05/2021 | 01/05/2021 |
| Note: Released By: TDOAK | |||
| MECH | COMPLETE | 09/21/2020 | 09/21/2020 |
| Note: Released By: CPISCITELLI | |||
| SWALE | COMPLETE | 09/17/2020 | 10/26/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 09/16/2020 | 09/19/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/16/2020 | 09/17/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 09/16/2020 | 09/17/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/16/2020 | 09/17/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/16/2020 | 09/18/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 09/16/2020 | 09/17/2020 |
| Note: Held By: CPISCITELLI Duct Layout needs to be signed by the AC contractor | |||
| PLUM | COMPLETE | 09/16/2020 | 09/19/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 09/16/2020 | 09/17/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 09/16/2020 | 09/21/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 09/16/2020 | 09/18/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/28/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 09/22/2020 |
| SITE PLAN 20 | ¤20.00 | 09/22/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/22/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/22/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/22/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 09/22/2020 |
| SEWER CREDIT | (¤2,305.66) | 09/22/2020 |
| SEWER INSPECTION | ¤25.00 | 09/22/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 09/22/2020 |
| WATER CREDIT | (¤40.74) | 09/22/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 09/22/2020 |
| METER - DEPOSIT | ¤60.00 | 09/22/2020 |
| WATER- TURN ON | ¤25.00 | 09/22/2020 |
| ADMIN FEE | ¤20.00 | 09/22/2020 |
| CONNECTION FEES | ¤1,002.88 | 09/22/2020 |
| BUILDING DISCOUNT 100% | (¤1,229.00) | 09/22/2020 |
| ELECTRIC FEE | ¤207.00 | 09/22/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/22/2020 |
| IMPACT FEE FIRE | ¤223.38 | 09/22/2020 |
| IMPACT FEE PARKS | ¤849.24 | 09/22/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/22/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 09/22/2020 |
| MECHANICAL FEE | ¤207.00 | 09/22/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/22/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/22/2020 |
| PLAN CHECK FEE | ¤98.00 | 09/22/2020 |
| PLUMBING FEE | ¤207.00 | 09/22/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,169.95 |