Permit #2020090702

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00400-0080
CONDITIONED SPACE: 1867 sqft
GARAGE: 409 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
Total Square Footage: 2304 sqft
Block: 00400
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 904-268-7730
Location Address: 61 FRONTIER DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/29/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES INC

Address

5220 SHAD RD STE 202

JACKSONVILLE, FL 32257

Lot: 0080
Contracted Stated Job Value: ¤120,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 05/27/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 05/26/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 05/26/2021 APPROVED KRUTH
U-CROSS CONNECTION 05/26/2021 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 05/26/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 05/26/2021 APPROVED KRUTH
BLD - BUILDING FINAL 05/26/2021 FINAL APPROVED BGREVE
ELECTRIC - EARLY POWER 04/16/2021 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION NO GROUNDING ELECTRODE CONDUCTOR CONNECTED TO UFER NEC 250 AND 230 EMAILED FPL RELEASED POWER 1:10
ELECTRIC - EARLY POWER 04/14/2021 Disapproved -FEE REQUIRED RMARTIN
Note: NO GROUNDING ELECTRODE CONDUCTOR CONNECTED TO UFER NEC 250 AND 230
U - SEWER TIE IN 03/24/2021 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 03/18/2021 APPROVED - AS NOTED KRUTH
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
LATH/BRICK/ WATER BARRIER 03/16/2021 APPROVED BGREVE
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 03/12/2021 CANCELLED BY APPLICANT WMILLER
INSULATION 03/11/2021 APPROVED WMILLER
ALL ROUGH 03/09/2021 APPROVED JBODEN
ROOF VALLEY & METAL 02/24/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/19/2021 APPROVED WMILLER
FOUND SURVEY APPROVED (OFFICE) 01/21/2021 APPROVED TBAKER
TIE BEAM / LINTEL 01/04/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION Not 01-04-21 approved
TIE BEAM / LINTEL 12/29/2020 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Not Ready
MONOLITHIC SLAB 12/18/2020 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 12/14/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 12/14/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 11/06/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/20/2021 01/21/2021
Note: Released By: TBAKER
ZON COMPLETE 01/20/2021 01/20/2021
Note: Released By: TDOAK
SW1 COMPLETE 09/23/2020 09/23/2020
Note: Released By: CTROHA
MECH COMPLETE 09/23/2020 09/23/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 09/23/2020 09/24/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 09/23/2020 09/23/2020
Note: Released By: TBAKER
UTL COMPLETE 09/23/2020 09/25/2020
Note: Released By: LFITZGERALD
SWALE COMPLETE 09/17/2020 10/26/2020
Note: Released By: TBAKER
BLD COMPLETE 09/16/2020 09/19/2020
Note: Released By: JPI
CUSVC COMPLETE 09/16/2020 09/22/2020
Note: Released By: HHAND
ELEC COMPLETE 09/16/2020 09/17/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 09/16/2020 09/17/2020
Note: Released By: TBAKER
LOCATE COMPLETE 09/16/2020 09/18/2020
Note: Released By: CSTONE
MECH HOLD 09/16/2020 09/17/2020
Note: Held By: CPISCITELLI 1. Orientation of Energy calcs does not match the site plan. Revise to match the site plan. 2. Duct Drawing needs to be signed by the AC contractor
PLUM COMPLETE 09/16/2020 09/19/2020
Note: Released By: JPI
SW1 HOLD 09/16/2020 09/17/2020
Note: Held By: CTROHA Survey incomplete see stormwater checklist uploaded in attachments
UTL COMPLETE 09/16/2020 09/21/2020
Note: Released By: LFITZGERALD
ZON COMPLETE 09/16/2020 09/18/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/19/2021
REINSPECTION FEE ¤40.00 05/19/2021
NEW RESIDENTIAL INSPECTIONS ¤450.00 09/29/2020
SITE PLAN 20 ¤20.00 09/29/2020
SURCHARGE FS 533.721 ¤2.00 09/29/2020
SURCHARGE - FS 468.631 ¤2.00 09/29/2020
STORM WATER PERMIT FEES ¤80.00 09/29/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 09/29/2020
SEWER CREDIT (¤1,342.00) 09/29/2020
SEWER INSPECTION ¤25.00 09/29/2020
SEWER CAPITAL FACILITY ¤4,596.07 09/29/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 09/29/2020
METER - DEPOSIT ¤60.00 09/29/2020
WATER- TURN ON ¤25.00 09/29/2020
ADMIN FEE ¤20.00 09/29/2020
CONNECTION FEES ¤1,002.88 09/29/2020
BUILDING DISCOUNT 100% (¤1,145.00) 09/29/2020
ELECTRIC FEE ¤195.00 09/29/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/29/2020
IMPACT FEE FIRE ¤223.38 09/29/2020
IMPACT FEE PARKS ¤849.24 09/29/2020
IMPACT FEE SCHOOL ¤3,600.00 09/29/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 09/29/2020
MECHANICAL FEE ¤195.00 09/29/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/29/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/29/2020
PLAN CHECK FEE ¤90.00 09/29/2020
PLUMBING FEE ¤195.00 09/29/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,214.35