I want to search for...

Permit #2020090710

Permit Details

Status: COED

Parcel Id: 21-10-30-5410-00000-1640
CONDITIONED SPACE: 3004 sqft
GARAGE: 401 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
Total Square Footage: 3465 sqft
Subdivision: 2135 - SAWMILL CREEK SUBDIVISION
Job Phone: 904-268-7730
Location Address: 112 OAKLEAF WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/29/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES LLC

Address

5220 SHAD ROAD SUTE 202

JACKSONVILLE, FL 32257

Lot: 164
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/21/2021 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 04/20/2021 CANCELLED BY APPLICANT FWILLIS
U -UTILITY RESIDENTIAL FINAL 04/20/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 03/30/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 03/30/2021 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 03/30/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 03/30/2021 APPROVED KRUTH
U-CROSS CONNECTION 03/18/2021 APPROVED - AS NOTED JHARDING
Note: Approved, no cross connections.
ROW- PRE-APRON (PRE-POUR) 03/04/2021 APPROVED - AS NOTED KRUTH
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete
ELECTRIC - EARLY POWER 03/04/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:45
U - SEWER TIE IN 02/19/2021 APPROVED JGIBSON
INSULATION 01/25/2021 APPROVED FWILLIS
ALL ROUGH 01/22/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes.
LATH/BRICK/ WATER BARRIER 01/22/2021 APPROVED FWILLIS
ALL ROUGH 01/20/2021 Disapproved - NO FEE FWILLIS
Note: 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes.
ROOF VALLEY & METAL 01/19/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/08/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 11/19/2020 APPROVED TBAKER
TIE BEAM / LINTEL 11/12/2020 APPROVED JCOLASANTI
MONOLITHIC SLAB 11/04/2020 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION center steel gargage left corner...entry footers need to be 12" deep all the way around
MONOLITHIC SLAB 11/03/2020 Disapproved - NO FEE JCOLASANTI
Note: center steel gargage left corner...entry footers need to be 12" deep all the way around
PLUMBING 1ST ROUGH UNDERGROUND 10/28/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 10/28/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 10/02/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON CANCEL 02/23/2021 02/23/2021
Note: Good afternoon, I didn't mean to upload the revision on permit # 2020090710. Please cancel that. I apologize. Sending positive vibes your way, Jeremy Friedman Permitting Coordinator O: 904-268-7730 | M: 904-305-8901 | friedmanj@maronda.com 5220 Shad Road #202 | Jacksonville, FL 32257
SW1 CANCEL 02/22/2021 02/23/2021
ENGIN1 CANCEL 02/22/2021 02/23/2021
ZON HOLD 02/22/2021 02/22/2021
Note: Held By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM There is already an approved foundation survey with the house at the originally approved setback.
SW1 HOLD 12/04/2020 12/04/2020
Note: Held By: GBERTOLA LOOKING ON THE SITE PLAN ON THE RIGHT SIDE NEED MORE ELEVATION FRONT THE BACK TO FRONT EVEN BY THE SIDE WALK
ZON COMPLETE 12/03/2020 12/03/2020
Note: Released By: TDOAK
ENGIN1 COMPLETE 12/03/2020 12/04/2020
Note: Released By: TBAKER
ENGIN1 COMPLETE 11/18/2020 11/19/2020
Note: Released By: TBAKER Foundation Survey
ZON COMPLETE 11/18/2020 11/18/2020
Note: Released By: AMOBLEY
MECH COMPLETE 09/25/2020 09/25/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 09/22/2020 09/23/2020
Note: Released By: ELENS Bathroom 4 will be relabeled to bathroom # 3. Jeremy Friedman is sending in a revised floor plan.
UTL COMPLETE 09/22/2020 09/25/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 09/22/2020 09/23/2020
Note: Released By: TBAKER
SW1 COMPLETE 09/22/2020 09/22/2020
Note: Released By: CTROHA
CUSVC COMPLETE 09/22/2020 09/22/2020
Note: Released By: HHAND
MECH HOLD 09/22/2020 09/22/2020
Note: Held By: CPISCITELLI 1. Orientation of Energy calcs does not match the site plan. Revise to match the site plan.(Second Request)
URB COMPLETE 09/21/2020 09/21/2020
Note: Released By: JBEAUDET
SW1 HOLD 09/17/2020 09/17/2020
Note: Held By: GBERTOLA PLEASE CHECK THE RESIDENTIAL SITE PLAN CHECK LIST Lot drainage features and patterns must be clearly depicted and include flow arrows. WE NEED THE FLOW ARROWS
UTL COMPLETE 09/16/2020 09/21/2020
Note: Released By: LFITZGERALD
ZON HOLD 09/16/2020 09/21/2020
Note: Held By: ELENS Should bathroom #4 downstairs be labeled bathroom #3?
BLD COMPLETE 09/16/2020 09/19/2020
Note: Released By: JPI
CUSVC HOLD 09/16/2020 09/17/2020
Note: Held By: HHAND Please update the utility application to have "reclaim" checked off.
ELEC COMPLETE 09/16/2020 09/17/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 09/16/2020 09/17/2020
Note: Released By: TBAKER
LOCATE COMPLETE 09/16/2020 09/18/2020
Note: Released By: CSTONE
MECH HOLD 09/16/2020 09/17/2020
Note: Held By: CPISCITELLI 1. Orientation of Energy calcs does not match the site plan. Revise to match the site plan. 2. Square footage on energy calcs and heat load do not match the house. Revise to match. 3. R403.7.1.2.1 FBC Energy Conservation 2017 6TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated.
PLUM COMPLETE 09/16/2020 09/19/2020
Note: Released By: JPI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 09/29/2020
WATER-METER ¤434.59 09/29/2020
WATER-METER ¤361.04 09/29/2020
ADMIN FEE ¤20.00 09/29/2020
CONNECTION FEES ¤25.00 09/29/2020
BUILDING DISCOUNT 100% (¤1,674.20) 09/29/2020
ELECTRIC FEE ¤270.60 09/29/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 09/29/2020
IMPACT FEE FIRE ¤223.38 09/29/2020
IMPACT FEE PARKS ¤849.24 09/29/2020
IMPACT FEE TRANSPORTATION ¤3,059.00 09/29/2020
MECHANICAL FEE ¤270.60 09/29/2020
WATER -IRRIGATION INSPECTION ¤25.00 09/29/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/29/2020
PLAN CHECK FEE ¤140.40 09/29/2020
PLUMBING FEE ¤270.60 09/29/2020
NEW RESIDENTIAL INSPECTIONS ¤702.00 09/29/2020
SITE PLAN 20 ¤20.00 09/29/2020
SURCHARGE FS 533.721 ¤2.00 09/29/2020
SURCHARGE - FS 468.631 ¤2.00 09/29/2020
STORM WATER PERMIT FEES ¤80.00 09/29/2020
3% TRANS IMPACT FEE CREDIT (¤91.77) 09/29/2020
SEWER INSPECTION ¤25.00 09/29/2020
SEWER CAPITAL FACILITY ¤2,389.36 09/29/2020
WATER CAPITAL FACILITY FEE ¤2,234.43 09/29/2020
Fees Total Due: ¤0.00 Total Paid: ¤9,666.09