I want to search for...

Permit #2020090784

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00590-0080
CONDITIONED SPACE: 1705 sqft
GARAGE: 391 sqft
OPENED PORCH (WITH ROOF) : 240 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 2368 sqft
Block: 00590
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 386-960-7720
Location Address: 15 SELLNER PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/02/2020
NOC: RECORDED
Applicant name: LAWRENCE FRED SIETSMA
Owner: AVTEC HOMES INC

Address

SUITE 5

PALM BAY, FL 32907

Address

620 MALABAR ROAD SE

PALM BAY, FL 32907

Lot: 0080
Contracted Stated Job Value: ¤233,681.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AVTEC HOMES INC
Status Location Address State License Number Phone
CANCEL

2405 E GRAVES AVE

ORANGE CITY, FL 32763

CRC041905 (Exp: 08/31/2024) 386-960-7720

Sub Contractors

STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
BRUCE R BOLTON
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

1982 SR 44

NEW SMYRNA BEACH, FL 32168

SUITE 357

NEW SMYRNA BEACH, FL 32168

CAC1817407 (Exp: 08/31/2022) 386-216-5975 386-402-4191
DOUGLAS EDWARD RICHARDS
Status Location Address State License Number Phone Fax
INACTIVE

108 E INDIANA AVENUE

DELAND, FL 32724

CCC1328824 (Exp: 08/31/2024) 386-736-4226 386-740-0535

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/08/2021 FINAL APPROVED TSTAUFFACHER
ROW - FINAL APRON (AFTER POUR) 04/08/2021 APPROVED RGROSS
ROW - STORMWATER FINAL 04/08/2021 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 04/08/2021 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 04/07/2021 APPROVED - AS NOTED RGROSS
Note: On site with super about always grading to the property line next to a vacant to create a common swale.
FINAL SURVEY (OFFICE USE ONLY) 04/07/2021 APPROVED RGROSS
GRAVITY SEWER TEST 03/22/2021 APPROVED JGIBSON
Note: THIS IS A REINSPECTION NO TEST AND COVERED OPEN DITCH BACK UP FOR INSPECTION ALL THE WAY TO TAP
U - SEWER TIE IN 03/22/2021 APPROVED JGIBSON
Note: THIS IS A REINSPECTION SEE GRAVITY SEWER NOTES
U - SEWER TIE IN 03/12/2021 Disapproved - NO FEE JGIBSON
Note: SEE GRAVITY SEWER NOTES
U-CROSS CONNECTION 03/12/2021 APPROVED - AS NOTED JHARDING
Note: No irrigation. No cross connections.
GRAVITY SEWER TEST 03/12/2021 Disapproved -FEE REQUIRED JGIBSON
Note: NO TEST AND COVERED OPEN DITCH BACK UP FOR INSPECTION ALL THE WAY TO TAP
ELECTRIC - EARLY POWER 03/08/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:30 am
ELECTRIC - EARLY POWER 03/03/2021 Disapproved - NO FEE JMUNSON
Note: Electric load calcs call for a 200 amp service. 150 amp main breaker is insatlled.
ELECTRIC - EARLY POWER 03/02/2021 Disapproved -FEE REQUIRED JMUNSON
Note: House needs to be unlocked for inspection.
ROW- PRE-APRON (PRE-POUR) 02/19/2021 APPROVED - AS NOTED KRUTH
Note: The mitered end forms need to go all the way to the ground, to prevent any concrete from going into the swale, before pouring concrete.
ELECTRIC - EARLY POWER 01/27/2021 CANCELLED BY APPLICANT RMARTIN
LATH/BRICK/ WATER BARRIER 01/26/2021 APPROVED JBODEN
INSULATION 01/19/2021 APPROVED TSTAUFFACHER
ALL ROUGH 01/13/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Add protection plates for service cable to panel at top plate. Note:: add fire blocking at range exhaust vent prior to or at insulation
ELECTRIC-TUG 01/12/2021 APPROVED TSTAUFFACHER
ALL ROUGH 01/12/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Add protection plates for service cable to panel at top plate. Note:: add fire blocking at range exhaust vent prior to or at insulation
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/30/2020 Disapproved - NO FEE TSTAUFFACHER
Note: See notes below. No revisions uploaded to system or in job box THIS IS A REINSPECTION need revision for letter from registered design professional for repairs to truss A09 (highlighted on roof plan) R802.10.4 Alterations to trusses. Truss members shall not be cut, notched, drilled, spliced or otherwise altered in any way without the approval of a registered design professional.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/30/2020 APPROVED TSTAUFFACHER
Note: Revisions provided TS//12/30/2020 THIS IS A REINSPECTION See notes below. No revisions uploaded to system or in job box THIS IS A REINSPECTION need revision for letter from registered design professional for repairs to truss A09 (highlighted on roof plan) R802.10.4 Alterations to trusses. Truss members shall not be cut, notched, drilled, spliced or otherwise altered in any way without the approval of a registered design professional.
ROOF VALLEY & METAL 12/30/2020 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/22/2020 Disapproved - NO FEE WMILLER
Note: need revision for letter from registered design professional for repairs to truss A09 (highlighted on roof plan) R802.10.4 Alterations to trusses. Truss members shall not be cut, notched, drilled, spliced or otherwise altered in any way without the approval of a registered design professional.
FOUND SURVEY APPROVED (OFFICE) 12/09/2020 APPROVED TBAKER
TIE BEAM / LINTEL 12/07/2020 APPROVED TSTAUFFACHER
MONOLITHIC SLAB 11/16/2020 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 11/10/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 10/26/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 12/08/2020 12/09/2020
Note: Released By: TBAKER
ZON COMPLETE 12/08/2020 12/08/2020
Note: Released By: TDOAK
MECH COMPLETE 09/28/2020 09/28/2020
Note: Released By: CPISCITELLI
BADMIN COMPLETE 09/24/2020 09/24/2020
Note: Released By: JMONTARULI
MECH HOLD 09/24/2020 09/24/2020
Note: Held By: CPISCITELLI Energy calcs and EPL card need to be signed by the builder. (second request)
ZON COMPLETE 09/24/2020 09/25/2020
Note: Released By: AMOBLEY
PLUM COMPLETE 09/24/2020 09/26/2020
Note: Released By: JPI
BADMIN HOLD 09/23/2020 09/23/2020
Note: Held By: MDEFREITAS YOU HAVE OTHER HOLDS FOR PLUMBING AND ZONING, YOU NEED TO SUBMITT ALL THE HOLDS AT THE SAME TIME
SWALE COMPLETE 09/18/2020 10/30/2020
Note: Released By: TBAKER
BLD COMPLETE 09/17/2020 09/21/2020
Note: Released By: JPI
CUSVC COMPLETE 09/17/2020 09/22/2020
Note: Released By: HHAND
ELEC COMPLETE 09/17/2020 09/22/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 09/17/2020 09/18/2020
Note: Released By: TBAKER
LOCATE COMPLETE 09/17/2020 09/18/2020
Note: Released By: CSTONE
MECH HOLD 09/17/2020 09/18/2020
Note: Held By: CPISCITELLI Energy calcs and EPL card need to be signed by the builder
PLUM HOLD 09/17/2020 09/21/2020
Note: Held By: JPI 1. Plumbing isometric does not indicate venting for kitchen sink. 2. Plumbing isometric indicates a tub in master bath, plans do not include tub.
SW1 COMPLETE 09/17/2020 09/18/2020
Note: Released By: CTROHA
UTL COMPLETE 09/17/2020 09/22/2020
Note: Released By: LFITZGERALD
ZON HOLD 09/17/2020 09/21/2020
Note: Held By: AMOBLEY Must have banding around windows and doors facing right of way. (Rear)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/09/2021
REINSPECTION FEE ¤40.00 04/09/2021
NEW RESIDENTIAL INSPECTIONS ¤468.00 10/02/2020
SITE PLAN 20 ¤20.00 10/02/2020
SURCHARGE FS 533.721 ¤2.00 10/02/2020
SURCHARGE - FS 468.631 ¤2.00 10/02/2020
STORM WATER PERMIT FEES ¤80.00 10/02/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 10/02/2020
SEWER CREDIT (¤1,466.00) 10/02/2020
SEWER INSPECTION ¤25.00 10/02/2020
SEWER CAPITAL FACILITY ¤4,596.07 10/02/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 10/02/2020
METER - DEPOSIT ¤60.00 10/02/2020
WATER- TURN ON ¤25.00 10/02/2020
ADMIN FEE ¤20.00 10/02/2020
CONNECTION FEES ¤1,002.88 10/02/2020
BUILDING DISCOUNT 100% (¤1,182.80) 10/02/2020
ELECTRIC FEE ¤200.40 10/02/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/02/2020
IMPACT FEE FIRE ¤223.38 10/02/2020
IMPACT FEE PARKS ¤849.24 10/02/2020
IMPACT FEE SCHOOL ¤3,600.00 10/02/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 10/02/2020
MECHANICAL FEE ¤200.40 10/02/2020
WATER -IRRIGATION INSPECTION ¤25.00 10/02/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/02/2020
PLAN CHECK FEE ¤93.60 10/02/2020
PLUMBING FEE ¤200.40 10/02/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,090.35