I want to search for...
Permit #2020090835
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00560-0010 |
| CONDITIONED SPACE: 2286 sqft |
| GARAGE: 588 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| OPENED PORCH (WITH ROOF) : 307 sqft |
| Total Square Footage: 3235 sqft |
| Block: 00560 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 904-268-7730 |
| Location Address: 3 SMOKE CANDLE PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/18/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES LLC OF FLORIDA |
|
Address 5220 SHAD ROAD SUITE 202 JACKSONVILLE, FL 32257 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/25/2021 | FINAL APPROVED | TSTAUFFACHER |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION Plug in master bath not complete, repair hole Missing valves in hall bath Trip hazard --floor plug not complete | |||
| BLD - BUILDING FINAL | 06/23/2021 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION Plug in master bath not complete, repair hole Missing valves in hall bath Trip hazard --floor plug not complete | |||
| BLD - BUILDING FINAL | 06/22/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Plug in master bath not complete, repair hole Missing valves in hall bath Trip hazard --floor plug not complete | |||
| U-CROSS CONNECTION | 06/14/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/14/2021 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 06/14/2021 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 06/14/2021 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/11/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 06/11/2021 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 05/21/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ELECTRIC - EARLY POWER | 05/18/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. All Lights and outlets need to be safed off in boxes 2. Ground wire for service needs to be connected to ground rods and ground wire needs to be in PVC. NEC 250.64 (B) 5/14/21 1. Entry light not safed off. 2. ground wire needs to be in PVC. NEC 250.64 (B) 5/18/21 Emailed FPL at 8:41 am | |||
| ELECTRIC - EARLY POWER | 05/14/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: THIS IS A REINSPECTION 1. All Lights and outlets need to be safed off in boxes 2. Ground wire for service needs to be connected to ground rods and ground wire needs to be in PVC. NEC 250.64 (B) 5/14/21 1. Entry light not safed off. 2. ground wire needs to be in PVC. NEC 250.64 (B) | |||
| ELECTRIC - EARLY POWER | 05/13/2021 | Disapproved - NO FEE | JMUNSON |
| Note: 1. All Lights and outlets need to be safed off in boxes 2. Ground wire for service needs to be connected to ground rods and ground wire needs to be in PVC. NEC 250.64 (B) | |||
| U - SEWER TIE IN | 04/30/2021 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 04/12/2021 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 04/12/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 04/09/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Front door not installed Protection for outside AC unit needed at top plate inside Bath Fans not wired Insulator already on site prior to passing inspection | |||
| INSULATION | 04/09/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 04/01/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Front door not installed Protection for outside AC unit needed at top plate inside Bath Fans not wired Insulator already on site prior to passing inspection | |||
| ROOF VALLEY & METAL | 03/31/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Valleys do not meet compliance: R905.2.8.2 Valleys Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. Valley linings of the following types shall be permitted: For open valleys (valley lining exposed) lined with metal, the valley lining shall be not less than 16 inches (406 mm) wide and of any of the corrosion-resistant metals in Table R903.2.1. For open valleys, valley lining of two plies of mineral-surfaced roll roofing, complying with ASTM D3909 or ASTM D6380 Class M, shall be permitted. The bottom layer shall be 18 inches (457 mm) and the top layer not less than 36 inches (914 mm) wide. For closed valleys (valley covered with shingles), valley lining of one ply of smooth roll roofing complying with ASTM D6380 Class S and not less than 36 inches wide (914 mm) or valley lining as described in Item 1 or 2 shall be permitted. Self-adhering polymer modified bitumen underlayment complying with ASTM D1970 shall be permitted in lieu of the lining material. | |||
| ROOF VALLEY & METAL | 03/25/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Valleys do not meet compliance: R905.2.8.2 Valleys Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. Valley linings of the following types shall be permitted: For open valleys (valley lining exposed) lined with metal, the valley lining shall be not less than 16 inches (406 mm) wide and of any of the corrosion-resistant metals in Table R903.2.1. For open valleys, valley lining of two plies of mineral-surfaced roll roofing, complying with ASTM D3909 or ASTM D6380 Class M, shall be permitted. The bottom layer shall be 18 inches (457 mm) and the top layer not less than 36 inches (914 mm) wide. For closed valleys (valley covered with shingles), valley lining of one ply of smooth roll roofing complying with ASTM D6380 Class S and not less than 36 inches wide (914 mm) or valley lining as described in Item 1 or 2 shall be permitted. Self-adhering polymer modified bitumen underlayment complying with ASTM D1970 shall be permitted in lieu of the lining material. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/11/2021 | APPROVED | JBODEN |
| FOUND SURVEY APPROVED (OFFICE) | 03/10/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/01/2021 | APPROVED | TSTAUFFACHER |
| MONOLITHIC SLAB | 02/17/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Footings washed in at garage and on back porch areas, marked on plans. 3" coverage not met. | |||
| MONOLITHIC SLAB | 02/16/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Footings washed in at garage and on back porch areas, marked on plans. 3" coverage not met. | |||
| MONOLITHIC SLAB | 02/12/2021 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/10/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 02/10/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 01/29/2021 | APPROVED | CSTONE |
| WILDLIFE CHECK - ENVIRONMENTAL | 11/23/2020 | APPROVED | JMYERS |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 05/21/2021 | 05/21/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/21/2021 | 05/28/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/21/2021 | 06/01/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/09/2021 | 03/09/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/09/2021 | 03/10/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| SW1 | COMPLETE | 12/17/2020 | 12/18/2020 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 12/17/2020 | 12/18/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 12/17/2020 | 12/17/2020 |
| Note: Released By: TBAKER | |||
| SW1 | HOLD | 12/16/2020 | 12/16/2020 |
| Note: Held By: GBERTOLA you need a new site plan with all missing info please stormwater residential site plan reviews | |||
| ENGIN1 | COMPLETE | 12/10/2020 | 12/10/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 12/10/2020 | 12/10/2020 |
| Note: Released By: ELENS | |||
| SW1 | HOLD | 12/10/2020 | 12/10/2020 |
| Note: Held By: GBERTOLA Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. (D) PLEASE READ AND FOLLOW RESIDENTIAL SITE PLAN REVIEWS | |||
| PLUM | COMPLETE | 12/07/2020 | 12/09/2020 |
| Note: Released By: JPI | |||
| PLENV | COMPLETE | 12/07/2020 | 12/08/2020 |
| Note: Released By: JMYERS The Approved After Action Report has been accepted. | |||
| PLENV | HOLD | 09/22/2020 | 09/23/2020 |
| Note: Held By: JMYERS Staff conducted a site inspection on 9/23/2020 and noted a Potentially Occupied Gopher Tortoise burrow on the property. Please provide an Approved After Action Report from FWC after relocation activities have been completed. | |||
| SWALE | COMPLETE | 09/21/2020 | 10/30/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 09/18/2020 | 09/21/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/18/2020 | 09/22/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 09/18/2020 | 09/22/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/18/2020 | 09/21/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/18/2020 | 09/21/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/18/2020 | 09/21/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 09/18/2020 | 09/21/2020 |
| Note: Held By: JPI 1. Plumbing riser is missing entire bath group. There is no laundry tub, however, there is a sink in laundry. Identify what WS indicates. Please alter isometric accordingly. | |||
| SW1 | HOLD | 09/18/2020 | 09/18/2020 |
| Note: Held By: CTROHA See uploaded Stormwater checklist in attachments for correction. Unchecked items need to be addressed | |||
| UTL | COMPLETE | 09/18/2020 | 09/23/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 09/18/2020 | 09/22/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/23/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤586.00 | 12/18/2020 |
| SITE PLAN 20 | ¤20.00 | 12/18/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/18/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 12/18/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/18/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 12/18/2020 |
| SEWER INSPECTION | ¤25.00 | 12/18/2020 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 12/18/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 12/18/2020 |
| METER - DEPOSIT | ¤60.00 | 12/18/2020 |
| WATER- TURN ON | ¤25.00 | 12/18/2020 |
| ADMIN FEE | ¤20.00 | 12/18/2020 |
| CONNECTION FEES | ¤1,017.83 | 12/18/2020 |
| BUILDING DISCOUNT 100% | (¤1,430.60) | 12/18/2020 |
| ELECTRIC FEE | ¤235.80 | 12/18/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 12/18/2020 |
| IMPACT FEE FIRE | ¤223.38 | 12/18/2020 |
| IMPACT FEE PARKS | ¤849.24 | 12/18/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/18/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 12/18/2020 |
| MECHANICAL FEE | ¤235.80 | 12/18/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/18/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/18/2020 |
| PLAN CHECK FEE | ¤117.20 | 12/18/2020 |
| PLUMBING FEE | ¤235.80 | 12/18/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,650.05 |