Permit #2020090947

Permit Details

Status: COED

Parcel Id: 07-11-31-7021-00010-0130
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 2475 sqft
Block: 00010
Subdivision: 2186 - SECTION 21-WYNNFIELD
Job Phone: 904-268-7730
Location Address: 45 WELLWOOD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/05/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES LLC

Address

5220 SHD ROAD #202

JACKSONVILLE, FL 32257

Lot: 0130
Contracted Stated Job Value: ¤120,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/25/2021 Disapproved - NO FEE MMESSER
Note: door locked
BLD - BUILDING FINAL 06/25/2021 FINAL APPROVED MMESSER
Note: THIS IS A REINSPECTION door locked
ROW - FINAL APRON (AFTER POUR) 06/25/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 06/25/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 06/25/2021 APPROVED - AS NOTED KRUTH
Note: There is a drainage ditch at the rear of the property that is holding water, but this will be a city issue and need to be looked into by the city
U -UTILITY RESIDENTIAL FINAL 06/25/2021 FINAL APPROVED LFITZGERALD
FINAL SURVEY (OFFICE USE ONLY) 06/24/2021 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 06/01/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:50
ROW- PRE-APRON (PRE-POUR) 06/01/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
U-CROSS CONNECTION 05/13/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
U - SEWER TIE IN 05/13/2021 APPROVED JGIBSON
INSULATION 04/20/2021 APPROVED JWALKER
ALL ROUGH 04/15/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION Incomplete inspection (not ready for inspection) missing duct layout, 107.3,1. missing nail plates on plumbing, P2603.2.1 missing nail plates on electric, FBC E3802.1 need to phase out electric in panel, NEC.210.5(C)..
ALL ROUGH 04/14/2021 Disapproved -FEE REQUIRED WMILLER
Note: Incomplete inspection (not ready for inspection) missing duct layout, 107.3,1. missing nail plates on plumbing, P2603.2.1 missing nail plates on electric, FBC E3802.1 need to phase out electric in panel, NEC.210.5(C)..
LATH/BRICK/ WATER BARRIER 04/13/2021 APPROVED BGREVE
ROOF VALLEY & METAL 04/13/2021 APPROVED BGREVE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/05/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION bearing wall detail calls out details on pages that are not on site (inspection stopped) Please provide all approved documents for isnpection 4/1/21 - NO APPROVED PLANS IN CONSTRUCTION BOX. PARTIAL PLANS ON FLOOR IN BAD CONDITION. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 04-05-21... notes above resolved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/01/2021 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION bearing wall detail calls out details on pages that are not on site (inspection stopped) Please provide all approved documents for isnpection 4/1/21 - NO APPROVED PLANS IN CONSTRUCTION BOX. PARTIAL PLANS ON FLOOR IN BAD CONDITION. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/25/2021 Disapproved - NO FEE WMILLER
Note: bearing wall detail calls out details on pages that are not on site (inspection stopped) Please provide all approved documents for isnpection
TIE BEAM / LINTEL 02/02/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 01/29/2021 APPROVED TBAKER
MONOLITHIC SLAB 01/25/2021 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 01/25/2021 FINAL APPROVED JBODEN
PLUMBING 1ST ROUGH UNDERGROUND 01/22/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 01/22/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 11/12/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/28/2021 01/29/2021
Note: Released By: TBAKER
ZON COMPLETE 01/28/2021 01/28/2021
Note: Released By: TDOAK
ENGIN1 COMPLETE 01/12/2021 01/12/2021
Note: Released By: TBAKER
SW1 COMPLETE 01/12/2021 01/14/2021
Note: Released By: CTROHA
ZON COMPLETE 01/12/2021 01/12/2021
Note: Released By: AMOBLEY
PLUM COMPLETE 09/24/2020 09/26/2020
Note: Released By: JPI
SWALE COMPLETE 09/22/2020 11/03/2020
Note: Released By: TBAKER
SW1 COMPLETE 09/22/2020 09/22/2020
Note: Released By: GBERTOLA
UTL COMPLETE 09/21/2020 09/24/2020
Note: Released By: LFITZGERALD
ZON COMPLETE 09/21/2020 09/23/2020
Note: Released By: AMOBLEY
BLD COMPLETE 09/21/2020 09/23/2020
Note: Released By: JPI
CUSVC COMPLETE 09/21/2020 09/24/2020
Note: Released By: HHAND
ELEC COMPLETE 09/21/2020 09/22/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 09/21/2020 09/22/2020
Note: Released By: TBAKER
LOCATE COMPLETE 09/21/2020 09/23/2020
Note: Released By: CSTONE
MECH COMPLETE 09/21/2020 09/22/2020
Note: Released By: CPISCITELLI
PLUM HOLD 09/21/2020 09/23/2020
Note: Held By: JPI 1. Provide sizing of all DWV piping.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/23/2021
REINSPECTION FEE ¤40.00 06/23/2021
NEW RESIDENTIAL INSPECTIONS ¤490.00 10/05/2020
SITE PLAN 20 ¤20.00 10/05/2020
SURCHARGE FS 533.721 ¤2.00 10/05/2020
SURCHARGE - FS 468.631 ¤2.00 10/05/2020
STORM WATER PERMIT FEES ¤80.00 10/05/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 10/05/2020
SEWER CREDIT (¤1,147.00) 10/05/2020
SEWER INSPECTION ¤25.00 10/05/2020
SEWER CAPITAL FACILITY ¤4,596.07 10/05/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 10/05/2020
METER - DEPOSIT ¤60.00 10/05/2020
WATER- TURN ON ¤25.00 10/05/2020
ADMIN FEE ¤20.00 10/05/2020
CONNECTION FEES ¤1,002.88 10/05/2020
BUILDING DISCOUNT 100% (¤1,229.00) 10/05/2020
ELECTRIC FEE ¤207.00 10/05/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/05/2020
IMPACT FEE FIRE ¤223.38 10/05/2020
IMPACT FEE PARKS ¤849.24 10/05/2020
IMPACT FEE SCHOOL ¤3,600.00 10/05/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 10/05/2020
MECHANICAL FEE ¤207.00 10/05/2020
WATER -IRRIGATION INSPECTION ¤25.00 10/05/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/05/2020
PLAN CHECK FEE ¤98.00 10/05/2020
PLUMBING FEE ¤207.00 10/05/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,409.35