Permit #2020090947
Permit Details
Status: COED
| Parcel Id: 07-11-31-7021-00010-0130 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 00010 |
| Subdivision: 2186 - SECTION 21-WYNNFIELD |
| Job Phone: 904-268-7730 |
| Location Address: 45 WELLWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/05/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES LLC |
|
Address 5220 SHD ROAD #202 JACKSONVILLE, FL 32257 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤120,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/25/2021 | Disapproved - NO FEE | MMESSER |
| Note: door locked | |||
| BLD - BUILDING FINAL | 06/25/2021 | FINAL APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION door locked | |||
| ROW - FINAL APRON (AFTER POUR) | 06/25/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/25/2021 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 06/25/2021 | APPROVED - AS NOTED | KRUTH |
| Note: There is a drainage ditch at the rear of the property that is holding water, but this will be a city issue and need to be looked into by the city | |||
| U -UTILITY RESIDENTIAL FINAL | 06/25/2021 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 06/24/2021 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 06/01/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:50 | |||
| ROW- PRE-APRON (PRE-POUR) | 06/01/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| U-CROSS CONNECTION | 05/13/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation | |||
| U - SEWER TIE IN | 05/13/2021 | APPROVED | JGIBSON |
| INSULATION | 04/20/2021 | APPROVED | JWALKER |
| ALL ROUGH | 04/15/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Incomplete inspection (not ready for inspection) missing duct layout, 107.3,1. missing nail plates on plumbing, P2603.2.1 missing nail plates on electric, FBC E3802.1 need to phase out electric in panel, NEC.210.5(C).. | |||
| ALL ROUGH | 04/14/2021 | Disapproved -FEE REQUIRED | WMILLER |
| Note: Incomplete inspection (not ready for inspection) missing duct layout, 107.3,1. missing nail plates on plumbing, P2603.2.1 missing nail plates on electric, FBC E3802.1 need to phase out electric in panel, NEC.210.5(C).. | |||
| LATH/BRICK/ WATER BARRIER | 04/13/2021 | APPROVED | BGREVE |
| ROOF VALLEY & METAL | 04/13/2021 | APPROVED | BGREVE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/05/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION bearing wall detail calls out details on pages that are not on site (inspection stopped) Please provide all approved documents for isnpection 4/1/21 - NO APPROVED PLANS IN CONSTRUCTION BOX. PARTIAL PLANS ON FLOOR IN BAD CONDITION. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 04-05-21... notes above resolved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/01/2021 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION bearing wall detail calls out details on pages that are not on site (inspection stopped) Please provide all approved documents for isnpection 4/1/21 - NO APPROVED PLANS IN CONSTRUCTION BOX. PARTIAL PLANS ON FLOOR IN BAD CONDITION. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/25/2021 | Disapproved - NO FEE | WMILLER |
| Note: bearing wall detail calls out details on pages that are not on site (inspection stopped) Please provide all approved documents for isnpection | |||
| TIE BEAM / LINTEL | 02/02/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 01/29/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/25/2021 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 01/25/2021 | FINAL APPROVED | JBODEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/22/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/22/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 11/12/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/28/2021 | 01/29/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 01/12/2021 | 01/12/2021 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 01/12/2021 | 01/14/2021 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 01/12/2021 | 01/12/2021 |
| Note: Released By: AMOBLEY | |||
| PLUM | COMPLETE | 09/24/2020 | 09/26/2020 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 09/22/2020 | 11/03/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 09/22/2020 | 09/22/2020 |
| Note: Released By: GBERTOLA | |||
| UTL | COMPLETE | 09/21/2020 | 09/24/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 09/21/2020 | 09/23/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 09/21/2020 | 09/23/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/21/2020 | 09/24/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 09/21/2020 | 09/22/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 09/21/2020 | 09/22/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/21/2020 | 09/23/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/21/2020 | 09/22/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 09/21/2020 | 09/23/2020 |
| Note: Held By: JPI 1. Provide sizing of all DWV piping. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/23/2021 |
| REINSPECTION FEE | ¤40.00 | 06/23/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤490.00 | 10/05/2020 |
| SITE PLAN 20 | ¤20.00 | 10/05/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/05/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/05/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/05/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/05/2020 |
| SEWER CREDIT | (¤1,147.00) | 10/05/2020 |
| SEWER INSPECTION | ¤25.00 | 10/05/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/05/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/05/2020 |
| METER - DEPOSIT | ¤60.00 | 10/05/2020 |
| WATER- TURN ON | ¤25.00 | 10/05/2020 |
| ADMIN FEE | ¤20.00 | 10/05/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/05/2020 |
| BUILDING DISCOUNT 100% | (¤1,229.00) | 10/05/2020 |
| ELECTRIC FEE | ¤207.00 | 10/05/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/05/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/05/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/05/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/05/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/05/2020 |
| MECHANICAL FEE | ¤207.00 | 10/05/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/05/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/05/2020 |
| PLAN CHECK FEE | ¤98.00 | 10/05/2020 |
| PLUMBING FEE | ¤207.00 | 10/05/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,409.35 |