I want to search for...

Permit #2020090972

Permit Details

Status: COED

Parcel Id: 35-11-31-4075-00000-00Q0
Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION
Job Phone: 407-523-2300
Location Address: 35 RIO VISTA DR
Type: CPO - COMMERCIAL POOL
Issue Date: 01/07/2021
NOC: RECORDED
Applicant name: WILLIAM PRICE PIVONKA
Owner: SUNBELT PALM COAST MARINA LLC

Address

3129 SPRINGBANK LANE

CHARLOTTE, NC 28226

Contracted Stated Job Value: ¤160,320.00
Job Description: CLUBHOUSE SWIMMING POOL & SPA
Type: CN

Contractor

VILLAGE POOLS OF CENTRAL FLORIDA LLC
Status Location Address State License Number Phone
ACTIVE

7013 FOREST CITY ROAD

,

CPC1457782 (Exp: 08/31/2026) 407-523-2300

Sub Contractors

STEPHEN P THIBAULT
Status Location Address State License Number Phone
ACTIVE

P. O. Box 4398

St. Augustine, FL 32085

EC0002511 (Exp: 08/31/2026) 904-829-6886
WILLIAM PRICE PIVONKA
Status Location Address State License Number Phone
ACTIVE

7013 FOREST CITY ROAD

, 0

CPC1457782 (Exp: 08/31/2026) 407-523-2300
GEORGE F AYLSWORTH JR
Status Location Address State License Number Phone Fax
DECEASED

2680 S US HIGHWAY 17

CRESCENT CITY, FL 32112

00714 (Exp: 08/31/2021) 386-698-1033 386-698-1077

Inspection History

Type Request Date Result Inspector
POOL CERTIFICATION/ OPERATING PERMIT - STATE DOH 06/08/2022 APPROVED BBEMBRY
BUILDING POOL FINAL 06/02/2022 FINAL APPROVED DCUSHING
BUILDING POOL FINAL 05/26/2022 FINAL APPROVED DCUSHING
Note: THIS IS A REINSPECTION Pool fence, where fence meets SE corner of building, has gaps well over 4" sphere test requirement.
GAS FINAL 05/25/2022 APPROVED MGIBSON
BUILDING POOL FINAL 05/23/2022 Disapproved - NO FEE DCUSHING
Note: Pool fence, where fence meets SE corner of building, has gaps well over 4" sphere test requirement.
FIRE FINAL 05/23/2022 APPROVED - AS NOTED RMARTIN
Note: WILL CHECK TWO LOCATIONS IN FENCE BARRIER ON BUILDING FINAL
LDSC- LANDSCAPE FINAL 05/19/2022 APPROVED JHARDING
ELECTRIC FINAL 05/19/2022 APPROVED JMUNSON
POOL DECK 04/19/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION inspection for completion of plumbing tie for pool. this was only thing inspected on 5-20-21 THIS IS A REINSPECTION Looked at pool piping only per notes from Contractor/Superintendent 3-7-22 WORK COMPLETED PRIOR TO INSPECTION.... PROVIDE ACCESS FOR INSPECTION OR PROVIDE LETTER FROM ENGINEER STATING EMPERICAL KNOWLEDGE OF COMPLIANCE WITH CURRENT CODES AND APPROVED DOCUMENTS along with sonar and or x-ray proof of completion and compliance of proper placement of reinforcing steel and bonding loop with connections 3-30-22 No change from note above 4-19-22 Met crew on site for destructive inspection. Pool crew removed pavers and performed OHM testing of equipotential bondong and all connections of handrails etc. Crew had documents on site wich showed no footings and therefore no reinforcing bars
POOL DECK 03/30/2022 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION inspection for completion of plumbing tie for pool. this was only thing inspected on 5-20-21 THIS IS A REINSPECTION Looked at pool piping only per notes from Contractor/Superintendent 3-7-22 WORK COMPLETED PRIOR TO INSPECTION.... PROVIDE ACCESS FOR INSPECTION OR PROVIDE LETTER FROM ENGINEER STATING EMPERICAL KNOWLEDGE OF COMPLIANCE WITH CURRENT CODES AND APPROVED DOCUMENTS along with sonar and or x-ray proof of completion and compliance of proper placement of reinforcing steel and bonding loop with connections 3-30-22 No change from note above
POOL DECK 03/07/2022 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION inspection for completion of plumbing tie for pool. this was only thing inspected on 5-20-21 THIS IS A REINSPECTION Looked at pool piping only per notes from Contractor/Superintendent 3-7-22 WORK COMPLETED PRIOR TO INSPECTION.... PROVIDE ACCESS FOR INSPECTION OR PROVIDE LETTER FROM ENGINEER STATING EMPERICAL KNOWLEDGE OF COMPLIANCE WITH CURRENT CODES AND APPROVED DOCUMENTS along with sonar and or x-ray proof of completion and compliance of proper placement of reinforcing steel and bonding loop with connections
GAS ROUGH 05/21/2021 APPROVED JGIBSON
POOL DECK 05/20/2021 PARTIALLY APPROVED BGREVE
Note: inspection for completion of plumbing tie for pool. this was only thing inspected on 5-20-21 THIS IS A REINSPECTION Looked at pool piping only per notes from Contractor/Superintendent
POOL DECK 05/11/2021 PARTIALLY APPROVED WMILLER
Note: Looked at pool piping only per notes from Contractor/Superintendent
POOL STEEL AND GROUND 04/14/2021 APPROVED JBODEN
POOL STEEL AND GROUND 04/13/2021 CANCELLED BY APPLICANT WEB

Review History

Department Status Date In Date Out
BADMIN HOLD 11/03/2021 11/03/2021
Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM PLEASE SUBMIT A LETTER FOR THE REASON WHY YOU NEED THIS EXTENSION.
BADMIN COMPLETE 11/03/2021 11/03/2021
Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM
DSD COMPLETE 12/17/2020 12/21/2020
Note: Released By: DRAMIREZ This approval is only for the pool.
BLD COMPLETE 12/17/2020 01/06/2021
Note: Released By: PBUCKLEY
DSD HOLD 10/07/2020 10/07/2020
Note: Held By: JGONZALEZ Revise site plan to show epuipmet pad for the spa and the UG gas tank include the dimensions and setbacks from property line.
MECH COMPLETE 10/07/2020 10/07/2020
Note: Released By: CPISCITELLI
BLD HOLD 09/22/2020 10/07/2020
Note: Held By: PBUCKLEY DUE TO AN ERROR THAT I MADE THE ORIGINAL BUILDING DIVISION REVIEW WAS MARKED COMPLETE WHEN IT WAS SUPPOSED TO HAVE BEEN PLACED ON HOLD. PLEASE SEE COMMENTS BELOW. PLEASE CONTACT PATRICK BUCKLEY AT 386-986-3786 WITH ANY QUESTIONS. THANK YOU. Pool Plan Sheet 1 of 5 1. Provide Florida Statute, Florida Administrative Code and / or Florida Building Code Section that exempts pool from ADA lift per note contained on plans. If no exemption is allowed, remove note from plans and provide lift details. 2. Provide details of required exterior accessible route from pool to public way and accessible parking per Section 206 and Chapter 4. This means from pool deck exit gates. Two exits are required from this pool deck based on occupant load including bathing and pool deck occupant load greater than 50 persons. Details mean landing dimensions at gates, landing dimensions at turns, width of accessible exterior route, slope including cross and longitudinal and materials. Provide accessible route from both gates to public way. 3. Provide details of required accessible exterior route from exterior of bathroom / changing rooms to pool per Section 206 and Chapter 4. If a ramp is to be used provide complete ramp details per Sections 206, 302 and 405. If raised deck area adjacent to bathrooms as well as the required ramp is beyond the scope of work for pool deck and pool, then show limits of construction.
BLD COMPLETE 09/22/2020 10/07/2020
Note: Released By: JBODEN
DSD COMPLETE 09/22/2020 09/23/2020
Note: Released By: DRAMIREZ
ELEC COMPLETE 09/22/2020 09/24/2020
Note: Released By: JMUNSON
MECH HOLD 09/22/2020 09/25/2020
Note: Held By: CPISCITELLI Provide gas riser diagram and site plan showing tank location and clearances

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 04/05/2022
REINSPECTION - COMMERCIAL ¤60.00 04/05/2022
BUILDING DISCOUNT 100% (¤1,366.61) 01/07/2021
PLAN CHECK FEE ¤184.37 01/07/2021
SITE PLAN 20 ¤20.00 01/07/2021
SURCHARGE FS 533.721 ¤2.00 01/07/2021
SURCHARGE - FS 468.631 ¤2.00 01/07/2021
ADMIN COMMERCIAL ¤60.00 01/07/2021
INSPECTION - COMMERCIAL ADD ¤1,122.24 01/07/2021
Fees Total Due: ¤0.00 Total Paid: ¤124.00