Permit #2020091020
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01180-0050 |
| CONDITIONED SPACE: 2517 sqft |
| GARAGE: 484 sqft |
| OPENED PORCH (WITH ROOF) : 380 sqft |
| OPENED PORCH (WITH ROOF) : 146 sqft |
| Total Square Footage: 3527 sqft |
| Block: 01180 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-447-7007 |
| Location Address: 2 LEWISTON PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/19/2020 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: ROSSON, MATTHEW & GRANT, KELLI |
|
Address 34 PINETREE DR PALM COAST, FL 32164 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| CANCEL |
457 CHELSEA PLACE AV ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2022) | 570-575-8139 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/23/2021 | FINAL APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 08/16/2021 | CANCELLED BY APPLICANT | RMARTIN |
| U -UTILITY RESIDENTIAL FINAL | 08/16/2021 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 08/16/2021 | FINAL APPROVED | DHANEY |
| U-CROSS CONNECTION | 08/13/2021 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 08/13/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/13/2021 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 08/13/2021 | APPROVED | KRUTH |
| ROW - FINAL INSPECTION | 08/13/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 08/13/2021 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 06/01/2021 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete | |||
| U - SEWER TIE IN | 05/25/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/25/2021 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 04/12/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:30 | |||
| PEP TANK INSTALLATION REQUEST | 03/29/2021 | APPROVED - AS NOTED | CSTONE |
| Note: Dumpster will need to move | |||
| PEP TANK INSTALLATION REQUEST | 03/15/2021 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 03/02/2021 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 02/26/2021 | APPROVED | JBODEN |
| ALL ROUGH | 02/24/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 02/05/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/02/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Need readable set of plans on site. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/01/2021 | CANCELLED BY APPLICANT | FWILLIS |
| Note: Need readable set of plans on site. | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/21/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/04/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Bed Joints on Window Sills Exceeds the FBC 606.3.1 (3/8" to 1/2") Highlighted in Orange on wall. 1/4/20 - Items corrected. | |||
| TIE BEAM / LINTEL | 12/29/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Bed Joints on Window Sills Exceeds the FBC 606.3.1 (3/8" to 1/2") Highlighted in Orange on wall. | |||
| MONOLITHIC SLAB | 12/03/2020 | APPROVED | JBODEN |
| Note: THIS IS A REINSPECTION MISSING UFER GROUND .NEC..250.52(3) | |||
| MONOLITHIC SLAB | 12/02/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: MISSING UFER GROUND .NEC..250.52(3) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/25/2020 | APPROVED | FWILLIS |
| WATER METER INSTALLATION REQUEST | 10/27/2020 | APPROVED | CSTONE |
| Note: Ready to install |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/28/2021 | 01/29/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | HOLD | 01/21/2021 | 01/21/2021 |
| Note: Held By: TBAKER FFE on Foundation survey is 8' +/- below centerline of road elevation. | |||
| ZON | COMPLETE | 01/21/2021 | 01/21/2021 |
| Note: Released By: TDOAK | |||
| ENGIN1 | HOLD | 12/18/2020 | 12/21/2020 |
| Note: Held By: TBAKER According to Foundation Survey the FFE is 8' +/- below the road elevation. Please confirm. | |||
| ZON | COMPLETE | 12/18/2020 | 12/18/2020 |
| Note: Released By: TDOAK | |||
| ELEC | COMPLETE | 10/13/2020 | 10/13/2020 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 10/13/2020 | 10/14/2020 |
| Note: Released By: ELENS | |||
| BLD | COMPLETE | 09/23/2020 | 09/26/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/23/2020 | 09/25/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 09/23/2020 | 09/24/2020 |
| Note: Held By: JMUNSON 1. Submit riser diagram. 2. Need light and switch by garage side door. NEC 2014 210.70(A) (2) (b) | |||
| ENGIN1 | COMPLETE | 09/23/2020 | 09/23/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/23/2020 | 09/24/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/23/2020 | 09/24/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 09/23/2020 | 09/26/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 09/23/2020 | 09/23/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 09/23/2020 | 09/25/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 09/23/2020 | 09/24/2020 |
| Note: Held By: ELENS Please provide driveway width at the garage door. The color is too dark. LDC Chapter 13- 13.02.06.B.b.: ...Acceptable earth tone shades shall have a LRV of 25 or greater. | |||
| SWALE | COMPLETE | 09/23/2020 | 11/05/2020 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/24/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 08/24/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 08/24/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 08/24/2021 |
| REINSPECTION FEE | ¤40.00 | 08/24/2021 |
| REINSPECTION FEE | ¤40.00 | 08/24/2021 |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 08/24/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/19/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/19/2020 |
| SEWER CREDIT | (¤2,456.09) | 10/19/2020 |
| SEWER INSPECTION | ¤25.00 | 10/19/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/19/2020 |
| WATER CREDIT | (¤43.69) | 10/19/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/19/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤642.00 | 10/19/2020 |
| SITE PLAN 20 | ¤20.00 | 10/19/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/19/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/19/2020 |
| METER - DEPOSIT | ¤60.00 | 10/19/2020 |
| WATER- TURN ON | ¤25.00 | 10/19/2020 |
| ADMIN FEE | ¤20.00 | 10/19/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/19/2020 |
| BUILDING DISCOUNT 100% | (¤1,548.20) | 10/19/2020 |
| ELECTRIC FEE | ¤252.60 | 10/19/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/19/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/19/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/19/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/19/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/19/2020 |
| MECHANICAL FEE | ¤252.60 | 10/19/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/19/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/19/2020 |
| PLAN CHECK FEE | ¤128.40 | 10/19/2020 |
| PLUMBING FEE | ¤252.60 | 10/19/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,236.57 |