Permit #2020091121
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00880-0050 |
| CONDITIONED SPACE: 1090 sqft |
| CONDITIONED SPACE: 1947 sqft |
| GARAGE: 517 sqft |
| OPENED PORCH (WITH ROOF) : 35 sqft |
| OPENED PORCH (WITH ROOF) : 625 sqft |
| Total Square Footage: 4214 sqft |
| Block: 00880 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 321-610-3924 |
| Location Address: 19 LAKE CHARLES LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/03/2020 |
| NOC: RECORDED |
| Applicant name: KENNETH WAYNE CAMBELL JR |
| Owner: VINTAGE ESTATE HOMES LLC |
|
Address 780 S APOLLO BLVD STE 100 MELBOURNE, FL 32940 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
SUITE 101 MELBOURNE, FL 32940 |
CBC058803 (Exp: 08/31/2022) | 321-610-3924 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 08/05/2021 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 08/04/2021 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION GUEST BATH 2ND FLOOR NEEDS TO HAVE LIGHT SWITCH INSTALLED INSIDE TOILET AREA, NOT OUSIDE OVER VANITY 8/3/21 - ELECTRICAL LIGHT SWITCH NOT INSTALLED YET. ON SITE WITH ELECTRICIAN AND HE WILL BE INSTALLING LIGHT SWITCH ON WALL NEXT TO THE TOILET. WHEN COMPLETED SCHEDULE REINSPECTION. | |||
| BLD - BUILDING FINAL | 08/03/2021 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION GUEST BATH 2ND FLOOR NEEDS TO HAVE LIGHT SWITCH INSTALLED INSIDE TOILET AREA, NOT OUSIDE OVER VANITY | |||
| BLD - BUILDING FINAL | 08/03/2021 | Disapproved - NO FEE | FWILLIS |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION GUEST BATH 2ND FLOOR NEEDS TO HAVE LIGHT SWITCH INSTALLED INSIDE TOILET AREA, NOT OUSIDE OVER VANITY 8/3/21 - ELECTRICAL LIGHT SWITCH NOT INSTALLED YET. ON SITE WITH ELECTRICIAN AND HE WILL BE INSTALLING LIGHT SWITCH ON WALL NEXT TO THE TOILET. WHEN COMPLETED SCHEDULE REINSPECTION. | |||
| BLD - BUILDING FINAL | 08/02/2021 | Disapproved - NO FEE | RMARTIN |
| Note: GUEST BATH 2ND FLOOR NEEDS TO HAVE LIGHT SWITCH INSTALLED INSIDE TOILET AREA, NOT OUSIDE OVER VANITY NEC 210.70 1 | |||
| ROW - FINAL APRON (AFTER POUR) | 08/02/2021 | APPROVED - AS NOTED | KRUTH |
| Note: NOTE TO INSPECTOR. Make sure driveway saw cut is over the culvert itself. getting done | |||
| ROW - STORMWATER FINAL | 08/02/2021 | APPROVED - AS NOTED | KRUTH |
| Note: hot patch needs to be done and saw cut down the center of the pipe | |||
| U -UTILITY RESIDENTIAL FINAL | 08/02/2021 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/30/2021 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 07/30/2021 | APPROVED | RGROSS |
| U - SEWER TIE IN | 07/16/2021 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 07/12/2021 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ELECTRIC - EARLY POWER | 07/12/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:20 | |||
| ELECTRIC - EARLY POWER | 07/08/2021 | CANCELLED BY APPLICANT | JMUNSON |
| PEP TANK INSTALLATION REQUEST | 06/29/2021 | APPROVED | CSTONE |
| INSULATION | 05/18/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 5/11/21 - Window and door rough openings shall be covered by wood structural panels applied over the water resistive barrier and sufficiently fastened and sealed to prevent any water entry into the building AND in between exterior cladding materials and the wall surface. | |||
| LATH/BRICK/ WATER BARRIER | 05/17/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION AS PER YOUR REQUEST. | |||
| LATH/BRICK/ WATER BARRIER | 05/11/2021 | CANCELLED BY APPLICANT | FWILLIS |
| Note: AS PER YOUR REQUEST. | |||
| INSULATION | 05/11/2021 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION 5/11/21 - Window and door rough openings shall be covered by wood structural panels applied over the water resistive barrier and sufficiently fastened and sealed to prevent any water entry into the building AND in between exterior cladding materials and the wall surface. | |||
| INSULATION | 05/10/2021 | CANCELLED BY APPLICANT | FWILLIS |
| ALL ROUGH | 04/30/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes. 4/30/21 - Item Corrected | |||
| ALL ROUGH | 04/29/2021 | Disapproved - NO FEE | FWILLIS |
| Note: 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes. | |||
| ROOF VALLEY & METAL | 03/25/2021 | APPROVED | FWILLIS |
| WALL SHEATHING | 03/09/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Need safe access to second floor to continue Wall Sheathing Inspection on the inside. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/09/2021 | APPROVED | FWILLIS |
| Note: Install Guard Rails for Safety at Openings. | |||
| WALL SHEATHING | 03/03/2021 | PARTIALLY APPROVED | FWILLIS |
| Note: Need safe access to second floor to continue Wall Sheathing Inspection on the inside. | |||
| TIE BEAM / LINTEL | 02/05/2021 | APPROVED | FWILLIS |
| Note: 2nd Floor | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/13/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/12/2021 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 12/28/2020 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/18/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/18/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 12/17/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| CUSVC | COMPLETE | 06/21/2021 | 06/28/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ENGIN1 | COMPLETE | 01/12/2021 | 01/13/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/12/2021 | 01/12/2021 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 10/13/2020 | 10/13/2020 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 10/13/2020 | 10/15/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 10/13/2020 | 10/14/2020 |
| Note: Released By: CTROHA | |||
| SWALE | COMPLETE | 09/28/2020 | 11/11/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 09/24/2020 | 09/29/2020 |
| Note: Held By: JPI 1. Please clarify page A2 as the layout appears inconsistent with the details in the application. | |||
| CUSVC | COMPLETE | 09/24/2020 | 09/25/2020 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 09/24/2020 | 09/25/2020 |
| Note: Held By: JMUNSON Need smoke alarm in front bedroom. FBC 2017 314.3 and 315.1 | |||
| ENGIN1 | COMPLETE | 09/24/2020 | 09/28/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 09/24/2020 | 09/30/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 09/24/2020 | 09/25/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 09/24/2020 | 09/29/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 09/24/2020 | 09/30/2020 |
| Note: Held By: CTROHA An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D) | |||
| UTL | COMPLETE | 09/24/2020 | 10/01/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 09/24/2020 | 09/25/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 11/03/2020 |
| WATER- TURN ON | ¤25.00 | 11/03/2020 |
| ADMIN FEE | ¤20.00 | 11/03/2020 |
| CONNECTION FEES | ¤1,002.88 | 11/03/2020 |
| BUILDING DISCOUNT 100% | (¤1,817.00) | 11/03/2020 |
| ELECTRIC FEE | ¤291.00 | 11/03/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 11/03/2020 |
| IMPACT FEE FIRE | ¤223.38 | 11/03/2020 |
| IMPACT FEE PARKS | ¤849.24 | 11/03/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/03/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 11/03/2020 |
| MECHANICAL FEE | ¤291.00 | 11/03/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/03/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 11/03/2020 |
| PLAN CHECK FEE | ¤154.00 | 11/03/2020 |
| PLUMBING FEE | ¤291.00 | 11/03/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤770.00 | 11/03/2020 |
| SITE PLAN 20 | ¤20.00 | 11/03/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/03/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/03/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/03/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 11/03/2020 |
| SEWER CREDIT | (¤1,466.00) | 11/03/2020 |
| SEWER INSPECTION | ¤25.00 | 11/03/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 11/03/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 11/03/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,010.35 |