I want to search for...

Permit #2020091121

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00880-0050
CONDITIONED SPACE: 1090 sqft
CONDITIONED SPACE: 1947 sqft
GARAGE: 517 sqft
OPENED PORCH (WITH ROOF) : 35 sqft
OPENED PORCH (WITH ROOF) : 625 sqft
Total Square Footage: 4214 sqft
Block: 00880
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 321-610-3924
Location Address: 19 LAKE CHARLES LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/03/2020
NOC: RECORDED
Applicant name: KENNETH WAYNE CAMBELL JR
Owner: VINTAGE ESTATE HOMES LLC

Address

780 S APOLLO BLVD STE 100

MELBOURNE, FL 32940

Lot: 0050
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES PREMIER HOMES LLC
Status Location Address Mailing Address State License Number Phone
CANCEL

4885 N WICKHAM RD

MELBOURNE, FL 32940

SUITE 101

MELBOURNE, FL 32940

CBC058803 (Exp: 08/31/2022) 321-610-3924

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 08/05/2021 APPROVED DHANEY
BLD - BUILDING FINAL 08/04/2021 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION GUEST BATH 2ND FLOOR NEEDS TO HAVE LIGHT SWITCH INSTALLED INSIDE TOILET AREA, NOT OUSIDE OVER VANITY 8/3/21 - ELECTRICAL LIGHT SWITCH NOT INSTALLED YET. ON SITE WITH ELECTRICIAN AND HE WILL BE INSTALLING LIGHT SWITCH ON WALL NEXT TO THE TOILET. WHEN COMPLETED SCHEDULE REINSPECTION.
BLD - BUILDING FINAL 08/03/2021 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION GUEST BATH 2ND FLOOR NEEDS TO HAVE LIGHT SWITCH INSTALLED INSIDE TOILET AREA, NOT OUSIDE OVER VANITY
BLD - BUILDING FINAL 08/03/2021 Disapproved - NO FEE FWILLIS
Note: New inspection due to canceled inspection THIS IS A REINSPECTION GUEST BATH 2ND FLOOR NEEDS TO HAVE LIGHT SWITCH INSTALLED INSIDE TOILET AREA, NOT OUSIDE OVER VANITY 8/3/21 - ELECTRICAL LIGHT SWITCH NOT INSTALLED YET. ON SITE WITH ELECTRICIAN AND HE WILL BE INSTALLING LIGHT SWITCH ON WALL NEXT TO THE TOILET. WHEN COMPLETED SCHEDULE REINSPECTION.
BLD - BUILDING FINAL 08/02/2021 Disapproved - NO FEE RMARTIN
Note: GUEST BATH 2ND FLOOR NEEDS TO HAVE LIGHT SWITCH INSTALLED INSIDE TOILET AREA, NOT OUSIDE OVER VANITY NEC 210.70 1
ROW - FINAL APRON (AFTER POUR) 08/02/2021 APPROVED - AS NOTED KRUTH
Note: NOTE TO INSPECTOR. Make sure driveway saw cut is over the culvert itself. getting done
ROW - STORMWATER FINAL 08/02/2021 APPROVED - AS NOTED KRUTH
Note: hot patch needs to be done and saw cut down the center of the pipe
U -UTILITY RESIDENTIAL FINAL 08/02/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 07/30/2021 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 07/30/2021 APPROVED RGROSS
U - SEWER TIE IN 07/16/2021 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 07/12/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ELECTRIC - EARLY POWER 07/12/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:20
ELECTRIC - EARLY POWER 07/08/2021 CANCELLED BY APPLICANT JMUNSON
PEP TANK INSTALLATION REQUEST 06/29/2021 APPROVED CSTONE
INSULATION 05/18/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 5/11/21 - Window and door rough openings shall be covered by wood structural panels applied over the water resistive barrier and sufficiently fastened and sealed to prevent any water entry into the building AND in between exterior cladding materials and the wall surface.
LATH/BRICK/ WATER BARRIER 05/17/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION AS PER YOUR REQUEST.
LATH/BRICK/ WATER BARRIER 05/11/2021 CANCELLED BY APPLICANT FWILLIS
Note: AS PER YOUR REQUEST.
INSULATION 05/11/2021 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION 5/11/21 - Window and door rough openings shall be covered by wood structural panels applied over the water resistive barrier and sufficiently fastened and sealed to prevent any water entry into the building AND in between exterior cladding materials and the wall surface.
INSULATION 05/10/2021 CANCELLED BY APPLICANT FWILLIS
ALL ROUGH 04/30/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes. 4/30/21 - Item Corrected
ALL ROUGH 04/29/2021 Disapproved - NO FEE FWILLIS
Note: 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) and or FBC CHAPTER 25 SECTION P2503.5.1 BUILDING SEWER TESTING Must use water for testing plastic pipes. Testing with not less than 5-foot (3048mm) of head water and be able to maintain such pressure for 15 minutes.
ROOF VALLEY & METAL 03/25/2021 APPROVED FWILLIS
WALL SHEATHING 03/09/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Need safe access to second floor to continue Wall Sheathing Inspection on the inside.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/09/2021 APPROVED FWILLIS
Note: Install Guard Rails for Safety at Openings.
WALL SHEATHING 03/03/2021 PARTIALLY APPROVED FWILLIS
Note: Need safe access to second floor to continue Wall Sheathing Inspection on the inside.
TIE BEAM / LINTEL 02/05/2021 APPROVED FWILLIS
Note: 2nd Floor
FOUND SURVEY APPROVED (OFFICE) 01/13/2021 APPROVED TBAKER
TIE BEAM / LINTEL 01/12/2021 APPROVED FWILLIS
MONOLITHIC SLAB 12/28/2020 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 12/18/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 12/18/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 12/17/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
CUSVC COMPLETE 06/21/2021 06/28/2021
Note: Released By: HALEIGH HAND - -
ENGIN1 COMPLETE 01/12/2021 01/13/2021
Note: Released By: TBAKER
ZON COMPLETE 01/12/2021 01/12/2021
Note: Released By: AMOBLEY
ELEC COMPLETE 10/13/2020 10/13/2020
Note: Released By: JMUNSON
BLD COMPLETE 10/13/2020 10/15/2020
Note: Released By: JPI
SW1 COMPLETE 10/13/2020 10/14/2020
Note: Released By: CTROHA
SWALE COMPLETE 09/28/2020 11/11/2020
Note: Released By: TBAKER
BLD HOLD 09/24/2020 09/29/2020
Note: Held By: JPI 1. Please clarify page A2 as the layout appears inconsistent with the details in the application.
CUSVC COMPLETE 09/24/2020 09/25/2020
Note: Released By: HHAND
ELEC HOLD 09/24/2020 09/25/2020
Note: Held By: JMUNSON Need smoke alarm in front bedroom. FBC 2017 314.3 and 315.1
ENGIN1 COMPLETE 09/24/2020 09/28/2020
Note: Released By: TBAKER
LOCATE COMPLETE 09/24/2020 09/30/2020
Note: Released By: CSTONE
MECH COMPLETE 09/24/2020 09/25/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 09/24/2020 09/29/2020
Note: Released By: JPI
SW1 HOLD 09/24/2020 09/30/2020
Note: Held By: CTROHA An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D)
UTL COMPLETE 09/24/2020 10/01/2020
Note: Released By: LFITZGERALD
ZON COMPLETE 09/24/2020 09/25/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 11/03/2020
WATER- TURN ON ¤25.00 11/03/2020
ADMIN FEE ¤20.00 11/03/2020
CONNECTION FEES ¤1,002.88 11/03/2020
BUILDING DISCOUNT 100% (¤1,817.00) 11/03/2020
ELECTRIC FEE ¤291.00 11/03/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 11/03/2020
IMPACT FEE FIRE ¤223.38 11/03/2020
IMPACT FEE PARKS ¤849.24 11/03/2020
IMPACT FEE SCHOOL ¤3,600.00 11/03/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 11/03/2020
MECHANICAL FEE ¤291.00 11/03/2020
WATER -IRRIGATION INSPECTION ¤25.00 11/03/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 11/03/2020
PLAN CHECK FEE ¤154.00 11/03/2020
PLUMBING FEE ¤291.00 11/03/2020
NEW RESIDENTIAL INSPECTIONS ¤770.00 11/03/2020
SITE PLAN 20 ¤20.00 11/03/2020
SURCHARGE FS 533.721 ¤2.00 11/03/2020
SURCHARGE - FS 468.631 ¤2.00 11/03/2020
STORM WATER PERMIT FEES ¤80.00 11/03/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 11/03/2020
SEWER CREDIT (¤1,466.00) 11/03/2020
SEWER INSPECTION ¤25.00 11/03/2020
SEWER CAPITAL FACILITY ¤4,596.07 11/03/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 11/03/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,010.35