Permit #2020100006
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00090-0010 |
| CONDITIONED SPACE: 2268 sqft |
| GARAGE: 459 sqft |
| OPENED PORCH (WITH ROOF) : 336 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| Total Square Footage: 3100 sqft |
| Block: 00090 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 386-237-5837 |
| Location Address: 42 BURNING VIEW LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/19/2020 |
| NOC: RECORDED |
| Applicant name: MARSEL GILMANSHIN |
| Owner: KOLESNIKOV ROMAN & INGA KOLESNIKOVA H&W |
|
Address 4600 E MOODY BLVD APT 10G BUNNELL, FL 32110 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY HOUSE |
| Type: CN |
Contractor
GILMANS DEVELOPMENT CORP
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4873 PALM COAST PARKWAY NW #4 PALM COAST, FL 32137 |
CBC1263180 (Exp: 08/31/2026) | 386-237-5837 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
FOOK MENG CHE
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2101 W ATLANTIC BVD #106 POMPANO BEACH, FL 33069 |
CAC1818187 (Exp: 08/31/2020) | 954-366-5576 | 954-532-9813 |
RAIVUS STUMBRIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
17 ESSINGTON LANE PALM COAST, FL 32164 |
CAC1818349 (Exp: 08/31/2026) | 386-597-9871 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/05/2022 | FINAL APPROVED | RMARTIN |
| ROW - FINAL APRON (AFTER POUR) | 08/05/2022 | APPROVED - AS NOTED | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** 08/05/22 EVERYTHING LOOKS GOOD AT THE TIME OF THIS INSPECTION ** 07/29/22 NOTE TO INSPECTOR BEFORE FINAL ROW STORMWATER AND ROW APRON FINALS: ** RIGHT SIDE OF OF PROPERTY, NEED TO REMOVE SHRUBS THAT ARE ACROSS THE DRAINAGE CONVEYANCE AND THE MULCH BARK TO THE LEFT SIDE OF PEP TANK. ** CULVERT ENDS NEED TO BE CLEANED OUT OF DEBRIS AND OVER POUR FROM CONCRETE | |||
| ROW - STORMWATER FINAL | 08/05/2022 | APPROVED - AS NOTED | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** 08/05/22 CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THIS INSPECTION ** 07/29/22 NOTE TO INSPECTOR BEFORE FINAL ROW STORMWATER AND ROW APRON FINALS: ** RIGHT SIDE OF OF PROPERTY, NEED TO REMOVE SHRUBS THAT ARE ACROSS THE DRAINAGE CONVEYANCE AND THE MULCH BARK TO THE LEFT SIDE OF PEP TANK. ** CULVERT ENDS NEED TO BE CLEANED OUT OF DEBRIS AND OVER POUR FROM CONCRETE | |||
| U -UTILITY RESIDENTIAL FINAL | 08/05/2022 | APPROVED - AS NOTED | DHANEY |
| Note: Utility sewer dept. needs to repair Pep tank - sewer dept. has been notified . | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/29/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/29/22 NOTE TO INSPECTOR BEFORE FINAL ROW STORMWATER AND ROW APRON FINALS: ** RIGHT SIDE OF OF PROPERTY, NEED TO REMOVE SHRUBS THAT ARE ACROSS THE DRAINAGE CONVEYANCE AND THE MULCH BARK TO THE LEFT SIDE OF PEP TANK. ** CULVERT ENDS NEED TO BE CLEANED OUT OF DEBRIS AND OVER POUR FROM CONCRETE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/29/2022 | APPROVED - AS NOTED | EMADISON |
| Note: THIS IS A REINSPECTION ** 07/29/22 CORRECTIONS MADE EVERYTHING LOOKS GOOD CHECK THE SWALE PLAN DETAIL, WATER FLOW TO THE LEFT. YOUR FINAL SURVEY SHOULD WATER GOES TO THE RIGHT. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/22/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: CHECK THE SWALE PLAN DETAIL, WATER FLOW TO THE LEFT. YOUR FINAL SURVEY SHOULD WATER GOES TO THE RIGHT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/18/2022 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION driveway is not formed correctly need to review the driveway culvert detail sheet to see how to form the driveways and footers and the mitered ends also the pipe needs to be set 8 foot off the edge of the pavement from the edge of the pavement to the center of the pipe and its over the 8 foot mark 3/3/22 - There are so many things wrong with this Pre Pour. Too many to list. As stated above carefully follow the Residential Culvert Detail that can be downloaded from the City Web site. The builder may want to schedule a site meet with an inspector to understand what is expected. This is Kalen Ruth (Inspector Territory) to wet to pass inspection pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/14/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION driveway is not formed correctly need to review the driveway culvert detail sheet to see how to form the driveways and footers and the mitered ends also the pipe needs to be set 8 foot off the edge of the pavement from the edge of the pavement to the center of the pipe and its over the 8 foot mark 3/3/22 - There are so many things wrong with this Pre Pour. Too many to list. As stated above carefully follow the Residential Culvert Detail that can be downloaded from the City Web site. The builder may want to schedule a site meet with an inspector to understand what is expected. This is Kalen Ruth (Inspector Territory) to wet to pass inspection | |||
| ROW- PRE-APRON (PRE-POUR) | 03/10/2022 | CANCELLED BY APPLICANT | KRUTH |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION driveway is not formed correctly need to review the driveway culvert detail sheet to see how to form the driveways and footers and the mitered ends also the pipe needs to be set 8 foot off the edge of the pavement from the edge of the pavement to the center of the pipe and its over the 8 foot mark 3/3/22 - There are so many things wrong with this Pre Pour. Too many to list. As stated above carefully follow the Residential Culvert Detail that can be downloaded from the City Web site. The builder may want to schedule a site meet with an inspector to understand what is expected. This is Kalen Ruth (Inspector Territory) | |||
| U - SEWER TIE IN | 03/10/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 03/10/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 03/03/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION driveway is not formed correctly need to review the driveway culvert detail sheet to see how to form the driveways and footers and the mitered ends also the pipe needs to be set 8 foot off the edge of the pavement from the edge of the pavement to the center of the pipe and its over the 8 foot mark 3/3/22 - There are so many things wrong with this Pre Pour. Too many to list. As stated above carefully follow the Residential Culvert Detail that can be downloaded from the City Web site. The builder may want to schedule a site meet with an inspector to understand what is expected. This is Kalen Ruth (Inspector Territory) | |||
| ROW- PRE-APRON (PRE-POUR) | 02/28/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: driveway is not formed correctly need to review the driveway culvert detail sheet to see how to form the driveways and footers and the mitered ends also the pipe needs to be set 8 foot off the edge of the pavement from the edge of the pavement to the center of the pipe and its over the 8 foot mark | |||
| ROW- PRE-APRON (PRE-POUR) | 02/22/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: THIS IS A REINSPECTION not formed at the time of the inspection and piles of dirt blocking the swale needs to be removed asap | |||
| ROW- PRE-APRON (PRE-POUR) | 02/15/2022 | Disapproved -FEE REQUIRED | KRUTH |
| Note: not formed at the time of the inspection | |||
| ELECTRIC - EARLY POWER | 01/31/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1:00 PM 1/31/22 | |||
| PEP TANK INSTALLATION REQUEST | 11/12/2021 | APPROVED | CSTONE |
| INSULATION | 10/15/2021 | APPROVED | FWILLIS |
| ALL ROUGH | 10/08/2021 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 Test not set up. PRESSURE TEST FOR SUPPLY LINES P2503.7 WATER SYSTEM TESTING. No water. Broken window in bath. Garage exterior lighting junction boxes not installed. | |||
| ALL ROUGH | 09/27/2021 | Disapproved - NO FEE | KSANDOE |
| Note: 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 Test not set up. PRESSURE TEST FOR SUPPLY LINES P2503.7 WATER SYSTEM TESTING. No water. Broken window in bath. Garage exterior lighting junction boxes not installed. | |||
| LATH/BRICK/ WATER BARRIER | 09/27/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/06/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION APPROVED PLANS ON SITE ARE IN POOR CONDITION AND MISSING PAGES. NEED A READABLE ORGANIZED SET OF PLANS ON SITE. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. | |||
| ROOF VALLEY & METAL | 06/30/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/30/2021 | Disapproved - NO FEE | FWILLIS |
| Note: APPROVED PLANS ON SITE ARE IN POOR CONDITION AND MISSING PAGES. NEED A READABLE ORGANIZED SET OF PLANS ON SITE. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/29/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/10/2021 | APPROVED | FWILLIS |
| WATER METER INSTALLATION REQUEST | 04/23/2021 | APPROVED | CSTONE |
| MONOLITHIC SLAB | 03/15/2021 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 03/12/2021 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/03/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED PORTABLE REST ROOM BY NEXT INSPECTIO |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 08/07/2022 | 08/07/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A termite certificate is required in accordance with the FBC - this is not a termite certificate. | |||
| ZON | COMPLETE | 06/29/2021 | 06/29/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/29/2021 | 06/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/14/2020 | 12/14/2020 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 12/14/2020 | 12/18/2020 |
| Note: Released By: CTROHA All issues on the checklist complete | |||
| SWALE | COMPLETE | 11/17/2020 | 11/18/2020 |
| Note: Released By: TBAKER | |||
| ENGIN1 | COMPLETE | 11/03/2020 | 11/04/2020 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 11/03/2020 | 11/03/2020 |
| Note: Held By: AMOBLEY Site plan does not show walkway access to front entry | |||
| BLD | COMPLETE | 11/03/2020 | 11/05/2020 |
| Note: Released By: JPI | |||
| PLUM | COMPLETE | 11/03/2020 | 11/05/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 11/03/2020 | 11/05/2020 |
| Note: Held By: CTROHA The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. | |||
| BLD | HOLD | 10/01/2020 | 10/05/2020 |
| Note: Held By: JPI 1. Product approval spec sheet is incomplete. Florida Door is noted as supplier of all doors and windows and is not. Please note proper manufacturer for all products. Also, no PA # listed for sectional/garage door, lintels, or HZ windows. 2. Page A-1 illustrates footing #2 at bedroom #2. It appears that is the garage footing. 3. Page A-1 does not illustrate a footing section thru front entry. 4. Page A-2 illustrates a cross section thru entire house labelled as detail 3 on page A-5. No such full section provided. Page A-5 provides a schematic sketch thru entry only. Clarify. 5. Please provide a window schedule to identify window call outs on page A-2. 6. Clarify “sun tunnel” on page A-2 in great room. This item may require listing on product approval. | |||
| CUSVC | COMPLETE | 10/01/2020 | 10/01/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/01/2020 | 10/01/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | HOLD | 10/01/2020 | 10/01/2020 |
| Note: Held By: TBAKER No benchmark on survey | |||
| LOCATE | COMPLETE | 10/01/2020 | 10/07/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | HOLD | 10/01/2020 | 10/05/2020 |
| Note: Held By: JPI 1. Vent thru roof for washing machine and laundry tub is not identified. 2. Vent method for kitchen sink is not identified. | |||
| SW1 | HOLD | 10/01/2020 | 10/05/2020 |
| Note: Held By: CTROHA An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. .An on-site, third order, easily identifiable benchmark referenced to NAVD 1988 (e.g. fire hydrant, nail in power pole.) Pavement nails will not be accepted as benchmarks.(D) The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) | |||
| UTL | COMPLETE | 10/01/2020 | 10/08/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 10/01/2020 | 10/02/2020 |
| Note: Held By: AMOBLEY Site plan does not show walkway access to front entry One more tree required for lot size. If in the natural area mark it on the landscape plan for review Per the LDC 13.03.03.C.3. "Windows shall be in harmony with and proportionate to the rest of the structure". The window on the left side of the home shown in the front elevation is not proportionate to the rest of the structure. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/05/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 08/05/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 08/05/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/05/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/05/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/05/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/05/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/05/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 08/04/2021 |
| METER - DEPOSIT | ¤60.00 | 12/19/2020 |
| WATER- TURN ON | ¤25.00 | 12/19/2020 |
| ADMIN FEE | ¤20.00 | 12/19/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/19/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 12/19/2020 |
| SEWER CREDIT | (¤1,466.00) | 12/19/2020 |
| SEWER INSPECTION | ¤25.00 | 12/19/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 12/19/2020 |
| BUILDING DISCOUNT 100% | (¤1,401.20) | 12/19/2020 |
| ELECTRIC FEE | ¤231.60 | 12/19/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 12/19/2020 |
| IMPACT FEE FIRE | ¤223.38 | 12/19/2020 |
| IMPACT FEE PARKS | ¤849.24 | 12/19/2020 |
| MECHANICAL FEE | ¤231.60 | 12/19/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/19/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/19/2020 |
| PLAN CHECK FEE | ¤114.40 | 12/19/2020 |
| PLUMBING FEE | ¤231.60 | 12/19/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤572.00 | 12/19/2020 |
| SITE PLAN 20 | ¤20.00 | 12/19/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/19/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 12/19/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/16/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 11/16/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 11/16/2020 |
| CONNECTION FEES | ¤1,002.88 | 11/16/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,320.35 |