Permit #2020100029
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01410-0080 |
| CONDITIONED SPACE: 2044 sqft |
| GARAGE: 635 sqft |
| OPENED PORCH (WITH ROOF) : 57 sqft |
| OPENED PORCH (WITH ROOF) : 260 sqft |
| Total Square Footage: 2996 sqft |
| Block: 01410 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 4 BILTWELL PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/09/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES, LLC |
|
Address 5220 SHAD ROAD #202 JACKSONVILLE, FL 32257 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/27/2021 | FINAL APPROVED | FWILLIS |
| ROW - STORMWATER FINAL | 04/27/2021 | APPROVED - AS NOTED | KRUTH |
| Note: porta john needs to be removed or on the driveway for final stormwater inspection corrections made # 6 site developement is going to remove the high area in the swale to let the water flow | |||
| U -UTILITY RESIDENTIAL FINAL | 04/27/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Pep tank not completed yet, called and advised sewer Dept. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/23/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/23/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 04/23/2021 | APPROVED | KRUTH |
| ELECTRIC - EARLY POWER | 03/29/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:30 | |||
| U-CROSS CONNECTION | 03/29/2021 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 03/29/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No IRR. No Cross CN. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/29/2021 | APPROVED - AS NOTED | KRUTH |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 03/24/2021 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 02/24/2021 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 02/24/2021 | APPROVED | FWILLIS |
| INSULATION | 02/23/2021 | APPROVED | FWILLIS |
| ALL ROUGH | 02/19/2021 | APPROVED - AS NOTED | FWILLIS |
| Note: Electrician Almost complete. I'll check Plates on Next Inspection. | |||
| ROOF VALLEY & METAL | 02/10/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/08/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 12/28/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/21/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 12/04/2020 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/01/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/01/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 10/16/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 12/23/2020 | 12/23/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 12/23/2020 | 12/28/2020 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 10/02/2020 | 11/19/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/01/2020 | 10/05/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/01/2020 | 10/07/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 10/01/2020 | 10/05/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 10/01/2020 | 10/05/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 10/01/2020 | 10/08/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 10/01/2020 | 10/05/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 10/09/2020 |
| WATER- TURN ON | ¤25.00 | 10/09/2020 |
| ADMIN FEE | ¤20.00 | 10/09/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/09/2020 |
| BUILDING DISCOUNT 100% | (¤1,317.20) | 10/09/2020 |
| ELECTRIC FEE | ¤219.60 | 10/09/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/09/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/09/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/09/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/09/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/09/2020 |
| MECHANICAL FEE | ¤219.60 | 10/09/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/09/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/09/2020 |
| PLAN CHECK FEE | ¤106.40 | 10/09/2020 |
| PLUMBING FEE | ¤219.60 | 10/09/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤532.00 | 10/09/2020 |
| SITE PLAN 20 | ¤20.00 | 10/09/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/09/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/09/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/09/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/09/2020 |
| SEWER INSPECTION | ¤25.00 | 10/09/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/09/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/09/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,476.35 |