Permit #2020100074
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00650-0090 |
| CONDITIONED SPACE: 1796 sqft |
| GARAGE: 525 sqft |
| OPENED PORCH (WITH ROOF) : 128 sqft |
| OPENED PORCH (WITH ROOF) : 34 sqft |
| Total Square Footage: 2483 sqft |
| Block: 00650 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 386-447-4151 |
| Location Address: 20 POSTWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/29/2020 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: BARBER TREVOR SCOTT & VERONICA MAE BARBER H&W |
|
Address 185 BIG BAY QUEENBURY, NY 12804 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
ERIC FRANCO
| Status | Location Address | State License Number | Phone |
| CANCEL |
840 DELTONA BLVD SUITE F-2 SANFORD, FL 32771 |
CCC1327280 (Exp: 08/31/2022) | 386-575-4007 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/18/2022 | FINAL APPROVED | KSANDOE |
| U-CROSS CONNECTION | 01/05/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/05/2022 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/30/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 11/30/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 11/30/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/30/2021 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 11/15/2021 | Disapproved - NO FEE | JMUNSON |
| Note: Main breaker needs to be installed | |||
| ELECTRIC - EARLY POWER | 11/15/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 11:21 am | |||
| ROW- PRE-APRON (PRE-POUR) | 10/15/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING | |||
| U - SEWER TIE IN | 09/15/2021 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 09/15/2021 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 08/17/2021 | APPROVED - AS NOTED | TCHURCHILL |
| Note: TEMP POWER IN WAY | |||
| LATH/BRICK/ WATER BARRIER | 07/28/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Two center columns front entry lath needs stapled 6" o.c. | |||
| LATH/BRICK/ WATER BARRIER | 07/23/2021 | Disapproved - NO FEE | JWALKER |
| Note: Two center columns front entry lath needs stapled 6" o.c. | |||
| INSULATION | 07/19/2021 | APPROVED | JWALKER |
| ALL ROUGH | 07/09/2021 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 05/19/2021 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/13/2021 | APPROVED - AS NOTED | JWALKER |
| Note: Bearing wall end studs attached to exterior walls Anchor bolts nuts need tightened down The tow t-18 trusses garage area are missing the MTS12 ties left side. Over framing at front entry. Ridge board needs supported and the strap nailed to the new support. Check above at all rough inspection. | |||
| TIE BEAM / LINTEL | 04/22/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 03/26/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/10/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/04/2021 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 12/30/2020 | APPROVED - AS NOTED | MMESSER |
| Note: clean out nesting material in meter box | |||
| WATER METER INSTALLATION REQUEST | 12/22/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/25/2021 | 03/25/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/25/2021 | 03/26/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| SW1 | COMPLETE | 10/26/2020 | 10/26/2020 |
| Note: Released By: CTROHA | |||
| BLD | COMPLETE | 10/26/2020 | 10/28/2020 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 10/05/2020 | 11/20/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 10/02/2020 | 10/06/2020 |
| Note: Held By: JPI 1. Identify width of separation wall between living space and garage. Page 4.0 illustrates a dimension however it appears incomplete graphically, 2x? wall. 2. Conventional framing roof valley detail on page 6.0. Provide size of ridge and rafter members, fastening of blocking, fastening of wind brace. Size, type and number of fasteners required. R301. | |||
| CUSVC | COMPLETE | 10/02/2020 | 10/05/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/02/2020 | 10/05/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/02/2020 | 10/05/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/02/2020 | 10/07/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/02/2020 | 10/05/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 10/02/2020 | 10/06/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 10/02/2020 | 10/05/2020 |
| Note: Held By: CTROHA Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) | |||
| UTL | COMPLETE | 10/02/2020 | 10/09/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 10/02/2020 | 10/05/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 01/19/2022 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/29/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/29/2020 |
| SEWER CREDIT | (¤650.00) | 10/29/2020 |
| SEWER INSPECTION | ¤25.00 | 10/29/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/29/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/29/2020 |
| METER - DEPOSIT | ¤60.00 | 10/29/2020 |
| METER - DEPOSIT | ¤60.00 | 10/29/2020 |
| WATER-METER | ¤434.59 | 10/29/2020 |
| WATER- TURN ON | ¤25.00 | 10/29/2020 |
| WATER- TURN ON | ¤25.00 | 10/29/2020 |
| ADMIN FEE | ¤20.00 | 10/29/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/29/2020 |
| BUILDING DISCOUNT 100% | (¤1,250.00) | 10/29/2020 |
| ELECTRIC FEE | ¤210.00 | 10/29/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/29/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/29/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/29/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/29/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/29/2020 |
| MECHANICAL FEE | ¤210.00 | 10/29/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/29/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/29/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/29/2020 |
| PLAN CHECK FEE | ¤100.00 | 10/29/2020 |
| PLUMBING FEE | ¤210.00 | 10/29/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤500.00 | 10/29/2020 |
| SITE PLAN 20 | ¤20.00 | 10/29/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/29/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/29/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,390.94 |