Permit #2020100151
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00600-0340 |
| CONDITIONED SPACE: 1701 sqft |
| GARAGE: 446 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 28 sqft |
| Total Square Footage: 2266 sqft |
| Block: 00600 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 386-931-1917 |
| Location Address: 40 POST TREE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/08/2020 |
| NOC: RECORDED |
| Applicant name: BRAD MICHAEL THOMAS |
| Owner: BORISENKO, YURIA |
|
Address 50 CLUBHOUSE DR PALM COAST, FL 32164 |
| Lot: 0340 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
THOMAS CONSULTING AND CONSTRUCTION LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
25 PINE DRIVE PALM COAST, FL 32164 |
STE 3C PALM COAST, FL 32164 |
CGC1506292 (Exp: 08/31/2026) | 386-585-4424 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/17/2022 | FINAL APPROVED | KSANDOE |
| Note: 11/4/2022 - PREVIOUS INSPECTION NOTES 11/3/2022 - PREVIOUS INSPECTION NOTES Must have energy calcs on site for inspection 11/4/22 Energy calcs on site missing product model numbers. Models numbers approved on uploaded duct layout PDF file do not match installed equipment. Please submit revised energy calcs with correct models numbers for review | |||
| ROW - STORMWATER FINAL | 11/04/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD 11/3/2022 - PREVIOUS INSPECTION NOTES 11/03/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE NEED TO RELOCATE THE TREE IN THE BACK YARD on the left side OUT OF THE DRAINAGE CONVEYANCE | |||
| BLD - BUILDING FINAL | 11/04/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: 11/3/2022 - PREVIOUS INSPECTION NOTES Must have energy calcs on site for inspection 11/4/22 Energy calcs on site missing product model numbers. Models numbers approved on uploaded duct layout PDF file do not match installed equipment. Please submit revised energy calcs with correct models numbers for review | |||
| BLD - BUILDING FINAL | 11/03/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Must have energy calcs on site for inspection | |||
| U -UTILITY RESIDENTIAL FINAL | 11/03/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 11/03/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 11/03/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INSPECTOR NOTE NEED TO RELOCATE THE TREE IN THE BACK YARD on the left side OUT OF THE DRAINAGE CONVEYANCE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/01/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: 11/1/22=correction were made 10/19/2022 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY DOES NOT MATCH THE SITE PLAN THE SITE PLAN SHOW THE DRAINAGE ON THE LEFT SIDE OF YOUR LOT GOING DOWN THE PROPERTY LINE AND THE FINAL SURVEY HAS A SWALE ON THE INSIDE OF THE LOT NEED TO REGRADE TO MAKE THE DRAINAGE GO DOWN THE PROPERTY LINE OR IF GRADING IS RIGHT NEED TO GET YOUR SURVEYOR TO SHOW IT ON THE PROPERTY LINE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/01/2022 | APPROVED | GBERTOLA |
| Note: | |||
| ROW - FINAL APRON (AFTER POUR) | 11/01/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/19/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE FINAL SURVEY DOES NOT MATCH THE SITE PLAN THE SITE PLAN SHOW THE DRAINAGE ON THE LEFT SIDE OF YOUR LOT GOING DOWN THE PROPERTY LINE AND THE FINAL SURVEY HAS A SWALE ON THE INSIDE OF THE LOT NEED TO REGRADE TO MAKE THE DRAINAGE GO DOWN THE PROPERTY LINE OR IF GRADING IS RIGHT NEED TO GET YOUR SURVEYOR TO SHOW IT ON THE PROPERTY LINE | |||
| U-CROSS CONNECTION | 10/11/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 08/26/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 07/27/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 07/27/2022 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 07/22/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Service wire does not meet 310.10(D)(2) ) Conductors and cables shall be covered with insulating material, such as tape or sleeving, that is listed, or listed and marked, as being sunlight resistant 7/22/22 Emailed FPL at 9:38 am | |||
| ELECTRIC - EARLY POWER | 07/19/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Service wire does not meet 310.10(D)(2) ) Conductors and cables shall be covered with insulating material, such as tape or sleeving, that is listed, or listed and marked, as being sunlight resistant | |||
| PEP TANK INSTALLATION REQUEST | 06/21/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 1/11/2022 9:27:31 AM exterior does not meet minimum requirements | |||
| LATH/BRICK/ WATER BARRIER | 06/16/2022 | APPROVED | KSANDOE |
| INSULATION | 12/06/2021 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 11/29/2021 | Disapproved - NO FEE | CSTONE |
| Note: exterior does not meet minimum requirements | |||
| ALL ROUGH | 11/24/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: old code cycle | |||
| ALL ROUGH | 11/23/2021 | Disapproved - NO FEE | KSANDOE |
| Note: Garage outlets have to be 12-2 wire | |||
| ROOF VALLEY & METAL | 08/16/2021 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/11/2021 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Roof sheating is not complete. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/04/2021 | Disapproved - NO FEE | JWALKER |
| Note: Roof sheating is not complete. | |||
| TIE BEAM / LINTEL | 02/01/2021 | APPROVED | MMESSER |
| FOUND SURVEY APPROVED (OFFICE) | 01/19/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/29/2020 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/16/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 11/05/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/15/2022 | 11/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/14/2021 | 01/19/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/14/2021 | 01/14/2021 |
| Note: Released By: AMOBLEY | |||
| MECH | COMPLETE | 11/19/2020 | 11/19/2020 |
| Note: Released By: CPISCITELLI | |||
| MECH | HOLD | 11/18/2020 | 11/18/2020 |
| Note: Held By: CPISCITELLI Energy calcs and EPL card need to be signed by the builder | |||
| SWALE | COMPLETE | 10/06/2020 | 11/23/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/05/2020 | 10/07/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/05/2020 | 10/05/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/05/2020 | 10/06/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/05/2020 | 10/06/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/05/2020 | 10/07/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/05/2020 | 10/06/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 10/05/2020 | 10/07/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 10/05/2020 | 10/05/2020 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 10/05/2020 | 10/06/2020 |
| Note: Released By: ELENS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 11/16/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/16/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/16/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/02/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 06/15/2022 |
| CONTRACTOR CHANGE | ¤120.00 | 06/15/2022 |
| BUILDING DISCOUNT 100% | (¤1,090.40) | 10/08/2020 |
| ELECTRIC FEE | ¤187.20 | 10/08/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/08/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/08/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/08/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/08/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/08/2020 |
| MECHANICAL FEE | ¤187.20 | 10/08/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/08/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/08/2020 |
| PLAN CHECK FEE | ¤84.80 | 10/08/2020 |
| PLUMBING FEE | ¤187.20 | 10/08/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤424.00 | 10/08/2020 |
| SITE PLAN 20 | ¤20.00 | 10/08/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/08/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/08/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/08/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/08/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/08/2020 |
| SEWER CREDIT | (¤650.00) | 10/08/2020 |
| SEWER INSPECTION | ¤25.00 | 10/08/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/08/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/08/2020 |
| METER - DEPOSIT | ¤60.00 | 10/08/2020 |
| WATER- TURN ON | ¤25.00 | 10/08/2020 |
| ADMIN FEE | ¤20.00 | 10/08/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,118.85 |