Permit #2020100241

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00690-0030
CONDITIONED SPACE: 1867 sqft
GARAGE: 409 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
Total Square Footage: 2304 sqft
Block: 00690
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 904-268-7730
Location Address: 4 LINDA PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/19/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES LLC

Address

5220 SHAD ROAD SUTE 202

JACKSONVILLE, FL 32257

Lot: 0030
Contracted Stated Job Value: ¤120,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/23/2021 FINAL APPROVED FWILLIS
ROW - FINAL APRON (AFTER POUR) 06/23/2021 APPROVED KRUTH
Note: CULVERT PIPE ELEVATION IS GOOD
ROW - STORMWATER FINAL 06/23/2021 APPROVED KRUTH
U -UTILITY RESIDENTIAL FINAL 06/23/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 06/18/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 06/17/2021 APPROVED GBERTOLA
ELECTRIC - EARLY POWER 05/24/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:30
ROW- PRE-APRON (PRE-POUR) 05/24/2021 APPROVED - AS NOTED KRUTH
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ELECTRIC - EARLY POWER 05/21/2021 Disapproved - NO FEE RMARTIN
Note: MISSING 3 GANG PLATE
U - SEWER TIE IN 05/19/2021 APPROVED JGIBSON
INSULATION 04/19/2021 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 04/15/2021 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 04/14/2021 APPROVED - AS NOTED CSTONE
Note: DUMPSTER WILL NEED TO MOVE
ALL ROUGH 04/13/2021 APPROVED FWILLIS
ROOF VALLEY & METAL 04/12/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/25/2021 APPROVED FWILLIS
U-CROSS CONNECTION 03/18/2021 APPROVED - AS NOTED DHANEY
Note: Approved No IRR, No Cross CN.
FOUND SURVEY APPROVED (OFFICE) 03/10/2021 APPROVED TBAKER
TIE BEAM / LINTEL 02/16/2021 APPROVED FWILLIS
MONOLITHIC SLAB 02/08/2021 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 02/04/2021 APPROVED JGIBSON
GRAVITY SEWER TEST 02/04/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 11/12/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN HOLD 06/23/2021 06/23/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO TERMITE.PDF
BADMIN COMPLETE 06/23/2021 06/23/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ZON COMPLETE 03/09/2021 03/09/2021
Note: Released By: ALISHA MOBLEY - (386)986-4733 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/09/2021 03/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
MECH COMPLETE 10/15/2020 10/16/2020
Note: Released By: CPISCITELLI
SWALE COMPLETE 10/07/2020 11/25/2020
Note: Released By: TBAKER
SW1 COMPLETE 10/07/2020 10/07/2020
Note: Released By: GBERTOLA
ZON COMPLETE 10/06/2020 10/07/2020
Note: Released By: ELENS
BLD COMPLETE 10/06/2020 10/08/2020
Note: Released By: JPI
CUSVC COMPLETE 10/06/2020 10/07/2020
Note: Released By: HHAND
ELEC COMPLETE 10/06/2020 10/07/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/06/2020 10/07/2020
Note: Released By: TBAKER
LOCATE COMPLETE 10/06/2020 10/08/2020
Note: Released By: CSTONE
MECH HOLD 10/06/2020 10/07/2020
Note: Held By: CPISCITELLI 1. Orientation of heatload does not match the site plan. Revise to match the site plan. 2. R403.7.1.2.1 FBC Energy Conservation 2017 6TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated. Provide Manual S showing reduced equipment capacity or choose different equipment and revise heatload.
PLUM COMPLETE 10/06/2020 10/08/2020
Note: Released By: JPI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 10/19/2020
WATER- TURN ON ¤25.00 10/19/2020
ADMIN FEE ¤20.00 10/19/2020
CONNECTION FEES ¤1,002.88 10/19/2020
BUILDING DISCOUNT 100% (¤1,145.00) 10/19/2020
ELECTRIC FEE ¤195.00 10/19/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/19/2020
IMPACT FEE FIRE ¤223.38 10/19/2020
IMPACT FEE PARKS ¤849.24 10/19/2020
IMPACT FEE SCHOOL ¤3,600.00 10/19/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 10/19/2020
MECHANICAL FEE ¤195.00 10/19/2020
WATER -IRRIGATION INSPECTION ¤25.00 10/19/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/19/2020
PLAN CHECK FEE ¤90.00 10/19/2020
PLUMBING FEE ¤195.00 10/19/2020
NEW RESIDENTIAL INSPECTIONS ¤450.00 10/19/2020
SITE PLAN 20 ¤20.00 10/19/2020
SURCHARGE FS 533.721 ¤2.00 10/19/2020
SURCHARGE - FS 468.631 ¤2.00 10/19/2020
STORM WATER PERMIT FEES ¤80.00 10/19/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 10/19/2020
SEWER CREDIT (¤1,700.00) 10/19/2020
SEWER INSPECTION ¤25.00 10/19/2020
SEWER CAPITAL FACILITY ¤4,596.07 10/19/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 10/19/2020
Fees Total Due: ¤0.00 Total Paid: ¤13,776.35