I want to search for...

Permit #2020100296

Permit Details

Status: COED

Parcel Id: 07-11-31-7027-00090-0320
CONDITIONED SPACE: 1917 sqft
OPENED PORCH (WITH ROOF) : 59 sqft
OPENED PORCH (WITH ROOF) : 335 sqft
GARAGE: 443 sqft
Total Square Footage: 2754 sqft
Block: 00090
Subdivision: 2128 - SECTION 27-WYNNFIELD
Job Phone: 386-627-0430
Location Address: 15 WOODSTONE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/13/2020
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: ANDREW CHOCHEV & ANNA BALDYGA

Address

32 PINE CEDAR DR

PALM COAST, FL 32164

Lot: 0320
Contracted Stated Job Value: ¤200,000.00
Job Description: BUILD NEW SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945
THOMAS WALTER ALBANO
Status Location Address State License Number Phone Fax
INACTIVE

P. O. BOX 352075

Palm Coast, FL 32135

CFC045991 (Exp: 08/31/2024) 386-437-2795 (386)437-2781

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/06/2021 FINAL APPROVED MMESSER
Note: THIS IS A REINSPECTION HVAC calls for a 45amp min breaker and 50 amp max. Panenl box has a 40 amp installed. The kitchen needs to be supplied with (2) - 20amp GFIC protected small appliance branch circuts.
U -UTILITY RESIDENTIAL FINAL 06/28/2021 FINAL APPROVED LFITZGERALD
BLD - BUILDING FINAL 06/28/2021 Disapproved - NO FEE JWALKER
Note: HVAC calls for a 45amp min breaker and 50 amp max. Panenl box has a 40 amp installed. The kitchen needs to be supplied with (2) - 20amp GFIC protected small appliance branch circuts.
U-CROSS CONNECTION 06/16/2021 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation
ROW - FINAL APRON (AFTER POUR) 06/16/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 06/16/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 06/16/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 06/15/2021 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- PRE-APRON (PRE-POUR) 04/29/2021 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
U - SEWER TIE IN 04/20/2021 APPROVED - AS NOTED JGIBSON
Note: THIS WAS APPROVED ON 4/16/21
GRAVITY SEWER TEST 04/20/2021 APPROVED - AS NOTED JGIBSON
Note: THIS WAS APPROVED ON 4/17/21
ELECTRIC - EARLY POWER 04/16/2021 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION missing outlet covers through out house. Needs to be safed off 4/16/21 EMAILED FPL RELEASED POWER 11:25
ELECTRIC - EARLY POWER 04/13/2021 Disapproved - NO FEE RMARTIN
Note: missing outlet covers through out house. Needs to be safed off
INSULATION 03/11/2021 APPROVED JBODEN
LATH/BRICK/ WATER BARRIER 03/11/2021 APPROVED JBODEN
ALL ROUGH 03/08/2021 APPROVED MMESSER
ELECTRIC-TUG 02/12/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:10
ROOF VALLEY & METAL 01/29/2021 APPROVED MMESSER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/26/2021 APPROVED MMESSER
Note: THIS IS A REINSPECTION Nails missing from buckets @ T06-T12 SP1 missing @ garage wall Secure rat run in garage Remove shiners and re-nail sheathing Bracing missing @ T17
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/25/2021 Disapproved -FEE REQUIRED JBODEN
Note: Nails missing from buckets @ T06-T12 SP1 missing @ garage wall Secure rat run in garage Remove shiners and re-nail sheathing Bracing missing @ T17
TIE BEAM / LINTEL 01/12/2021 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 01/11/2021 APPROVED TBAKER
MONOLITHIC SLAB 12/22/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Marked on plans: Look for plan cross section"2" at entryway. Plans call for additional bar
MONOLITHIC SLAB 12/21/2020 Disapproved - NO FEE TSTAUFFACHER
Note: Marked on plans: Look for plan cross section"2" at entryway. Plans call for additional bar
PLUMBING 1ST ROUGH UNDERGROUND 12/15/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 11/03/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/08/2021 01/11/2021
Note: Released By: TBAKER
ZON COMPLETE 01/08/2021 01/08/2021
Note: Released By: AMOBLEY
BLD COMPLETE 10/13/2020 10/13/2020
Note: Released By: JBODEN
SWALE COMPLETE 10/08/2020 11/30/2020
Note: Released By: TBAKER
BLD HOLD 10/07/2020 10/12/2020
Note: Held By: JPI 1. Conventional typical roof valley detail on page 7.0. Provide fastening detail of: collar tie to rafters, ridge to roof and last truss and rafter to ridge board. 2. Provide a window and door schedule. 3. Incorrect address on truss drawings.
CUSVC COMPLETE 10/07/2020 10/07/2020
Note: Released By: HHAND
ELEC COMPLETE 10/07/2020 10/08/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/07/2020 10/08/2020
Note: Released By: TBAKER
LOCATE COMPLETE 10/07/2020 10/08/2020
Note: Released By: CSTONE
MECH COMPLETE 10/07/2020 10/08/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 10/07/2020 10/12/2020
Note: Released By: JPI
SW1 COMPLETE 10/07/2020 10/08/2020
Note: Released By: CTROHA
ZON COMPLETE 10/07/2020 10/08/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/06/2021
NEW RESIDENTIAL INSPECTIONS ¤494.00 10/13/2020
SITE PLAN 20 ¤20.00 10/13/2020
SURCHARGE FS 533.721 ¤2.00 10/13/2020
SURCHARGE - FS 468.631 ¤2.00 10/13/2020
STORM WATER PERMIT FEES ¤80.00 10/13/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 10/13/2020
SEWER CREDIT (¤1,147.00) 10/13/2020
SEWER INSPECTION ¤25.00 10/13/2020
SEWER CAPITAL FACILITY ¤4,596.07 10/13/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 10/13/2020
METER - DEPOSIT ¤60.00 10/13/2020
WATER- TURN ON ¤25.00 10/13/2020
ADMIN FEE ¤20.00 10/13/2020
CONNECTION FEES ¤1,002.88 10/13/2020
BUILDING DISCOUNT 100% (¤1,237.40) 10/13/2020
ELECTRIC FEE ¤208.20 10/13/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/13/2020
IMPACT FEE FIRE ¤223.38 10/13/2020
IMPACT FEE PARKS ¤849.24 10/13/2020
IMPACT FEE SCHOOL ¤3,600.00 10/13/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 10/13/2020
MECHANICAL FEE ¤208.20 10/13/2020
WATER -IRRIGATION INSPECTION ¤25.00 10/13/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/13/2020
PLAN CHECK FEE ¤98.80 10/13/2020
PLUMBING FEE ¤208.20 10/13/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,369.35