I want to search for...
Permit #2020100296
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00090-0320 |
| CONDITIONED SPACE: 1917 sqft |
| OPENED PORCH (WITH ROOF) : 59 sqft |
| OPENED PORCH (WITH ROOF) : 335 sqft |
| GARAGE: 443 sqft |
| Total Square Footage: 2754 sqft |
| Block: 00090 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 386-627-0430 |
| Location Address: 15 WOODSTONE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/13/2020 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: ANDREW CHOCHEV & ANNA BALDYGA |
|
Address 32 PINE CEDAR DR PALM COAST, FL 32164 |
| Lot: 0320 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: BUILD NEW SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/06/2021 | FINAL APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION HVAC calls for a 45amp min breaker and 50 amp max. Panenl box has a 40 amp installed. The kitchen needs to be supplied with (2) - 20amp GFIC protected small appliance branch circuts. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/28/2021 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 06/28/2021 | Disapproved - NO FEE | JWALKER |
| Note: HVAC calls for a 45amp min breaker and 50 amp max. Panenl box has a 40 amp installed. The kitchen needs to be supplied with (2) - 20amp GFIC protected small appliance branch circuts. | |||
| U-CROSS CONNECTION | 06/16/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation | |||
| ROW - FINAL APRON (AFTER POUR) | 06/16/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/16/2021 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 06/16/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 06/15/2021 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- PRE-APRON (PRE-POUR) | 04/29/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| U - SEWER TIE IN | 04/20/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS APPROVED ON 4/16/21 | |||
| GRAVITY SEWER TEST | 04/20/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS APPROVED ON 4/17/21 | |||
| ELECTRIC - EARLY POWER | 04/16/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION missing outlet covers through out house. Needs to be safed off 4/16/21 EMAILED FPL RELEASED POWER 11:25 | |||
| ELECTRIC - EARLY POWER | 04/13/2021 | Disapproved - NO FEE | RMARTIN |
| Note: missing outlet covers through out house. Needs to be safed off | |||
| INSULATION | 03/11/2021 | APPROVED | JBODEN |
| LATH/BRICK/ WATER BARRIER | 03/11/2021 | APPROVED | JBODEN |
| ALL ROUGH | 03/08/2021 | APPROVED | MMESSER |
| ELECTRIC-TUG | 02/12/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:10 | |||
| ROOF VALLEY & METAL | 01/29/2021 | APPROVED | MMESSER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/26/2021 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION Nails missing from buckets @ T06-T12 SP1 missing @ garage wall Secure rat run in garage Remove shiners and re-nail sheathing Bracing missing @ T17 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/25/2021 | Disapproved -FEE REQUIRED | JBODEN |
| Note: Nails missing from buckets @ T06-T12 SP1 missing @ garage wall Secure rat run in garage Remove shiners and re-nail sheathing Bracing missing @ T17 | |||
| TIE BEAM / LINTEL | 01/12/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 01/11/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/22/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Marked on plans: Look for plan cross section"2" at entryway. Plans call for additional bar | |||
| MONOLITHIC SLAB | 12/21/2020 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Marked on plans: Look for plan cross section"2" at entryway. Plans call for additional bar | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/15/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 11/03/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/08/2021 | 01/11/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/08/2021 | 01/08/2021 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 10/13/2020 | 10/13/2020 |
| Note: Released By: JBODEN | |||
| SWALE | COMPLETE | 10/08/2020 | 11/30/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 10/07/2020 | 10/12/2020 |
| Note: Held By: JPI 1. Conventional typical roof valley detail on page 7.0. Provide fastening detail of: collar tie to rafters, ridge to roof and last truss and rafter to ridge board. 2. Provide a window and door schedule. 3. Incorrect address on truss drawings. | |||
| CUSVC | COMPLETE | 10/07/2020 | 10/07/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/07/2020 | 10/08/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/07/2020 | 10/08/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/07/2020 | 10/08/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/07/2020 | 10/08/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 10/07/2020 | 10/12/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 10/07/2020 | 10/08/2020 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 10/07/2020 | 10/08/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/06/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 10/13/2020 |
| SITE PLAN 20 | ¤20.00 | 10/13/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/13/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/13/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/13/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/13/2020 |
| SEWER CREDIT | (¤1,147.00) | 10/13/2020 |
| SEWER INSPECTION | ¤25.00 | 10/13/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/13/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/13/2020 |
| METER - DEPOSIT | ¤60.00 | 10/13/2020 |
| WATER- TURN ON | ¤25.00 | 10/13/2020 |
| ADMIN FEE | ¤20.00 | 10/13/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/13/2020 |
| BUILDING DISCOUNT 100% | (¤1,237.40) | 10/13/2020 |
| ELECTRIC FEE | ¤208.20 | 10/13/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/13/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/13/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/13/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/13/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/13/2020 |
| MECHANICAL FEE | ¤208.20 | 10/13/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/13/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/13/2020 |
| PLAN CHECK FEE | ¤98.80 | 10/13/2020 |
| PLUMBING FEE | ¤208.20 | 10/13/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,369.35 |