I want to search for...

Permit #2020100451

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00680-0080
CONDITIONED SPACE: 2208 sqft
GARAGE: 933 sqft
OPENED PORCH (WITH ROOF) : 162 sqft
OPENED PORCH (WITH ROOF) : 35 sqft
Total Square Footage: 3338 sqft
Block: 00680
Subdivision: -
Job Phone: (386) 246-6123
Location Address: 131 ULYSSES TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/20/2020
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES LLC

Address

185 CYPRESS POINT PLAKWAY SUITE 7

PALM COAST , FL 32164

Lot: 0080
Contracted Stated Job Value: ¤241,453.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/03/2021 FINAL APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Termite treatment sticker not on exterior of electrical panel. No hot water. vaccum breaker missing on hose bib.
BLD - BUILDING FINAL 04/27/2021 Disapproved - NO FEE JWALKER
Note: Termite treatment sticker not on exterior of electrical panel. No hot water. vaccum breaker missing on hose bib.
U-CROSS CONNECTION 04/23/2021 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW - FINAL APRON (AFTER POUR) 04/21/2021 APPROVED RGROSS
ROW - STORMWATER FINAL 04/21/2021 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 04/21/2021 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 04/20/2021 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 04/20/2021 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 03/22/2021 APPROVED - AS NOTED GBERTOLA
Note: I WOULD ADD A FORM BOARD TO THE BOTTOM OF THE END OF THE MITER ON THE LEFT SIDE SO CONCRETE DOES NOT GET POURED INTO THE SWALE. AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
ELECTRIC - EARLY POWER 03/03/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:21 am
GRAVITY SEWER TEST 02/22/2021 APPROVED JGIBSON
U - SEWER TIE IN 02/22/2021 APPROVED JGIBSON
ALL ROUGH 01/25/2021 CANCELLED BY APPLICANT WEB
INSULATION 01/21/2021 APPROVED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 01/20/2021 APPROVED TSTAUFFACHER
ALL ROUGH 01/19/2021 APPROVED - AS NOTED JBODEN
Note: 5ft of head pressure needed Check at insulation
ROOF VALLEY & METAL 01/11/2021 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/06/2021 APPROVED TSTAUFFACHER
TIE BEAM / LINTEL 12/22/2020 APPROVED WMILLER
FOUND SURVEY APPROVED (OFFICE) 12/18/2020 APPROVED TBAKER
MONOLITHIC SLAB 12/03/2020 APPROVED WMILLER
Note: THIS IS A REINSPECTION No plans in box 12-3-2020... approved
MONOLITHIC SLAB 12/02/2020 Disapproved - NO FEE TSTAUFFACHER
Note: No plans in box
PLUMBING 1ST ROUGH UNDERGROUND 11/30/2020 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 11/19/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 03/05/2021 03/08/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/16/2020 12/17/2020
Note: Released By: TBAKER
ZON COMPLETE 12/16/2020 12/16/2020
Note: Released By: TDOAK
BLD COMPLETE 12/15/2020 12/22/2020
Note: Released By: FREODICA Revision - added screen enclosure at lanai.
ZON COMPLETE 10/16/2020 10/20/2020
Note: Released By: AMOBLEY
ZON HOLD 10/14/2020 10/15/2020
Note: Held By: ELENS Repeat Comment: Please fix FEMA map number on the survey...(....0233E) (The correction only included a site plan submittal, but not a corrected survey. Please correct and resubmit the survey.)
SW1 COMPLETE 10/14/2020 10/14/2020
Note: Released By: CTROHA
UTL COMPLETE 10/14/2020 10/16/2020
Note: Released By: LFITZGERALD
ENGIN1 COMPLETE 10/14/2020 10/15/2020
Note: Released By: TBAKER
SWALE COMPLETE 10/13/2020 12/03/2020
Note: Released By: TBAKER
BLD COMPLETE 10/09/2020 10/13/2020
Note: Released By: JPI
CUSVC COMPLETE 10/09/2020 10/12/2020
Note: Released By: HHAND
ELEC COMPLETE 10/09/2020 10/12/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/09/2020 10/13/2020
Note: Released By: TBAKER
LOCATE COMPLETE 10/09/2020 10/14/2020
Note: Released By: CSTONE
MECH COMPLETE 10/09/2020 10/12/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 10/09/2020 10/13/2020
Note: Released By: JPI
SW1 HOLD 10/09/2020 10/14/2020
Note: Held By: CTROHA The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) See marked site plan
ZON HOLD 10/09/2020 10/12/2020
Note: Held By: ELENS Please fix FEMA map number on the survey and site plan. (....0233E) Seven trees are required for this site. (Need one more.)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 05/03/2021
SITE PLAN 20 ¤20.00 10/20/2020
SURCHARGE FS 533.721 ¤2.00 10/20/2020
SURCHARGE - FS 468.631 ¤2.00 10/20/2020
STORM WATER PERMIT FEES ¤80.00 10/20/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 10/20/2020
SEWER CREDIT (¤850.00) 10/20/2020
SEWER INSPECTION ¤25.00 10/20/2020
SEWER CAPITAL FACILITY ¤4,596.07 10/20/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 10/20/2020
METER - DEPOSIT ¤60.00 10/20/2020
WATER- TURN ON ¤25.00 10/20/2020
ADMIN FEE ¤20.00 10/20/2020
CONNECTION FEES ¤1,002.88 10/20/2020
BUILDING DISCOUNT 100% (¤1,426.40) 10/20/2020
ELECTRIC FEE ¤235.20 10/20/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/20/2020
IMPACT FEE FIRE ¤223.38 10/20/2020
IMPACT FEE PARKS ¤849.24 10/20/2020
IMPACT FEE SCHOOL ¤3,600.00 10/20/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 10/20/2020
MECHANICAL FEE ¤235.20 10/20/2020
WATER -IRRIGATION INSPECTION ¤25.00 10/20/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/20/2020
PLAN CHECK FEE ¤116.80 10/20/2020
PLUMBING FEE ¤235.20 10/20/2020
NEW RESIDENTIAL INSPECTIONS ¤584.00 10/20/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,666.35