Permit #2020100497

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00240-0090
CONDITIONED SPACE: 2117 sqft
GARAGE: 701 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
OPENED PORCH (WITH ROOF) : 186 sqft
Total Square Footage: 3042 sqft
Block: 00240
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: (386)437-1508
Location Address: 5 LYNTON PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/17/2020
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: INTRACOASTAL PROPERTIES V LLC

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0090
Contracted Stated Job Value: ¤180,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JAMES CRAIG FISHER
Status Location Address State License Number Phone
ACTIVE

PO BOX 451

BUNNELL, FL 32110

CAC1819807 (Exp: 08/31/2026) 386-222-9549
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/27/2021 FINAL APPROVED DCUSHING
U-CROSS CONNECTION 10/20/2021 APPROVED DHANEY
U -UTILITY RESIDENTIAL FINAL 10/20/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 10/19/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 10/19/2021 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 10/19/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 10/19/2021 APPROVED KRUTH
ROW- PRE-APRON (PRE-POUR) 08/06/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. nothing done there is a hump in the middle of the pipe now and the right side is over a inch and a half low corrections made
ROW- PRE-APRON (PRE-POUR) 08/04/2021 Disapproved -FEE REQUIRED KRUTH
Note: THIS IS A REINSPECTION the right side of the pipe is about an inch to low it is out of tolerance nothing done there is a hump in the middle of the pipe now and the right side is over a inch and a half low
ROW- PRE-APRON (PRE-POUR) 08/03/2021 Disapproved -FEE REQUIRED KRUTH
Note: the right side of the pipe is about an inch to low it is out of tolerance
ELECTRIC - EARLY POWER 07/30/2021 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:23 am
GRAVITY SEWER TEST 07/28/2021 APPROVED JGIBSON
U - SEWER TIE IN 07/28/2021 APPROVED JGIBSON
WINDOW NAILING 07/06/2021 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 06/18/2021 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 06/11/2021 APPROVED FWILLIS
INSULATION 06/07/2021 APPROVED - AS NOTED FWILLIS
Note: WINDOW INSPECTION NEEDED BEFORE FINAL.
ALL ROUGH 05/25/2021 APPROVED - AS NOTED FWILLIS
Note: FRONT RIGHT WINDOW MISSING WILL CHECK ON INSULATION.
ALL ROUGH 05/21/2021 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 05/13/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/29/2021 APPROVED FWILLIS
TIE BEAM / LINTEL 03/25/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 03/22/2021 APPROVED TBAKER
MONOLITHIC SLAB 03/01/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION footing ground needs to be attached prior to inspection. Need compaction test cert Column dowels need to be tied 3/1/21 - Items Corrected
MONOLITHIC SLAB 02/26/2021 Disapproved -FEE REQUIRED JBODEN
Note: footing ground needs to be attached prior to inspection. Need compaction test cert Column dowels need to be tied
PLUMBING 1ST ROUGH UNDERGROUND 02/18/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 01/26/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/19/2021 03/22/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
ZON COMPLETE 03/19/2021 03/19/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 12/11/2020 12/16/2020
Note: Released By: KRUTH
ENGIN1 COMPLETE 12/11/2020 12/14/2020
Note: Released By: TBAKER
ZON COMPLETE 12/11/2020 12/11/2020
Note: Released By: AMOBLEY
SW1 HOLD 11/20/2020 11/20/2020
Note: Held By: CTROHA Held By: CTROHA Revise site plan with elevations 10' from structure showing 5% to meet building code and upload site plan named Revise Site Plan Area that needs addressed is at the back of the house arrows at about 10' need proposed elevations
ZON COMPLETE 11/20/2020 11/20/2020
Note: Released By: AMOBLEY
SW1 HOLD 11/18/2020 11/18/2020
Note: Held By: CTROHA Revise site plan with elevations 10' from structure showing 5% to meet building code and upload site plan named Revise Site Plan
ZON COMPLETE 11/18/2020 11/19/2020
Note: Released By: AMOBLEY
SW1 HOLD 11/17/2020 11/17/2020
Note: Held By: GBERTOLA Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.E )E.Florida Building Code, Residential, Chapter 4, R401. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. (D) D.Florida Building Code, Residential, Chapter 4, R404.1.6E.
MECH COMPLETE 11/10/2020 11/10/2020
Note: Released By: CPISCITELLI
ZON COMPLETE 11/10/2020 11/10/2020
Note: Released By: AMOBLEY
BADMIN COMPLETE 11/10/2020 11/10/2020
Note: Released By: LMUSGROVE
BADMIN HOLD 10/27/2020 10/27/2020
Note: Held By: STHOMAS PLEASE SUBMIT ALL HOLDS
MECH HOLD 10/26/2020 10/26/2020
Note: Held By: CPISCITELLI 1. Square footage on Energy calcs and heatload does not match the floor plan. Revise to correct square footage. 2. Energy Calcs and EPL card need to be signed by the builder. 3. Duct layout needs to be signed by the AC contractor (SECOND REQUEST)
ZON HOLD 10/26/2020 10/27/2020
Note: Held By: AMOBLEY Big leaf magnolia is not considered a shade tree. Need at least one shade tree for this lot.
SW1 HOLD 10/26/2020 10/26/2020
Note: Held By: CTROHA Still waiting for corrections
SWALE COMPLETE 10/13/2020 12/07/2020
Note: Released By: TBAKER
BLD COMPLETE 10/12/2020 10/15/2020
Note: Released By: JPI
CUSVC COMPLETE 10/12/2020 10/15/2020
Note: Released By: HHAND
ELEC COMPLETE 10/12/2020 10/13/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/12/2020 10/13/2020
Note: Released By: TBAKER
LOCATE COMPLETE 10/12/2020 10/14/2020
Note: Released By: CSTONE
MECH HOLD 10/12/2020 10/13/2020
Note: Held By: CPISCITELLI 1. Square footage on Energy calcs and heatload does not match the floor plan. Revise to correct square footage. 2. Energy Calcs and EPL card need to be signed by the builder. 3. Duct layout needs to be signed by the AC contractor
PLUM COMPLETE 10/12/2020 10/15/2020
Note: Released By: JPI
SW1 HOLD 10/12/2020 10/16/2020
Note: Held By: CTROHA See uploaded Stormwater checklist in attachments for correction. Unchecked items need to be addressed
ZON HOLD 10/12/2020 10/13/2020
Note: Held By: AMOBLEY House does not meet the minimum side setback of 7.5ft Please specify type of magnolias being planted on landscape plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - FIELD SURVEY INSPECT ¤20.00 10/27/2021
SW ENG REINSPECTION 30 ¤30.00 10/27/2021
SW ENG REINSPECTION 30 ¤30.00 10/27/2021
REINSPECTION FEE ¤40.00 10/27/2021
NEW RESIDENTIAL INSPECTIONS ¤546.00 12/17/2020
SITE PLAN 20 ¤20.00 12/17/2020
SURCHARGE FS 533.721 ¤2.00 12/17/2020
SURCHARGE - FS 468.631 ¤2.00 12/17/2020
STORM WATER PERMIT FEES ¤80.00 12/17/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 12/17/2020
SEWER CREDIT (¤2,932.00) 12/17/2020
SEWER INSPECTION ¤25.00 12/17/2020
SEWER CAPITAL FACILITY ¤4,664.55 12/17/2020
WATER CAPITAL FACILITY FEE ¤3,424.45 12/17/2020
METER - DEPOSIT ¤60.00 12/17/2020
WATER- TURN ON ¤25.00 12/17/2020
ADMIN FEE ¤20.00 12/17/2020
CONNECTION FEES ¤1,017.83 12/17/2020
BUILDING DISCOUNT 100% (¤1,346.60) 12/17/2020
ELECTRIC FEE ¤223.80 12/17/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 12/17/2020
IMPACT FEE FIRE ¤223.38 12/17/2020
IMPACT FEE PARKS ¤849.24 12/17/2020
IMPACT FEE SCHOOL ¤3,600.00 12/17/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 12/17/2020
MECHANICAL FEE ¤223.80 12/17/2020
WATER -IRRIGATION INSPECTION ¤25.00 12/17/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 12/17/2020
PLAN CHECK FEE ¤109.20 12/17/2020
PLUMBING FEE ¤223.80 12/17/2020
Fees Total Due: ¤0.00 Total Paid: ¤12,798.05