Permit #2020100541

Permit Details

Status: COED

Parcel Id: 21-10-30-5410-00000-1740
CONDITIONED SPACE: 2151 sqft
GARAGE: 436 sqft
OPENED PORCH (WITH ROOF) : 27 sqft
OPENED PORCH (WITH ROOF) : 157 sqft
Total Square Footage: 2771 sqft
Subdivision: 2135 - SAWMILL CREEK SUBDIVISION
Job Phone: 904-268-7730
Location Address: 132 OAKLEAF WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/23/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES, LLC

Address

5220 SHAD ROAD

JACKSONVILLE, FL 32257

Address

STE 202

JACKSONVILLE, FL 32257

Lot: 174
Contracted Stated Job Value: ¤120,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
JEFFREY R OESCHGER
Status Location Address State License Number
INACTIVE

4237 HOLDEN ROAD

LAKELAND, FL 33811

CFC1429768 (Exp: 08/31/2024)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/30/2021 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION Toilets not installed, multiple trades and people in dwelling.
BLD - BUILDING FINAL 04/29/2021 Disapproved -FEE REQUIRED FWILLIS
Note: Toilets not installed, multiple trades and people in dwelling.
U -UTILITY RESIDENTIAL FINAL 04/29/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 04/08/2021 APPROVED - AS NOTED KRUTH
Note: THIS IS A REINSPECTION Water ponding in the rear center and the rear left side of the building. 4/8/21 Corrections made in ellevations of sod
ROW - STORMWATER FINAL 04/08/2021 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 04/08/2021 APPROVED KRUTH
ROW FIELD SURVEY /GRADING CERTIFICATION 03/25/2021 Disapproved - NO FEE RGROSS
Note: Water ponding in the rear center and the rear left side of the building. Also there should have been a common swale along the left side property line.
FINAL SURVEY (OFFICE USE ONLY) 03/25/2021 APPROVED RGROSS
U-CROSS CONNECTION 03/17/2021 APPROVED DHANEY
ELECTRIC - EARLY POWER 03/15/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEAAED POWER 10:10
ROW - FINAL APRON (AFTER POUR) 02/26/2021 Disapproved -FEE REQUIRED KRUTH
Note: no final survey submitted final survey after pour stormwater final
ROW- PRE-APRON (PRE-POUR) 02/24/2021 APPROVED - AS NOTED KRUTH
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
INSULATION 02/10/2021 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 02/09/2021 APPROVED FWILLIS
ALL ROUGH 02/08/2021 APPROVED FWILLIS
ROOF VALLEY & METAL 01/28/2021 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/21/2021 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/20/2021 CANCELLED BY APPLICANT FWILLIS
TIE BEAM / LINTEL 12/22/2020 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 12/22/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Dowel not Drilled & Epoxied in rear, marked in orange on wall. Window Sill Bed Joint Exceeds FBC R606.3.1 (3/8" to 1/2) 12/22/20 - Items corrected.
TIE BEAM / LINTEL 12/21/2020 Disapproved - NO FEE FWILLIS
Note: Dowel not Drilled & Epoxied in rear, marked in orange on wall. Window Sill Bed Joint Exceeds FBC R606.3.1 (3/8" to 1/2)
TIE BEAM / LINTEL 12/21/2020 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 12/21/2020 APPROVED TBAKER
MONOLITHIC SLAB 12/08/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION MISSING UFER GROUND .NEC..250.52(3)
MONOLITHIC SLAB 12/07/2020 Disapproved - NO FEE FWILLIS
Note: MISSING UFER GROUND .NEC..250.52(3)
GRAVITY SEWER TEST 12/01/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION NOT RAN YET
U - SEWER TIE IN 12/01/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION NOT RAN YET
U - SEWER TIE IN 11/24/2020 Disapproved - NO FEE JGIBSON
Note: NOT RAN YET
PLUMBING 1ST ROUGH UNDERGROUND 11/24/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 11/24/2020 Disapproved - NO FEE JGIBSON
Note: NOT RAN YET
WATER METER INSTALLATION REQUEST 11/09/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 12/18/2020 12/21/2020
Note: Released By: TBAKER
ZON COMPLETE 12/18/2020 12/18/2020
Note: Released By: AMOBLEY
PLUM COMPLETE 12/03/2020 12/08/2020
Note: Released By: FREODICA Correction to revision - changed plumbing riser.
BADMIN HOLD 12/03/2020 12/03/2020
Note: Held By: STHOMAS MUST ANSWER 'PLUM' HOLD BEFORE SUBMITTING REVISIONS FOR SIDEWALK
BADMIN COMPLETE 12/03/2020 12/03/2020
Note: Released By: JMONTARULI
PLUM HOLD 11/04/2020 11/12/2020
Note: Held By: FREODICA Revision : changed sanitary riser diagram and plumber. Provide complete drain pipe sizes on sanitary riser diagram including dated signature of plumbing contractor per FBCR 6th Ed. Sec. P3005.4/FBC Sec. 107.2.1. FReodica -386-986-4734.
URB COMPLETE 10/14/2020 10/20/2020
Note: Released By: JBEAUDET
BLD COMPLETE 10/13/2020 10/15/2020
Note: Released By: JPI
CUSVC COMPLETE 10/13/2020 10/14/2020
Note: Released By: HHAND
ELEC COMPLETE 10/13/2020 10/14/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/13/2020 10/13/2020
Note: Released By: TBAKER
LOCATE COMPLETE 10/13/2020 10/19/2020
Note: Released By: CSTONE
MECH COMPLETE 10/13/2020 10/14/2020
Note: Released By: CPISCITELLI
PLUM COMPLETE 10/13/2020 10/15/2020
Note: Released By: JPI
SW1 COMPLETE 10/13/2020 10/21/2020
Note: Released By: CTROHA
ZON COMPLETE 10/13/2020 10/14/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/30/2021
STORMWATER REINSPECTION FEE ¤40.00 04/28/2021
CONTRACTOR CHANGE ¤40.00 04/28/2021
REVISION ¤40.00 04/28/2021
SITE PLAN 20 ¤20.00 10/23/2020
SURCHARGE FS 533.721 ¤2.00 10/23/2020
SURCHARGE - FS 468.631 ¤2.00 10/23/2020
STORM WATER PERMIT FEES ¤80.00 10/23/2020
METER - DEPOSIT ¤60.00 10/23/2020
WATER-METER ¤434.59 10/23/2020
WATER-METER ¤361.04 10/23/2020
ADMIN FEE ¤20.00 10/23/2020
CONNECTION FEES ¤25.00 10/23/2020
BUILDING DISCOUNT 100% (¤1,308.80) 10/23/2020
ELECTRIC FEE ¤218.40 10/23/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/23/2020
IMPACT FEE FIRE ¤223.38 10/23/2020
IMPACT FEE PARKS ¤849.24 10/23/2020
IMPACT FEE TRANSPORTATION ¤3,059.00 10/23/2020
MECHANICAL FEE ¤218.40 10/23/2020
WATER -IRRIGATION INSPECTION ¤25.00 10/23/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/23/2020
PLAN CHECK FEE ¤105.60 10/23/2020
PLUMBING FEE ¤218.40 10/23/2020
3% TRANS IMPACT FEE CREDIT (¤91.77) 10/23/2020
SEWER INSPECTION ¤25.00 10/23/2020
SEWER CAPITAL FACILITY ¤2,389.36 10/23/2020
WATER CAPITAL FACILITY FEE ¤2,234.43 10/23/2020
NEW RESIDENTIAL INSPECTIONS ¤528.00 10/23/2020
Fees Total Due: ¤0.00 Total Paid: ¤9,826.09