Permit #2020100622
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00200-0310 |
| CONDITIONED SPACE: 2331 sqft |
| GARAGE: 610 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3213 sqft |
| Block: 00200 |
| Subdivision: - |
| Job Phone: (386) 672-8285 |
| Location Address: 62 FELSHIRE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/27/2020 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: DILLARD, ROBERT & BONNIE |
|
Address 355 ROSE HILL RD NW FLOYD, VA 24091 |
| Lot: 0310 |
| Contracted Stated Job Value: ¤242,800.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
Inspection History
| Type | Request Date | Result | Inspector |
| HVAC FINAL | 06/07/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 06/07/2021 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 06/07/2021 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 06/02/2021 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/01/2021 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 06/01/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 06/01/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 06/01/2021 | APPROVED | KRUTH |
| U-CROSS CONNECTION | 05/25/2021 | APPROVED | DHANEY |
| U - SEWER TIE IN | 05/19/2021 | APPROVED - AS NOTED | JGIBSON |
| Note: UTILITIES MADE U-SEWER CONNECTION | |||
| INSULATION | 04/29/2021 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 04/29/2021 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 04/09/2021 | APPROVED - AS NOTED | KRUTH |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/08/2021 | APPROVED | TBAKER |
| GRAVITY SEWER TEST | 02/24/2021 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 02/17/2021 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/15/2021 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 02/10/2021 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 01/28/2021 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/21/2021 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 01/04/2021 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 12/10/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/07/2020 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 11/06/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | HOLD | 06/09/2021 | 06/09/2021 |
| Note: Held By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM we need the Final Summary Inspection Report to issue the Co. | |||
| BADMIN | COMPLETE | 06/09/2021 | 06/09/2021 |
| Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/07/2021 | 04/07/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/07/2021 | 04/08/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/27/2020 | 10/27/2020 |
| Note: Released By: CTROHA Due to the neighboring improved properties ROW property lines will be accepted lower than CL of road | |||
| ZON | COMPLETE | 10/26/2020 | 10/26/2020 |
| Note: Released By: AMOBLEY | |||
| SW1 | HOLD | 10/26/2020 | 10/26/2020 |
| Note: Held By: CTROHA See checklist for correction The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. | |||
| SWALE | COMPLETE | 10/15/2020 | 12/10/2020 |
| Note: Released By: TBAKER | |||
| CUSVC | COMPLETE | 10/14/2020 | 10/14/2020 |
| Note: Released By: HHAND | |||
| ENGIN1 | COMPLETE | 10/14/2020 | 10/15/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/14/2020 | 10/19/2020 |
| Note: Released By: CSTONE | |||
| SW1 | HOLD | 10/14/2020 | 10/21/2020 |
| Note: Held By: CTROHA The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. ( | |||
| ZON | HOLD | 10/14/2020 | 10/15/2020 |
| Note: Held By: AMOBLEY Color sheet is for a different address Site plan must state the material and width of front entry walkway Site plan must list the total lot square footage |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 10/27/2020 |
| WATER- TURN ON | ¤25.00 | 10/27/2020 |
| ADMIN FEE | ¤145.00 | 10/27/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/27/2020 |
| BUILDING DISCOUNT 100% | (¤145.00) | 10/27/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/27/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/27/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/27/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/27/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/27/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/27/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/27/2020 |
| SITE PLAN 20 | ¤20.00 | 10/27/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/27/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/27/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/27/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/27/2020 |
| SEWER CREDIT | (¤1,147.00) | 10/27/2020 |
| SEWER INSPECTION | ¤25.00 | 10/27/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/27/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/27/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,329.35 |