Permit #2020100828
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01090-0010 |
| CONDITIONED SPACE: 2717 sqft |
| GARAGE: 1054 sqft |
| OPENED PORCH (WITH ROOF) : 295 sqft |
| Total Square Footage: 4066 sqft |
| Block: 01090 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-445-7945 |
| Location Address: 32 EVANSVILLE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/22/2020 |
| NOC: RECORDED |
| Applicant name: CHRISTOPHER DANIEL FULTON |
| Owner: ROWICKI PIOTR & ELZBIETA K DRAGAN |
|
Address 44 RAEMOOR DRIVE PALM COAST, FL 32164 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤326,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
RYSKCON CONSTRUCTION INC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CRC1332537 (Exp: 08/31/2026) | 386-445-7945 |
Sub Contractors
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
JOSEPH MOUAG
| Status | Location Address | State License Number | Phone |
| ACTIVE |
842 BANBURY DRIVE PORT ORANGE, FL 32129 |
EC13006957 (Exp: 08/31/2026) | 386-547-3722 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 06/27/2022 | FINAL APPROVED | JHARDING |
| Note: THIS IS A REINSPECTION No wire to pep panel | |||
| ROW - STORMWATER FINAL | 06/24/2022 | APPROVED | RGROSS |
| Note: On site with builder to bank 5 feet of bern near the end of the fence next to the ditch. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/24/2022 | CANCELLED BY APPLICANT | JHARDING |
| Note: No wire to pep panel | |||
| BLD - BUILDING FINAL | 06/24/2022 | FINAL APPROVED | RMARTIN |
| FINAL SURVEY (OFFICE USE ONLY) | 06/22/2022 | APPROVED | PFLANAGAN |
| Note: THIS IS A REINSPECTION The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. Check the final survey corrections need to be | |||
| ROW - FINAL APRON (AFTER POUR) | 06/22/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/22/2022 | APPROVED | PFLANAGAN |
| FINAL SURVEY (OFFICE USE ONLY) | 06/06/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. Check the final survey corrections need to be | |||
| ROW- PRE-APRON (PRE-POUR) | 05/06/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/05/2022 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 05/04/2022 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 05/02/2022 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 05/02/2022 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 04/14/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| GRAVITY SEWER TEST | 04/14/2022 | APPROVED | MKRASKI |
| U - SEWER TIE IN | 04/14/2022 | APPROVED | MKRASKI |
| PEP TANK INSTALLATION REQUEST | 03/31/2022 | APPROVED | CSTONE |
| ELECTRIC - EARLY POWER | 02/10/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION 1. Load side conductors can not be landed before this inspection. 2. All outside outlets need to be weather resistant and have covers on 3. Everything needs to be safed off in a box with a cover. 2/10/22 Emailed FPL at 8:40 am | |||
| ELECTRIC - EARLY POWER | 01/28/2022 | Disapproved - NO FEE | JMUNSON |
| Note: 1. Load side conductors can not be landed before this inspection. 2. All outside outlets need to be weather resistant and have covers on 3. Everything needs to be safed off in a box with a cover. | |||
| WINDOW NAILING | 12/02/2021 | APPROVED | JWALKER |
| INSULATION | 12/01/2021 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Building was locked unable to gain access. Checked rear slider also. Pleas leave home unlocked for inspection. | |||
| INSULATION | 11/30/2021 | Disapproved - NO FEE | JWALKER |
| Note: Building was locked unable to gain access. Checked rear slider also. Pleas leave home unlocked for inspection. | |||
| LATH/BRICK/ WATER BARRIER | 11/09/2021 | APPROVED | JWALKER |
| ALL ROUGH | 10/26/2021 | APPROVED - AS NOTED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Electric not complete No wire protection above panel in garage AC return plenum box not complete and sealed. (would not be able to verify this after drywall is done) Doors and windows not installed//openings not covered Loose AC supply registers - 2 - master closet and middle bdr closet on right side 9/23/21 Return vent rear bed not fastened to truss. Rear bed room has an outlet supplied with a 12-2 and a 14-2 running off of it. Missing nail plates multiple areas of top chords Hot water supply line in rear shower is kinked remove and replace and use proper 90 degree support 5' head test not filled Remove not rated foam from PVC plumbing vents at top chord Provide fastening details for rear slider concrete cut out at knee wall needs to be filled STOP INSPECTION DUE TO AMOUNT FAILURES> 10/8/21 1 -Not rated foam has not been removed at top plate where plumbing vents penetrate 2- 5' head test not filled 3-Wiring needs to be secured within 12"s where the enter outlet boxes 4-Outlet boxes for smoke detectors and wiring have not been installed 5-All garage outlets are to be on a 20 amp circut wired with 12-2 remove the 14-2 being supplied by the 20amp circut at the outlet right side of Air handler. 6-Dining areas is to be on a 20amp circut also 12-2 wired 7-Dryer duct and kitchen exhaust ducts are to be completely sealed 8-The P-hook at the rear slider has not been fastened as per details 9-Please have mechanical drawings on site for reinspection' 10- exterior wiring not installed in outlet boxes. 10/26/21 The Phook at the rear sliders has not been fastened to the 2x P.T. Jambs. Install fasteners as per detail. | |||
| ALL ROUGH | 10/08/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Electric not complete No wire protection above panel in garage AC return plenum box not complete and sealed. (would not be able to verify this after drywall is done) Doors and windows not installed//openings not covered Loose AC supply registers - 2 - master closet and middle bdr closet on right side 9/23/21 Return vent rear bed not fastened to truss. Rear bed room has an outlet supplied with a 12-2 and a 14-2 running off of it. Missing nail plates multiple areas of top chords Hot water supply line in rear shower is kinked remove and replace and use proper 90 degree support 5' head test not filled Remove not rated foam from PVC plumbing vents at top chord Provide fastening details for rear slider concrete cut out at knee wall needs to be filled STOP INSPECTION DUE TO AMOUNT FAILURES> 10/8/21 1 -Not rated foam has not been removed at top plate where plumbing vents penetrate 2- 5' head test not filled 3-Wiring needs to be secured within 12"s where the enter outlet boxes 4-Outlet boxes for smoke detectors and hard wiring have not been installed as per dicussion with contractor new construction for smoke detectors must be hard wired R-314 5-All garage outlets are to be on a 20 amp circut wired with 12-2 remove the 14-2 being supplied by the 20amp circut at the outlet right side of Air handler. 6-Dining areas is to be on a 20amp circut also 12-2 wired 7-Dryer duct and kitchen exhaust ducts are to be completely sealed 8-The P-hook at the rear slider has not been fastened as per details 9-Please have mechanical drawings on site for reinspection' 10- exterior wiring not installed in outlet boxes. | |||
| ALL ROUGH | 09/23/2021 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Electric not complete No wire protection above panel in garage AC return plenum box not complete and sealed. (would not be able to verify this after drywall is done) Doors and windows not installed//openings not covered Loose AC supply registers - 2 - master closet and middle bdr closet on right side 9/23/21 Return vent rear bed not fastened to truss. Rear bed room has an outlet supplied with a 12-2 and a 14-2 running off of it. Missing nail plates multiple areas of top chords Hot water supply line in rear shower is kinked remove and replace and use proper 90 degree support 5' head test not filled Remove not rated foam from PVC plumbing vents at top chord Provide fastening details for rear slider concrete cut out at knee wall needs to be filled STOP INSPECTION DUE TO AMOUNT FAILURES> | |||
| ROW - DRAINAGE | 09/23/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO INSTALL A SILT FENCE AROUND THE CONSTRUTION SITE SPECIAL BY THE DITCH LINE BE BACK 05/11/2021 5/11/21 - Open at the time of inspection. Next inspection. 5/27/21 | |||
| ELECTRIC-TUG | 09/22/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Need to set a temp pole and call for a temp pole inspection. TUG stands for temporary underground. The service on the house is an overhead. 9/22/21 Emailed FPL at 9:36 am | |||
| ELECTRIC-TUG | 09/14/2021 | Disapproved - NO FEE | JMUNSON |
| Note: Need to set a temp pole and call for a temp pole inspection. TUG stands for temporary underground. The service on the house is an overhead. | |||
| ALL ROUGH | 07/29/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Electric not complete No wire protection above panel in garage AC return plenum box not complete and sealed. (would not be able to verify this after drywall is done) Doors and windows not installed//openings not covered Loose AC supply registers - 2 - master closet and middle bdr closet on right side | |||
| ALL ROUGH | 07/26/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Electric not complete | |||
| ROOF VALLEY & METAL | 05/26/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/21/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Customer requested roof sheathing only. Underlayment will be "peel and Stick" membrane. 05-10-21... Cancelled per Chris | |||
| ROW - DRAINAGE | 05/11/2021 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION NEED TO INSTALL A SILT FENCE AROUND THE CONSTRUTION SITE SPECIAL BY THE DITCH LINE BE BACK 05/11/2021 5/11/21 - Open at the time of inspection. Next inspection. 5/27/21 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2021 | CANCELLED BY APPLICANT | WMILLER |
| Note: THIS IS A REINSPECTION Customer requested roof sheathing only. Underlayment will be "peel and Stick" membrane. 05-10-21... Cancelled per Chris | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/04/2021 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: Customer requested roof sheathing only. Underlayment will be "peel and Stick" membrane. | |||
| ROW - DRAINAGE | 05/03/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: NEED TO INSTALL A SILT FENCE AROUND THE CONSTRUTION SITE SPECIAL BY THE DITCH LINE BE BACK 05/11/2021 | |||
| TIE BEAM / LINTEL | 03/25/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 03/16/2021 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/04/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Pipes passing through footings not sleeved: 305.3 Pipes Through Foundation Walls Any pipe that passes through a foundation wall shall be provided with a relieving arch, or a pipe sleeve pipe shall be built into the foundation wall. The sleeve shall be two pipe sizes greater than the pipe passing through the wall. | |||
| MONOLITHIC SLAB | 03/03/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Pipes passing through footings not sleeved: 305.3 Pipes Through Foundation Walls Any pipe that passes through a foundation wall shall be provided with a relieving arch, or a pipe sleeve pipe shall be built into the foundation wall. The sleeve shall be two pipe sizes greater than the pipe passing through the wall. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/23/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 02/16/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/11/2022 | 05/12/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/11/2022 | 05/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/11/2022 | 05/13/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/15/2022 | 03/16/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/28/2022 | 01/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/28/2022 | 02/02/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/28/2022 | 01/28/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/13/2021 | 09/13/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/15/2021 | 03/16/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US | |||
| ZON | COMPLETE | 03/15/2021 | 03/15/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/17/2020 | 12/18/2020 |
| Note: Released By: CPISCITELLI | |||
| MECH | HOLD | 12/11/2020 | 12/11/2020 |
| Note: Held By: CPISCITELLI 1. Duct Layout needs to be signed by the AC contractor 2. Energy calcs need to be ran with specific equipment amd heaload needs to show equipment model numbers and AHRI number | |||
| ZON | COMPLETE | 12/11/2020 | 12/11/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 12/11/2020 | 12/14/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 12/11/2020 | 12/17/2020 |
| Note: Released By: CTROHA Stormwater review not requested on Permit Correction/Revision Form | |||
| ZON | HOLD | 12/04/2020 | 12/04/2020 |
| Note: Held By: ELENS Held By: ELENS Repeat Comment: Please label driveway width at the garage door on the left ON THE SITE PLAN. The minimum driveway width for a one or two car garage is 16 feet for at least 20 feet. The originally submitted site plan shows the driveway on the right at 16 feet. The revised floor plan has it labeled 14'. Please correct so they match. Please remove the wording "Pull-Thru Boat/Toy Garage" from the floor plan. Need to label driveway on left as a Paver Driveway | |||
| SWALE | COMPLETE | 12/03/2020 | 12/29/2020 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 12/03/2020 | 12/04/2020 |
| Note: Held By: CPISCITELLI 1.Provide heatload with equipment information. 2. Provide Duct layout signed by the AC contractor | |||
| UTL | CANCEL | 10/26/2020 | 10/26/2020 |
| ZON | HOLD | 10/20/2020 | 10/20/2020 |
| Note: Held By: ELENS Need original ROW agreement for recording Maximum garage depth is 30’. (Left entrance garage exceeds this.) Please label driveway width at the garage door on the left. (Please note that the minimum driveway width for 3 and/or 4 car garages is 24' for a minimum of 20'.) Cannot label the concrete slab behind the garage "Driveway # 2" on the landscape plan. 6 credit trees are required. (Queen palms are non-credit trees.) 8 foundation plantings are required in front, 6 on the left side facing the public ROW, 4 on the right side. Foundation plantings must wrap corners. Banding is required on all windows and doors (including garage doors) facing a public right of way. (Front and left sides) It appears they are banded. Please specify on the elevations that they are banded. | |||
| BLD | COMPLETE | 10/19/2020 | 10/22/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/19/2020 | 10/20/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/19/2020 | 10/20/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/19/2020 | 10/20/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/19/2020 | 10/23/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 10/19/2020 | 10/20/2020 |
| Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder. | |||
| PLUM | COMPLETE | 10/19/2020 | 10/22/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 10/19/2020 | 10/26/2020 |
| Note: Released By: CTROHA |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 06/27/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/27/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/27/2022 |
| CONNECTION FEES | ¤1,017.83 | 12/22/2020 |
| METER - DEPOSIT | ¤60.00 | 12/22/2020 |
| WATER- TURN ON | ¤25.00 | 12/22/2020 |
| ADMIN FEE | ¤20.00 | 12/22/2020 |
| BUILDING DISCOUNT 100% | (¤1,699.40) | 12/22/2020 |
| ELECTRIC FEE | ¤274.20 | 12/22/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 12/22/2020 |
| IMPACT FEE FIRE | ¤223.38 | 12/22/2020 |
| IMPACT FEE PARKS | ¤849.24 | 12/22/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/22/2020 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 12/22/2020 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 12/22/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 12/22/2020 |
| MECHANICAL FEE | ¤274.20 | 12/22/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/22/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/22/2020 |
| PLAN CHECK FEE | ¤142.80 | 12/22/2020 |
| PLUMBING FEE | ¤274.20 | 12/22/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤714.00 | 12/22/2020 |
| SITE PLAN 20 | ¤20.00 | 12/22/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/22/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 12/22/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/22/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 12/22/2020 |
| SEWER CREDIT | (¤850.00) | 12/22/2020 |
| SEWER INSPECTION | ¤25.00 | 12/22/2020 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 12/22/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 12/22/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,959.55 |