I want to search for...

Permit #2020100828

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01090-0010
CONDITIONED SPACE: 2717 sqft
GARAGE: 1054 sqft
OPENED PORCH (WITH ROOF) : 295 sqft
Total Square Footage: 4066 sqft
Block: 01090
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-445-7945
Location Address: 32 EVANSVILLE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/22/2020
NOC: RECORDED
Applicant name: CHRISTOPHER DANIEL FULTON
Owner: ROWICKI PIOTR & ELZBIETA K DRAGAN

Address

44 RAEMOOR DRIVE

PALM COAST, FL 32164

Lot: 0010
Contracted Stated Job Value: ¤326,000.00
Job Description: Single Family Residence
Type: CN

Contractor

RYSKCON CONSTRUCTION INC
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CRC1332537 (Exp: 08/31/2026) 386-445-7945

Sub Contractors

JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945
JOSEPH MOUAG
Status Location Address State License Number Phone
ACTIVE

842 BANBURY DRIVE

PORT ORANGE, FL 32129

EC13006957 (Exp: 08/31/2026) 386-547-3722

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 06/27/2022 FINAL APPROVED JHARDING
Note: THIS IS A REINSPECTION No wire to pep panel
ROW - STORMWATER FINAL 06/24/2022 APPROVED RGROSS
Note: On site with builder to bank 5 feet of bern near the end of the fence next to the ditch.
U -UTILITY RESIDENTIAL FINAL 06/24/2022 CANCELLED BY APPLICANT JHARDING
Note: No wire to pep panel
BLD - BUILDING FINAL 06/24/2022 FINAL APPROVED RMARTIN
FINAL SURVEY (OFFICE USE ONLY) 06/22/2022 APPROVED PFLANAGAN
Note: THIS IS A REINSPECTION The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. Check the final survey corrections need to be
ROW - FINAL APRON (AFTER POUR) 06/22/2022 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 06/22/2022 APPROVED PFLANAGAN
FINAL SURVEY (OFFICE USE ONLY) 06/06/2022 Disapproved - NO FEE GBERTOLA
Note: The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. Check the final survey corrections need to be
ROW- PRE-APRON (PRE-POUR) 05/06/2022 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 05/05/2022 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 05/04/2022 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 05/02/2022 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 05/02/2022 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 04/14/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
GRAVITY SEWER TEST 04/14/2022 APPROVED MKRASKI
U - SEWER TIE IN 04/14/2022 APPROVED MKRASKI
PEP TANK INSTALLATION REQUEST 03/31/2022 APPROVED CSTONE
ELECTRIC - EARLY POWER 02/10/2022 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION 1. Load side conductors can not be landed before this inspection. 2. All outside outlets need to be weather resistant and have covers on 3. Everything needs to be safed off in a box with a cover. 2/10/22 Emailed FPL at 8:40 am
ELECTRIC - EARLY POWER 01/28/2022 Disapproved - NO FEE JMUNSON
Note: 1. Load side conductors can not be landed before this inspection. 2. All outside outlets need to be weather resistant and have covers on 3. Everything needs to be safed off in a box with a cover.
WINDOW NAILING 12/02/2021 APPROVED JWALKER
INSULATION 12/01/2021 APPROVED JWALKER
Note: THIS IS A REINSPECTION Building was locked unable to gain access. Checked rear slider also. Pleas leave home unlocked for inspection.
INSULATION 11/30/2021 Disapproved - NO FEE JWALKER
Note: Building was locked unable to gain access. Checked rear slider also. Pleas leave home unlocked for inspection.
LATH/BRICK/ WATER BARRIER 11/09/2021 APPROVED JWALKER
ALL ROUGH 10/26/2021 APPROVED - AS NOTED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Electric not complete No wire protection above panel in garage AC return plenum box not complete and sealed. (would not be able to verify this after drywall is done) Doors and windows not installed//openings not covered Loose AC supply registers - 2 - master closet and middle bdr closet on right side 9/23/21 Return vent rear bed not fastened to truss. Rear bed room has an outlet supplied with a 12-2 and a 14-2 running off of it. Missing nail plates multiple areas of top chords Hot water supply line in rear shower is kinked remove and replace and use proper 90 degree support 5' head test not filled Remove not rated foam from PVC plumbing vents at top chord Provide fastening details for rear slider concrete cut out at knee wall needs to be filled STOP INSPECTION DUE TO AMOUNT FAILURES> 10/8/21 1 -Not rated foam has not been removed at top plate where plumbing vents penetrate 2- 5' head test not filled 3-Wiring needs to be secured within 12"s where the enter outlet boxes 4-Outlet boxes for smoke detectors and wiring have not been installed 5-All garage outlets are to be on a 20 amp circut wired with 12-2 remove the 14-2 being supplied by the 20amp circut at the outlet right side of Air handler. 6-Dining areas is to be on a 20amp circut also 12-2 wired 7-Dryer duct and kitchen exhaust ducts are to be completely sealed 8-The P-hook at the rear slider has not been fastened as per details 9-Please have mechanical drawings on site for reinspection' 10- exterior wiring not installed in outlet boxes. 10/26/21 The Phook at the rear sliders has not been fastened to the 2x P.T. Jambs. Install fasteners as per detail.
ALL ROUGH 10/08/2021 Disapproved -FEE REQUIRED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Electric not complete No wire protection above panel in garage AC return plenum box not complete and sealed. (would not be able to verify this after drywall is done) Doors and windows not installed//openings not covered Loose AC supply registers - 2 - master closet and middle bdr closet on right side 9/23/21 Return vent rear bed not fastened to truss. Rear bed room has an outlet supplied with a 12-2 and a 14-2 running off of it. Missing nail plates multiple areas of top chords Hot water supply line in rear shower is kinked remove and replace and use proper 90 degree support 5' head test not filled Remove not rated foam from PVC plumbing vents at top chord Provide fastening details for rear slider concrete cut out at knee wall needs to be filled STOP INSPECTION DUE TO AMOUNT FAILURES> 10/8/21 1 -Not rated foam has not been removed at top plate where plumbing vents penetrate 2- 5' head test not filled 3-Wiring needs to be secured within 12"s where the enter outlet boxes 4-Outlet boxes for smoke detectors and hard wiring have not been installed as per dicussion with contractor new construction for smoke detectors must be hard wired R-314 5-All garage outlets are to be on a 20 amp circut wired with 12-2 remove the 14-2 being supplied by the 20amp circut at the outlet right side of Air handler. 6-Dining areas is to be on a 20amp circut also 12-2 wired 7-Dryer duct and kitchen exhaust ducts are to be completely sealed 8-The P-hook at the rear slider has not been fastened as per details 9-Please have mechanical drawings on site for reinspection' 10- exterior wiring not installed in outlet boxes.
ALL ROUGH 09/23/2021 Disapproved -FEE REQUIRED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Electric not complete No wire protection above panel in garage AC return plenum box not complete and sealed. (would not be able to verify this after drywall is done) Doors and windows not installed//openings not covered Loose AC supply registers - 2 - master closet and middle bdr closet on right side 9/23/21 Return vent rear bed not fastened to truss. Rear bed room has an outlet supplied with a 12-2 and a 14-2 running off of it. Missing nail plates multiple areas of top chords Hot water supply line in rear shower is kinked remove and replace and use proper 90 degree support 5' head test not filled Remove not rated foam from PVC plumbing vents at top chord Provide fastening details for rear slider concrete cut out at knee wall needs to be filled STOP INSPECTION DUE TO AMOUNT FAILURES>
ROW - DRAINAGE 09/23/2021 APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION NEED TO INSTALL A SILT FENCE AROUND THE CONSTRUTION SITE SPECIAL BY THE DITCH LINE BE BACK 05/11/2021 5/11/21 - Open at the time of inspection. Next inspection. 5/27/21
ELECTRIC-TUG 09/22/2021 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION Need to set a temp pole and call for a temp pole inspection. TUG stands for temporary underground. The service on the house is an overhead. 9/22/21 Emailed FPL at 9:36 am
ELECTRIC-TUG 09/14/2021 Disapproved - NO FEE JMUNSON
Note: Need to set a temp pole and call for a temp pole inspection. TUG stands for temporary underground. The service on the house is an overhead.
ALL ROUGH 07/29/2021 Disapproved - NO FEE TSTAUFFACHER
Note: THIS IS A REINSPECTION Electric not complete No wire protection above panel in garage AC return plenum box not complete and sealed. (would not be able to verify this after drywall is done) Doors and windows not installed//openings not covered Loose AC supply registers - 2 - master closet and middle bdr closet on right side
ALL ROUGH 07/26/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Electric not complete
ROOF VALLEY & METAL 05/26/2021 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/21/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Customer requested roof sheathing only. Underlayment will be "peel and Stick" membrane. 05-10-21... Cancelled per Chris
ROW - DRAINAGE 05/11/2021 PARTIALLY APPROVED RGROSS
Note: THIS IS A REINSPECTION NEED TO INSTALL A SILT FENCE AROUND THE CONSTRUTION SITE SPECIAL BY THE DITCH LINE BE BACK 05/11/2021 5/11/21 - Open at the time of inspection. Next inspection. 5/27/21
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/10/2021 CANCELLED BY APPLICANT WMILLER
Note: THIS IS A REINSPECTION Customer requested roof sheathing only. Underlayment will be "peel and Stick" membrane. 05-10-21... Cancelled per Chris
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/04/2021 PARTIALLY APPROVED TSTAUFFACHER
Note: Customer requested roof sheathing only. Underlayment will be "peel and Stick" membrane.
ROW - DRAINAGE 05/03/2021 Disapproved - NO FEE GBERTOLA
Note: NEED TO INSTALL A SILT FENCE AROUND THE CONSTRUTION SITE SPECIAL BY THE DITCH LINE BE BACK 05/11/2021
TIE BEAM / LINTEL 03/25/2021 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 03/16/2021 APPROVED TBAKER
MONOLITHIC SLAB 03/04/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Pipes passing through footings not sleeved: 305.3 Pipes Through Foundation Walls Any pipe that passes through a foundation wall shall be provided with a relieving arch, or a pipe sleeve pipe shall be built into the foundation wall. The sleeve shall be two pipe sizes greater than the pipe passing through the wall.
MONOLITHIC SLAB 03/03/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Pipes passing through footings not sleeved: 305.3 Pipes Through Foundation Walls Any pipe that passes through a foundation wall shall be provided with a relieving arch, or a pipe sleeve pipe shall be built into the foundation wall. The sleeve shall be two pipe sizes greater than the pipe passing through the wall.
PLUMBING 1ST ROUGH UNDERGROUND 02/23/2021 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 02/16/2021 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/11/2022 05/12/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/11/2022 05/18/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 05/11/2022 05/13/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 03/15/2022 03/16/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/28/2022 01/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 01/28/2022 02/02/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 01/28/2022 01/28/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 09/13/2021 09/13/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/15/2021 03/16/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
ZON COMPLETE 03/15/2021 03/15/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 12/17/2020 12/18/2020
Note: Released By: CPISCITELLI
MECH HOLD 12/11/2020 12/11/2020
Note: Held By: CPISCITELLI 1. Duct Layout needs to be signed by the AC contractor 2. Energy calcs need to be ran with specific equipment amd heaload needs to show equipment model numbers and AHRI number
ZON COMPLETE 12/11/2020 12/11/2020
Note: Released By: ELENS
ENGIN1 COMPLETE 12/11/2020 12/14/2020
Note: Released By: TBAKER
SW1 COMPLETE 12/11/2020 12/17/2020
Note: Released By: CTROHA Stormwater review not requested on Permit Correction/Revision Form
ZON HOLD 12/04/2020 12/04/2020
Note: Held By: ELENS Held By: ELENS Repeat Comment: Please label driveway width at the garage door on the left ON THE SITE PLAN. The minimum driveway width for a one or two car garage is 16 feet for at least 20 feet. The originally submitted site plan shows the driveway on the right at 16 feet. The revised floor plan has it labeled 14'. Please correct so they match. Please remove the wording "Pull-Thru Boat/Toy Garage" from the floor plan. Need to label driveway on left as a Paver Driveway
SWALE COMPLETE 12/03/2020 12/29/2020
Note: Released By: TBAKER
MECH HOLD 12/03/2020 12/04/2020
Note: Held By: CPISCITELLI 1.Provide heatload with equipment information. 2. Provide Duct layout signed by the AC contractor
UTL CANCEL 10/26/2020 10/26/2020
ZON HOLD 10/20/2020 10/20/2020
Note: Held By: ELENS Need original ROW agreement for recording Maximum garage depth is 30’. (Left entrance garage exceeds this.) Please label driveway width at the garage door on the left. (Please note that the minimum driveway width for 3 and/or 4 car garages is 24' for a minimum of 20'.) Cannot label the concrete slab behind the garage "Driveway # 2" on the landscape plan. 6 credit trees are required. (Queen palms are non-credit trees.) 8 foundation plantings are required in front, 6 on the left side facing the public ROW, 4 on the right side. Foundation plantings must wrap corners. Banding is required on all windows and doors (including garage doors) facing a public right of way. (Front and left sides) It appears they are banded. Please specify on the elevations that they are banded.
BLD COMPLETE 10/19/2020 10/22/2020
Note: Released By: JPI
CUSVC COMPLETE 10/19/2020 10/20/2020
Note: Released By: HHAND
ELEC COMPLETE 10/19/2020 10/20/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/19/2020 10/20/2020
Note: Released By: TBAKER
LOCATE COMPLETE 10/19/2020 10/23/2020
Note: Released By: CSTONE
MECH HOLD 10/19/2020 10/20/2020
Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder.
PLUM COMPLETE 10/19/2020 10/22/2020
Note: Released By: JPI
SW1 COMPLETE 10/19/2020 10/26/2020
Note: Released By: CTROHA

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/27/2022
REINSPECTION RESIDENTIAL ¤40.00 06/27/2022
REINSPECTION RESIDENTIAL ¤40.00 06/27/2022
CONNECTION FEES ¤1,017.83 12/22/2020
METER - DEPOSIT ¤60.00 12/22/2020
WATER- TURN ON ¤25.00 12/22/2020
ADMIN FEE ¤20.00 12/22/2020
BUILDING DISCOUNT 100% (¤1,699.40) 12/22/2020
ELECTRIC FEE ¤274.20 12/22/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 12/22/2020
IMPACT FEE FIRE ¤223.38 12/22/2020
IMPACT FEE PARKS ¤849.24 12/22/2020
IMPACT FEE SCHOOL ¤3,600.00 12/22/2020
RECORDING FEE REIMBURSE DOC ¤35.50 12/22/2020
RECORDING FEE REIMBURSE DOC ¤44.00 12/22/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 12/22/2020
MECHANICAL FEE ¤274.20 12/22/2020
WATER -IRRIGATION INSPECTION ¤25.00 12/22/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 12/22/2020
PLAN CHECK FEE ¤142.80 12/22/2020
PLUMBING FEE ¤274.20 12/22/2020
NEW RESIDENTIAL INSPECTIONS ¤714.00 12/22/2020
SITE PLAN 20 ¤20.00 12/22/2020
SURCHARGE FS 533.721 ¤2.00 12/22/2020
SURCHARGE - FS 468.631 ¤2.00 12/22/2020
STORM WATER PERMIT FEES ¤80.00 12/22/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 12/22/2020
SEWER CREDIT (¤850.00) 12/22/2020
SEWER INSPECTION ¤25.00 12/22/2020
SEWER CAPITAL FACILITY ¤4,664.55 12/22/2020
WATER CAPITAL FACILITY FEE ¤3,424.45 12/22/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,959.55