I want to search for...
Permit #2020101018
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00010-0070 |
| CONDITIONED SPACE: 1280 sqft |
| CONDITIONED SPACE: 1280 sqft |
| GARAGE: 250 sqft |
| GARAGE: 250 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 3420 sqft |
| Block: 00010 |
| Subdivision: - |
| Job Phone: 386-447-7007 |
| Location Address: 27 SLUMBER MEADOW TR |
| Type: DU - DUPLEX |
| Issue Date: 01/27/2021 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: SLOBODKIN VLADIMIR & LUDMILA SLOBODKIN H&W |
|
Address 17 EASTLAND LANE PALM COAST, FL 32164 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1312 YORKTOWN STREET DELAND , FL 32724 |
EC13005662 (Exp: 08/31/2026) | 386-736-7475 | 386-785-1503 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL SURVEY (OFFICE USE ONLY) | 04/04/2022 | APPROVED | GBERTOLA |
| Note: final survey was approved by PFLANAGAN ON 3/30/22 | |||
| BLD - BUILDING FINAL | 04/01/2022 | FINAL APPROVED | TSTAUFFACHER |
| ROW - FINAL APRON (AFTER POUR) | 04/01/2022 | APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 04/01/2022 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 03/31/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 3/31/22 NEED TO PUT SOD NOT SEED AND STRAW ON BARE AREAS ON RIGHT SIDE PROPERTY LINE SEE NOTES BELOW DATED 3/29/22 3/29/22 need to put sod on bare area on right side of home do to ground was Disturbed during construction need to put seed and straw on back left bare area or sod on those area also The final survey inspection needs to be done before the Row - final inspection | |||
| ROW - FINAL INSPECTION | 03/31/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: SPOKE CONTRACTOR OVER PHONE SAID SOD WAS LAYED ON RIGHT SIDE OF HOME 3/31/22 NEED TO PUT SOD NOT SEED AND STRAW ON BARE AREAS ON RIGHT SIDE PROPERTY LINE SEE NOTES BELOW DATED 3/29/22 3/29/22 need to put sod on bare area on right side of home do to ground was Disturbed during construction need to put seed and straw on back left bare area or sod on those area also The final survey inspection needs to be done before the Row - final inspection | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/30/2022 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/29/2022 | APPROVED | PFLANAGAN |
| ROW - FINAL INSPECTION | 03/29/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 3/29/22 need to put sod on bare area on right side of home do to ground was Disturbed during construction need to put seed and straw on back left bare area or sod on those area also The final survey inspection needs to be done before the Row - final inspection | |||
| U-CROSS CONNECTION | 03/25/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - FINAL INSPECTION | 03/08/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: The final survey inspection needs to be done before the Row - final inspection | |||
| ROW- PRE-APRON (PRE-POUR) | 01/14/2022 | APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION Not ready for inspection. Not formed ALL THE WAY 01/14/2021=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/13/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: Not ready for inspection. Not formed ALL THE WAY | |||
| ELECTRIC - EARLY POWER | 11/19/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION UFER ground needs to be protected NEC 2017 250.64 11/15/21 UFER ground needs to be protected NEC 2017 250.64 11/19/21 Emailed FPL at 11:45 am | |||
| ELECTRIC - EARLY POWER | 11/15/2021 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: THIS IS A REINSPECTION UFER ground needs to be protected NEC 2017 250.64 11/15/21 UFER ground needs to be protected NEC 2017 250.64 | |||
| ELECTRIC - EARLY POWER | 11/09/2021 | Disapproved - NO FEE | JMUNSON |
| Note: UFER ground needs to be protected NEC 2017 250.64 | |||
| GRAVITY SEWER TEST | 10/26/2021 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 10/26/2021 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 09/24/2021 | APPROVED - AS NOTED | CSTONE |
| Note: Dumpster in the way | |||
| INSULATION | 09/20/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Add cardboard to volume ceiling at height change Add depth Markers | |||
| INSULATION | 08/30/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Add cardboard to volume ceiling at height change Add depth Markers | |||
| FIREWALL FINAL | 08/30/2021 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 08/23/2021 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION This is NOT a complete list: Please verify work is complete prior to calling in inspections to avoid fees. Electricians not finished Bath fan vent hose not connected Penetrations from vents not sealed from bottom | |||
| ALL ROUGH | 08/16/2021 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: This is NOT a complete list: Please verify work is complete prior to calling in inspections to avoid fees. Electricians not finished Bath fan vent hose not connected Penetrations from vents not sealed from bottom | |||
| LATH/BRICK/ WATER BARRIER | 08/03/2021 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 06/25/2021 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/16/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION Please prvide readable complete set of plans. Truss engineering sheets not on site. Inspection not started 06-16-21... approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/15/2021 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Please prvide readable complete set of plans. Truss engineering sheets not on site. Inspection not started | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/12/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/20/2021 | APPROVED | TSTAUFFACHER |
| MONOLITHIC SLAB | 03/18/2021 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/16/2021 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION need 5ft head pressure on Sanitary | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/15/2021 | Disapproved -FEE REQUIRED | JBODEN |
| Note: need 5ft head pressure on Sanitary | |||
| WATER METER INSTALLATION REQUEST | 01/28/2021 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 03/31/2022 | 03/31/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM FINAL S MISSING DIGITAL SEAL | |||
| BADMIN | HOLD | 09/23/2021 | 09/23/2021 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC IS NOT RECORDED/CERTIFIED RENAME TO NOC.PDF | |||
| BADMIN | COMPLETE | 09/23/2021 | 09/23/2021 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/11/2021 | 06/12/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/11/2021 | 06/11/2021 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/02/2021 | 06/10/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/08/2021 | 04/08/2021 |
| Note: Held By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM Foundation survey must have front setbacks. | |||
| ENGIN1 | COMPLETE | 04/08/2021 | 04/09/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/29/2020 | 01/05/2021 |
| Note: Released By: KRUTH | |||
| ZON | COMPLETE | 12/29/2020 | 12/29/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 12/29/2020 | 01/05/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 12/17/2020 | 12/18/2020 |
| Note: Released By: ELENS | |||
| ENGIN1 | COMPLETE | 12/17/2020 | 12/17/2020 |
| Note: Released By: TBAKER | |||
| SW1 | HOLD | 12/17/2020 | 12/23/2020 |
| Note: Held By: CTROHA Applicant needs to revise site plan to show positive drainage at a tenth per 20' to the front swale | |||
| SW1 | COMPLETE | 12/09/2020 | 12/16/2020 |
| Note: Released By: CTROHA See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. | |||
| ZON | HOLD | 12/09/2020 | 12/09/2020 |
| Note: Held By: ELENS Repeat Comments: 1.Minimum driveway width for a one car garage is 16 feet (each). 2. Need setbacks to all property lines. (rear setback is missing). | |||
| ELEC | COMPLETE | 12/09/2020 | 12/10/2020 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 12/04/2020 | 12/04/2020 |
| Note: Released By: PBUCKLEY | |||
| ZON | HOLD | 11/18/2020 | 11/18/2020 |
| Note: Held By: ELENS Please submit a revised "Site Plan" (There is a document that was uploaded with corrections that is labeled "Plan". If that is meant to be the revise site plan the following comments apply: Site plan: 1.Minimum driveway width for a one car garage is 16 feet. 2. Need setbacks to all property lines. Landscape Plan: 1. 4 credit trees are required including one shade tree. 2. 16 foundation plantings are required in addition to A/C screening. 8 are required across the front and 4 on each side. 3. Please indicate the type of sod and whether irrigation will be provided. | |||
| MECH | COMPLETE | 11/16/2020 | 11/16/2020 |
| Note: Released By: CPISCITELLI | |||
| SW1 | HOLD | 11/16/2020 | 11/18/2020 |
| Note: Held By: CTROHA See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. | |||
| BLD | HOLD | 11/16/2020 | 11/23/2020 |
| Note: Held By: JPI 1. Need CO detectors outside Master Bedroom doors 2. Sht 9.S1 calls out plywood or OSB sheathing with felt underlayment whereas details on sht 5 calls out a ZIP system. There also is no detail regarding nailing patterns. Reconcile, revise, and cloud drawings 3. Need to note that fire retardant sheathing required within 4 feet of the party wall per fire code | |||
| SWALE | COMPLETE | 10/23/2020 | 01/14/2021 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 10/22/2020 | 10/28/2020 |
| Note: Held By: JPI 1. Sheet 9-S1 shows single ridge vent, subsequent drawings show one on each face of the roof. They have to be a minimum of 4 feet from the fire wall. Please add a general note or add labels to all locations. R902.1 2. Need to show fire rated plywood roof sheathing within 4 feet of the fire wall . R902.1 3. Need to show nailing pattern of roof sheathing 4. Product approval missing roofing underlayment 5. Electric riser (meter can drawing) for wrong address | |||
| CUSVC | COMPLETE | 10/22/2020 | 10/23/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/22/2020 | 10/26/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/22/2020 | 10/23/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/22/2020 | 10/27/2020 |
| Note: Released By: TCHURCHILL | |||
| MECH | HOLD | 10/22/2020 | 10/23/2020 |
| Note: Held By: CPISCITELLI Energy Calcs and EPL card need to be signed by the builder. | |||
| PLUM | COMPLETE | 10/22/2020 | 10/28/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 10/22/2020 | 10/27/2020 |
| Note: Held By: KRUTH See uploaded Stormwater checklist in attachments for correction. Unchecked items need to be addressed SEE STORMWATER INFORMATION PACKET FOR REQUIREMENTS | |||
| ZON | HOLD | 10/22/2020 | 10/23/2020 |
| Note: Held By: ELENS Site plan: 1. Need driveway(s) material and width 2. Need walkway(s) material and width 3. Need setbacks to all property lines. 4. Need to show all easements on the site plan and survey Need to upload a landscape plan so that Zoning can complete the review. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/01/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/01/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/01/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/07/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/07/2022 |
| REINSPECTION FEE | ¤40.00 | 11/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| CONTRACTOR CHANGE | ¤40.00 | 11/02/2021 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/02/2021 |
| BUILDING DISCOUNT 100% | (¤1,539.80) | 01/27/2021 |
| ELECTRIC FEE | ¤251.40 | 01/27/2021 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 01/27/2021 |
| IMPACT FEE FIRE | ¤734.00 | 01/27/2021 |
| IMPACT FEE PARKS | ¤2,398.24 | 01/27/2021 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 01/27/2021 |
| IMPACT FEE TRANSPORTATION | ¤2,598.00 | 01/27/2021 |
| MECHANICAL FEE | ¤251.40 | 01/27/2021 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 01/27/2021 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 01/27/2021 |
| PLAN CHECK FEE | ¤127.60 | 01/27/2021 |
| PLUMBING FEE | ¤251.40 | 01/27/2021 |
| NEW RESIDENTIAL INSPECTIONS | ¤638.00 | 01/27/2021 |
| SITE PLAN 20 | ¤20.00 | 01/27/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/27/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/27/2021 |
| CONNECTION FEES | ¤2,035.66 | 01/27/2021 |
| METER - DEPOSIT | ¤120.00 | 01/27/2021 |
| WATER- TURN ON | ¤50.00 | 01/27/2021 |
| ADMIN FEE | ¤20.00 | 01/27/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/27/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤77.94) | 01/27/2021 |
| SEWER CREDIT | (¤2,158.40) | 01/27/2021 |
| SEWER INSPECTION | ¤25.00 | 01/27/2021 |
| SEWER CAPITAL FACILITY | ¤9,329.10 | 01/27/2021 |
| WATER CREDIT | (¤599.02) | 01/27/2021 |
| WATER CAPITAL FACILITY FEE | ¤6,848.90 | 01/27/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,013.57 |