I want to search for...
Permit #2020101157
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00410-0020 |
| CONDITIONED SPACE: 2286 sqft |
| GARAGE: 588 sqft |
| OPENED PORCH (WITH ROOF) : 307 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 3235 sqft |
| Block: 00410 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 904-268-7730 |
| Location Address: 39 RICHMOND DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/03/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES LLC A FLORIDA |
|
Address 5220 SHAD ROAD SUTE 202 JACKSONVILLE, FL 32257 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 05/26/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: THIS IS A REINSPECTION IN THE EMPTY LOTS OF TRASH AND DEBRI NO MATERIALS CAN BE LEFT IN VACANTS OR SURROUNDING LOTS The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover BY THE EMPTY LOT AND THE BACK OF THE PROPERTY IS A BARE SPOT NEED TO BE SEEDED AND COVERT W/STRAW OR PINE NEEDLES 05/20/2021=SUPER ON SITE IS NOT READY FOR INSPECTION 05/26/2021=CORRECTION WERE MADE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/25/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION IN THE EMPTY LOTS OF TRASH AND DEBRI NO MATERIALS CAN BE LEFT IN VACANTS OR SURROUNDING LOTS The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover BY THE EMPTY LOT AND THE BACK OF THE PROPERTY IS A BARE SPOT NEED TO BE SEEDED AND COVERT W/STRAW OR PINE NEEDLES 05/20/2021=SUPER ON SITE IS NOT READY FOR INSPECTION | |||
| ROW - STORMWATER FINAL | 05/20/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: IN THE EMPTY LOTS OF TRASH AND DEBRI NO MATERIALS CAN BE LEFT IN VACANTS OR SURROUNDING LOTS The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover BY THE EMPTY LOT AND THE BACK OF THE PROPERTY IS A BARE SPOT NEED TO BE SEEDED AND COVERT W/STRAW OR PINE NEEDLES 05/20/2021=SUPER ON SITE IS NOT READY FOR INSPECTION | |||
| U-CROSS CONNECTION | 05/20/2021 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation | |||
| U -UTILITY RESIDENTIAL FINAL | 05/20/2021 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/20/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: THIS IS A REINSPECTION IN THE EMPTY LOTS OF TRASH AND DEBRI NO MATERIALS CAN BE LEFT IN VACANTS OR SURROUNDING LOTS The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover BY THE EMPTY LOT AND THE BACK OF THE PROPERTY IS A BARE SPOT NEED TO BE SEEDED AND COVERT W/STRAW OR PINE NEEDLES 05/20/2021=SUPER ON SITE IS NOT READY FOR INSPECTION | |||
| BLD - BUILDING FINAL | 05/20/2021 | FINAL APPROVED | MMESSER |
| FINAL SURVEY (OFFICE USE ONLY) | 05/19/2021 | APPROVED | GBERTOLA |
| ROW - FINAL APRON (AFTER POUR) | 05/19/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: colvert elevation is good | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/19/2021 | Disapproved - NO FEE | GBERTOLA |
| Note: IN THE EMPTY LOTS OF TRASH AND DEBRI NO MATERIALS CAN BE LEFT IN VACANTS OR SURROUNDING LOTS The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover BY THE EMPTY LOT AND THE BACK OF THE PROPERTY IS A BARE SPOT NEED TO BE SEEDED AND COVERT W/STRAW OR PINE NEEDLES | |||
| ROW- PRE-APRON (PRE-POUR) | 05/04/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION COLVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. | |||
| U - SEWER TIE IN | 05/04/2021 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 04/29/2021 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 04/23/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:32 am | |||
| PEP TANK INSTALLATION REQUEST | 04/14/2021 | APPROVED - AS NOTED | CSTONE |
| Note: (driveway form may be an issue for tank install and boring company; needs to hold off on pouring driveway) | |||
| INSULATION | 03/23/2021 | APPROVED | BGREVE |
| Note: THIS IS A REINSPECTION Cancelled per John | |||
| LATH/BRICK/ WATER BARRIER | 03/23/2021 | APPROVED | BGREVE |
| INSULATION | 03/19/2021 | CANCELLED BY APPLICANT | WMILLER |
| Note: Cancelled per John | |||
| ALL ROUGH | 03/17/2021 | APPROVED | MMESSER |
| ROOF VALLEY & METAL | 03/16/2021 | APPROVED | BGREVE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/02/2021 | APPROVED | MMESSER |
| Note: THIS IS A REINSPECTION not ready | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/16/2021 | Disapproved - NO FEE | MMESSER |
| Note: not ready | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/29/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/15/2021 | APPROVED | MMESSER |
| MONOLITHIC SLAB | 01/06/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/04/2021 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/04/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 11/20/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/28/2021 | 01/29/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/28/2021 | 01/28/2021 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 10/27/2020 | 01/14/2021 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/26/2020 | 10/29/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/26/2020 | 10/30/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/26/2020 | 10/27/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/26/2020 | 10/27/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/26/2020 | 10/29/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/26/2020 | 10/27/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 10/26/2020 | 10/29/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 10/26/2020 | 10/27/2020 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 10/26/2020 | 10/28/2020 |
| Note: Released By: ELENS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 11/03/2020 |
| WATER- TURN ON | ¤25.00 | 11/03/2020 |
| ADMIN FEE | ¤20.00 | 11/03/2020 |
| CONNECTION FEES | ¤1,002.88 | 11/03/2020 |
| BUILDING DISCOUNT 100% | (¤1,430.60) | 11/03/2020 |
| ELECTRIC FEE | ¤235.80 | 11/03/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.01) | 11/03/2020 |
| IMPACT FEE FIRE | ¤367.00 | 11/03/2020 |
| IMPACT FEE PARKS | ¤1,199.12 | 11/03/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/03/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 11/03/2020 |
| MECHANICAL FEE | ¤235.80 | 11/03/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/03/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤35.97) | 11/03/2020 |
| PLAN CHECK FEE | ¤117.20 | 11/03/2020 |
| PLUMBING FEE | ¤235.80 | 11/03/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤586.00 | 11/03/2020 |
| SITE PLAN 20 | ¤20.00 | 11/03/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/03/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/03/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/03/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 11/03/2020 |
| SEWER CREDIT | (¤2,008.29) | 11/03/2020 |
| SEWER INSPECTION | ¤25.00 | 11/03/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 11/03/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 11/03/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,946.76 |