I want to search for...

Permit #2020101345

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00460-0020
CONDITIONED SPACE: 2518 sqft
GARAGE: 730 sqft
OPENED PORCH (WITH ROOF) : 310 sqft
OPENED PORCH (WITH ROOF) : 57 sqft
Total Square Footage: 3615 sqft
Block: 00460
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-931-1725
Location Address: 16 ESSEX LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/30/2020
NOC: RECORDED
Applicant name: JOSEPH ALEIXO PORTAL
Owner: PORTAL FLEISBERTO A TRUSTEE

Address

21 PRINCESS KIM LANE

PALM COAST, FL 32164

Lot: 0020
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SWEETWATER CUSTOM HOMES INC.
Status Location Address State License Number Phone Fax
INACTIVE

1105 LAMBERT AVENUE

FLAGLER BEACH, FL 32136

CBC1252965 (Exp: 08/31/2024) 386-931-1725 386-439-4676

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/05/2022 FINAL APPROVED RMARTIN
Note: THIS IS A REINSPECTION Missing termite certification. Energy calculations do not match AHU and A/C units installed. Please submit a revision to the building department for the installed units. Outlet next to 2nd window from the rear of the master bedroom has an open ground The smoke detector in the master bed needs 4" clearance from the soffit wall. The rear bathroom toilet does not have the required 15" minimum clearance from the vanity.
ROW - STORMWATER FINAL 04/05/2022 APPROVED - AS NOTED PFLANAGAN
Note: 4/5/22 at time of inspection plants are gone out of 5 foot easement Can't have any PLANTS in the 5 foot easement around property line except fence
ROW- PROJECT STATUS 04/04/2022 APPROVED GBERTOLA
Note: meeting with the builder
U-CROSS CONNECTION 04/01/2022 APPROVED - AS NOTED JHARDING
Note: No cross connections.
BLD - BUILDING FINAL 04/01/2022 Disapproved - NO FEE JWALKER
Note: Missing termite certification. Energy calculations do not match AHU and A/C units installed. Please submit a revision to the building department for the installed units. Outlet next to 2nd window from the rear of the master bedroom has an open ground The smoke detector in the master bed needs 4" clearance from the soffit wall. The rear bathroom toilet does not have the required 15" minimum clearance from the vanity.
U -UTILITY RESIDENTIAL FINAL 04/01/2022 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 04/01/2022 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 04/01/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: Can't have any PLANTS in the 5 foot easement around property line except fence
ROW FIELD SURVEY /GRADING CERTIFICATION 03/28/2022 APPROVED PFLANAGAN
FINAL SURVEY (OFFICE USE ONLY) 03/28/2022 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 03/04/2022 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Called wrong inspection. Must set temp pole do not give temp power to over head services. 2. Riser to tall on service. NEC 2017 344.30 5/25/21 Called in wrong inspection 3/4/22 Emailed FPL at 8:23 am
ROW- PRE-APRON (PRE-POUR) 02/11/2022 APPROVED - AS NOTED PFLANAGAN
Note: *There is a sidewalk going to garage but there is no sidewalk on site plan THE SIDEWALK NEEDS TO BE ON FINAL SURVEY TO PASS. *The sidewalk going to main entrence to home need to be revised do to it being formed to 4' *READY TO POUR at the time of Inspection. Note that heavy rain is in the forecast and builder should double check the elevations and that the pipe is level before pouring. If the pipe floats up at the band connection, it should be corrected before pouring.
MONOLITHIC SLAB 12/16/2021 APPROVED JWALKER
GRAVITY SEWER TEST 10/27/2021 APPROVED - AS NOTED MGIBSON
Note: THIS IS THE LAST TIME SCHEDUALING GRAVITY SEWER, BOTH GRAVITY SEWER ''AND'' U-SEWER BOTH NEED TO BE SCHEDULED BY CONTRACTOR!!!!
U - SEWER TIE IN 10/27/2021 APPROVED MGIBSON
INSULATION 09/14/2021 APPROVED TSTAUFFACHER
PEP TANK INSTALLATION REQUEST 08/17/2021 APPROVED TCHURCHILL
INSULATION 08/03/2021 APPROVED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 07/20/2021 APPROVED TSTAUFFACHER
ALL ROUGH 07/07/2021 APPROVED MMESSER
ROOF VALLEY & METAL 06/15/2021 APPROVED MMESSER
Note: THIS IS A REINSPECTION Not Complete
ROOF VALLEY & METAL 06/11/2021 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: Not Complete
ELECTRIC TEMP POLE 05/27/2021 APPROVED - AS NOTED RMARTIN
Note: THIS INSPECTION WAS DONE BY JOSH ON WRONG INSPECTION/ EMAILED FPL RELEASED POWER 9:00
ELECTRIC - EARLY POWER 05/25/2021 Disapproved - NO FEE JMUNSON
Note: THIS IS A REINSPECTION 1. Called wrong inspection. Must set temp pole do not give temp power to over head services. 2. Riser to tall on service. NEC 2017 344.30 5/25/21 Called in wrong inspection
ELECTRIC - EARLY POWER 05/07/2021 Disapproved - NO FEE JMUNSON
Note: 1. Called wrong inspection. Must set temp pole do not give temp power to over head services. 2. Riser to tall on service. NEC 2017 344.30
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2021 APPROVED TSTAUFFACHER
TIE BEAM / LINTEL 03/30/2021 APPROVED TSTAUFFACHER
Note: THIS IS A REINSPECTION Marked in green paint//multiple vertical bar do not meet coverage requirements R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm).
TIE BEAM / LINTEL 03/29/2021 Disapproved - NO FEE TSTAUFFACHER
Note: Marked in green paint//multiple vertical bar do not meet coverage requirements R404.1.3.3.7.4Support and cover. Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system to prevent displacement during the concrete placement operation. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Minimum cover for reinforcement in concrete cast in removable forms that will be exposed to the earth or weather shall be 11/2 inches (38 mm) for No. 5 bars and smaller, and 2 inches (50 mm) for No. 6 bars and larger. For concrete cast in removable forms that will not be exposed to the earth or weather, and for concrete cast in stay-in-place forms, minimum cover shall be 3/4 inch (19 mm). The minus tolerance for cover shall not exceed the smaller of one-third the required cover or 3/8 inch (10 mm).
WATER METER INSTALLATION REQUEST 03/26/2021 APPROVED CSTONE
FOUND SURVEY APPROVED (OFFICE) 03/03/2021 APPROVED TDOAK
MONOLITHIC SLAB 02/16/2021 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 02/04/2021 APPROVED JGIBSON

Review History

Department Status Date In Date Out
MECH COMPLETE 04/04/2022 04/04/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/07/2021 12/08/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 12/07/2021 12/15/2021
Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM revision for sidewalk
ZON COMPLETE 12/07/2021 12/07/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/23/2021 11/24/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM na
ELEC COMPLETE 11/23/2021 11/24/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 09/07/2021 09/07/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 08/27/2021 08/30/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 08/27/2021 08/31/2021
Note: Released By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM
ZON HOLD 08/27/2021 08/27/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit revised site plan to reflect the revised floor plan with the large concrete patio.
MECH HOLD 08/24/2021 08/24/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs say 12000 BTU minisplit. Plans say 18000 BTU. Revise to match or remove size from Floor Plan. (Second Request)
ELEC COMPLETE 08/24/2021 08/25/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 08/23/2021 08/23/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs say 12000 BTU minisplit. Plans say 18000 BTU. Revise to match or remove size from plans
MECH HOLD 08/17/2021 08/17/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide energy calcs for garage minisplit. (Second Request) R503.2 FBC Energy Conservation 2020 7Th edition
BLD COMPLETE 08/17/2021 08/17/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ELEC COMPLETE 08/17/2021 08/17/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 08/09/2021 08/10/2021
Note: Held By: HAROLD ALLEN - - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: Concrete slab is being installed. No detail provided for slab. Provide the strength of the concrete and will there be a footer?
ELEC HOLD 08/09/2021 08/10/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM upload new electric plans
MECH HOLD 08/09/2021 08/10/2021
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide energy calcs for garage minisplit.
BADMIN HOLD 08/03/2021 08/03/2021
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PLANS ARE NOT FOR FBC 2017. PLEASE RESUBMIT
BADMIN COMPLETE 08/03/2021 08/03/2021
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ZON COMPLETE 03/03/2021 03/03/2021
Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/26/2021 03/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@CI.PALM-COAST.FL.US
ZON HOLD 02/26/2021 02/26/2021
Note: Held By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM Please provide the front setback from the closest point (left side where lot is smaller).
ZON COMPLETE 11/17/2020 11/18/2020
Note: Released By: ELENS
SW1 COMPLETE 11/17/2020 11/18/2020
Note: Released By: CTROHA
ZON HOLD 11/09/2020 11/10/2020
Note: Held By: ELENS I do not see a correction form, nor a revised landscape plan. Repeat comment: Four trees are required for this site. (Need one more.) Also, please clarify the left side setback on the site plan. It is covered.
MECH COMPLETE 11/09/2020 11/09/2020
Note: Released By: CPISCITELLI
SW1 HOLD 11/09/2020 11/10/2020
Note: Held By: KRUTH SITE PLAN HAS ELEVATIONS THAT ARE TO HIGH BASED ON CENTER OF THE ROAD ELEVATIONS
BLD COMPLETE 11/09/2020 11/16/2020
Note: Released By: JPI
ENGIN1 COMPLETE 11/09/2020 11/10/2020
Note: Released By: TBAKER
BLD HOLD 10/29/2020 11/04/2020
Note: Held By: JPI 1. Roof underlayment – worksheet calls out synthetic, details call out 15# felt (unacceptable) , peel and stick and sheet 6/7 calls out 30# felt. Reconcile revise and cloud revisions 2. No lintels, soffit, or underlayment on product approval
CUSVC COMPLETE 10/29/2020 11/02/2020
Note: Released By: HHAND
ELEC COMPLETE 10/29/2020 11/02/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/29/2020 10/29/2020
Note: Released By: TBAKER
LOCATE COMPLETE 10/29/2020 11/02/2020
Note: Released By: CSTONE
MECH HOLD 10/29/2020 11/02/2020
Note: Held By: CPISCITELLI 1. Plans show R4.1 on walls. Energy Calcs say R5. Revise to match. 2. Energy Calcs and EPL card need to be signed by the builder
PLUM COMPLETE 10/29/2020 11/04/2020
Note: Released By: JPI
SW1 HOLD 10/29/2020 11/02/2020
Note: Held By: CTROHA See marked up site plan
ZON HOLD 10/29/2020 10/30/2020
Note: Held By: ELENS Four trees are required for this site. (Need one more.)
SWALE COMPLETE 10/29/2020 01/25/2021
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 04/04/2022
CONTRACTOR CHANGE ¤40.00 04/04/2022
PLAN REVIEW - REVISION ¤32.50 04/04/2022
REINSPECTION FEE ¤40.00 04/04/2022
SW ENG REINSPECTION 20 ¤20.00 04/04/2022
STORM WATER PERMIT FEES ¤80.00 11/30/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 11/30/2020
SEWER CREDIT (¤1,466.00) 11/30/2020
SEWER INSPECTION ¤25.00 11/30/2020
SEWER CAPITAL FACILITY ¤4,596.07 11/30/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 11/30/2020
NEW RESIDENTIAL INSPECTIONS ¤648.00 11/30/2020
SITE PLAN 20 ¤20.00 11/30/2020
SURCHARGE FS 533.721 ¤2.00 11/30/2020
SURCHARGE - FS 468.631 ¤2.00 11/30/2020
CONNECTION FEES ¤1,002.88 11/30/2020
METER - DEPOSIT ¤60.00 11/30/2020
WATER- TURN ON ¤25.00 11/30/2020
ADMIN FEE ¤20.00 11/30/2020
BUILDING DISCOUNT 100% (¤1,560.80) 11/30/2020
ELECTRIC FEE ¤254.40 11/30/2020
3% FIRE IMPACT FEE CREDIT (¤11.01) 11/30/2020
IMPACT FEE FIRE ¤367.00 11/30/2020
IMPACT FEE PARKS ¤1,199.12 11/30/2020
IMPACT FEE SCHOOL ¤3,600.00 11/30/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 11/30/2020
MECHANICAL FEE ¤254.40 11/30/2020
WATER -IRRIGATION INSPECTION ¤25.00 11/30/2020
3% PARKS IMPACT FEE CREDIT (¤35.97) 11/30/2020
PLAN CHECK FEE ¤129.60 11/30/2020
PLUMBING FEE ¤254.40 11/30/2020
Fees Total Due: ¤0.00 Total Paid: ¤14,661.55