Permit #2020110071
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00030-0130 |
| CONDITIONED SPACE: 1589 sqft |
| CONDITIONED SPACE: 1589 sqft |
| GARAGE: 427 sqft |
| GARAGE: 427 sqft |
| OPENED PORCH (WITH ROOF) : 114 sqft |
| OPENED PORCH (WITH ROOF) : 114 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| Total Square Footage: 4366 sqft |
| Block: 00030 |
| Subdivision: - |
| Job Phone: 386-237-1210 |
| Location Address: 65 SLUMBER MEADOW TR |
| Type: DU - DUPLEX |
| Issue Date: 11/12/2020 |
| NOC: RECORDED |
| Applicant name: ANDRIY POPOV |
| Owner: ELINA SHAKNOVSKY |
|
Address 1315 JACKSON DRIVE NORTH BRUNSWICK, NJ 08902 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
1 SEATHORN PATH PALM COAST, FL 32164 |
PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2023) | 386-237-1210 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/17/2021 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 10/12/2021 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 10/11/2021 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 10/11/2021 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/08/2021 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/08/2021 | APPROVED | GBERTOLA |
| ELECTRIC - EARLY POWER | 08/30/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION 1. Right side unit needs to be unlocked 2. 4/0 wire is not rated for 300 amps. Table 310.15(B)(16) NEC 2017 8/30/21 Emailed FPL at 8:30 am | |||
| ROW- PRE-APRON (PRE-POUR) | 08/27/2021 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION On site with sub. 8/27/21 - Culvert was originally set by the wrong BM and was 4 tenths off. Inspector allowed for corrections and revisited the inspection site as a courtesy due to the weekend weather. READY TO POUR. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/26/2021 | CANCELLED BY APPLICANT | RGROSS |
| Note: On site with sub. | |||
| ELECTRIC - EARLY POWER | 08/25/2021 | Disapproved - NO FEE | JMUNSON |
| Note: 1. Right side unit needs to be unlocked 2. 4/0 wire is not rated for 300 amps. Table 310.15(B)(16) NEC 2017 | |||
| GRAVITY SEWER TEST | 08/05/2021 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 08/05/2021 | APPROVED | JGIBSON |
| U-CROSS CONNECTION | 08/05/2021 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| LATH/BRICK/ WATER BARRIER | 07/07/2021 | APPROVED | TSTAUFFACHER |
| INSULATION | 07/07/2021 | APPROVED | TSTAUFFACHER |
| Note: Check Screws on all doors and windows. All rough was passed with this as a note. | |||
| PEP TANK INSTALLATION REQUEST | 06/23/2021 | APPROVED | CSTONE |
| ALL ROUGH | 06/22/2021 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Finish Screws in doors and windows | |||
| ELECTRIC TEMP POLE | 06/02/2021 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:40 am | |||
| ROOF VALLEY & METAL | 05/03/2021 | APPROVED | TSTAUFFACHER |
| FIREWALL DRYWALL NAILING | 04/28/2021 | APPROVED | JWALKER |
| FIREWALL FINAL | 04/28/2021 | FINAL APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/20/2021 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 03/10/2021 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 02/11/2021 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 02/03/2021 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/15/2021 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 12/17/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/10/2021 | 02/11/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 02/10/2021 | 02/11/2021 |
| Note: Released By: TDOAK | |||
| ZON | COMPLETE | 11/10/2020 | 11/10/2020 |
| Note: Released By: ELENS | |||
| BLD | COMPLETE | 11/09/2020 | 11/10/2020 |
| Note: Released By: PBUCKLEY | |||
| ZON | HOLD | 11/09/2020 | 11/10/2020 |
| Note: Held By: ELENS The correction sheet says "Orientation Revised". Please submit revised site plan for review. Repeat comment: Please submit a landscape plan for review. | |||
| MECH | COMPLETE | 11/09/2020 | 11/09/2020 |
| Note: Released By: CPISCITELLI | |||
| SWALE | COMPLETE | 11/04/2020 | 01/27/2021 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 11/03/2020 | 11/06/2020 |
| Note: Held By: JPI 1. The rear elevation appears to depict a mullion. Please provide the product approval. | |||
| CUSVC | COMPLETE | 11/03/2020 | 11/03/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 11/03/2020 | 11/04/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 11/03/2020 | 11/04/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 11/03/2020 | 11/09/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 11/03/2020 | 11/04/2020 |
| Note: Held By: CPISCITELLI 1. Orientation of Energy Calcs does not match the site plan. Revise to match the site plan. 2. Enegy calcs need to be signed by the builder. | |||
| PLUM | COMPLETE | 11/03/2020 | 11/06/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 11/03/2020 | 11/05/2020 |
| Note: Released By: CTROHA | |||
| ZON | HOLD | 11/03/2020 | 11/03/2020 |
| Note: Held By: ELENS Please submit a landscape plan for review. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - FIELD SURVEY INSPECT | ¤20.00 | 11/16/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/12/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤77.94) | 11/12/2020 |
| SEWER CREDIT | (¤3,003.47) | 11/12/2020 |
| SEWER INSPECTION | ¤25.00 | 11/12/2020 |
| SEWER CAPITAL FACILITY | ¤9,192.14 | 11/12/2020 |
| WATER CREDIT | (¤18.10) | 11/12/2020 |
| WATER CAPITAL FACILITY FEE | ¤6,748.36 | 11/12/2020 |
| METER - DEPOSIT | ¤120.00 | 11/12/2020 |
| WATER- TURN ON | ¤50.00 | 11/12/2020 |
| ADMIN FEE | ¤20.00 | 11/12/2020 |
| CONNECTION FEES | ¤2,005.76 | 11/12/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 11/12/2020 |
| BUILDING DISCOUNT 100% | (¤1,884.20) | 11/12/2020 |
| ELECTRIC FEE | ¤300.60 | 11/12/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤22.02) | 11/12/2020 |
| IMPACT FEE FIRE | ¤734.00 | 11/12/2020 |
| IMPACT FEE PARKS | ¤2,398.24 | 11/12/2020 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 11/12/2020 |
| IMPACT FEE TRANSPORTATION | ¤2,598.00 | 11/12/2020 |
| MECHANICAL FEE | ¤300.60 | 11/12/2020 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 11/12/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤71.95) | 11/12/2020 |
| PLAN CHECK FEE | ¤160.40 | 11/12/2020 |
| PLUMBING FEE | ¤300.60 | 11/12/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤802.00 | 11/12/2020 |
| SITE PLAN 20 | ¤20.00 | 11/12/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/12/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/12/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤28,092.02 |